0% found this document useful (0 votes)
48 views2 pages

ITP-Sub Structure Concreting Works-R-03

Uploaded by

MANAS K. DUTTA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views2 pages

ITP-Sub Structure Concreting Works-R-03

Uploaded by

MANAS K. DUTTA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Issue Date: 11/05/2024

Inspection and Test Plan Rev: 03


Page 1 of 2
Project Title: API Racecourse Villas Client: API
Contractor: Second Construction Co ltd ITP Ref.: API-TSC-RCV-ITP-012 Date: 11/05/2024
Activity: Sub Structure Construction
Inspection Stages
Verifying
SN Description of Inspection Type of Inspection Remarks
Documents
Subcontractor Contractor Consultant

1.0 Documents Submittal


Approved Shop
Shop drawings Drawings and
1.1 Review of Documents - H R, A
Document
Transmittal.
Approved Method
1.2 Method Statement Review of Documents - H R, A
Statement
1.3 Pre-qualification for Concrete Batch Plant Review of Documents PQ approval H H R, A

1.4 Concrete Mix Design Review of Documents Mix Design Approval H H R, A

1.5 Reinforcement- Material Submittal Review of Documents Approved Drawings H H R, A


Testing to be
Approved Drawings, carried out as
1.6 Reinforcement- Delivery MIR material submittal, H H I, A per frequency
method statement mentioned in
specs
2.0 Pre-pouring Inspection
Test Report of In-situ Submit Test
2.1 Earthwork for Blinding Visual H H H
Density Test. Report
2.2 Setting out lines & levels Visual Approved Drawings - H W

2.3 Formworks Visual Approved Drawings H H I, A

2.4 Reinforcement Visual Approved Drawings H H I, A

2.5 Civil Items (joints, water stop, etc.) Visual Approved Drawings H H I, A

H – Hold Point W – Witness Point R – Review Point A – Approval I – Inspection


Issue Date: 11/05/2024
Inspection and Test Plan Rev: 03
Page 1 of 2
Project Title: API Racecourse Villas Client: API
Contractor: Second Construction Co ltd ITP Ref.: API-TSC-RCV-ITP-012 Date: 11/05/2024
Activity: Sub Structure Construction
Inspection Stages
Verifying
SN Description of Inspection Type of Inspection Remarks
Documents
Subcontractor Contractor Consultant

Approved Drawings
2.6 MEP Embedded Items, Cut-out/boxes Visual H H I, A
or MEP Clearance
Use Inspection RFI and Approved
2.7 Pre-pouring Inspection H H I, A
Request Method Statement

3.0 Concrete Placement


Concrete
3.1 Verification of delivered concrete to site Class/Delivery note Delivery Note H H W
verification
Test Report on
Cube sample Slump, Sampling and
3.2 Sampling and testing of fresh concrete Mix Design H H W
Temp. Testing of
Fresh Concrete
TPL Inspection
3.3 Concrete Placement Visual H H W
Report.
4.0 Post Concrete
Approved Method
4.1 Deforming (if required) Visual H H W
Statement
TDS of Concrete
4.2 Repair (if needed) Visual H H W
Repair Material.
Approved Method
4.3 Curing and Protection Visual H H W
Statement
Approved Method
4.4 Removal of Forms Visual H H W
Statement

H – Hold Point W – Witness Point R – Review Point A – Approval I – Inspection