0% found this document useful (0 votes)
85 views2 pages

Power Optimizer: Solaredge'S Most Advanced, Cost

S

Uploaded by

shashi.marale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views2 pages

Power Optimizer: Solaredge'S Most Advanced, Cost

S

Uploaded by

shashi.marale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

POWER OPTIMIZERS

Power Optimizer
S1200

25
YEAR
WARRANTY

SolarEdge’s most advanced, cost-effective Power Optimizer for


commercial and large field installations
Greater Energy Yields Lower BOS Costs
High efficiency (99.5%) with module-level Flexible system design enables maximum
MPPT, for maximized system energy space utilization and up to 2x longer string
production and revenue, and fast project ROI lengths, 50% less cables, fuses and
combiner boxes
Supports high power and bifacial PV modules,
and high string current for more power per Supports connection of two PV modules in
string series with easy cable management and fast
installation times
Maximum Protection with Built-In Safety
Simpler O&M
Designed to automatically reduce high DC
voltage to touch-safe levels, upon grid/inverter Module-level system monitoring enabling
shutdown, with SafeDC™ pinpointed fault detection and remote,
time-saving troubleshooting
Includes SolarEdge Sense Connect, allowing
continuous monitoring to detect overheating
due to installation issues or connector-level
wear and tear

solaredge.com
Power Optimizer
S1200
S1200 Unit
INPUT
Rated Input DC Power(1) 1200 W
Absolute Maximum Input Voltage (Voc) 125 Vdc
MPPT Operating Range 12.5 – 105 Vdc
Maximum Short Circuit Current (Isc) of connected PV Module 15 Adc
Maximum Efficiency 99.5 %
Weighted Efficiency 98.8 %
Overvoltage Category II
OUTPUT DURING OPERATION
Maximum Output Current 20 Adc
Maximum Output Voltage 80 Vdc

OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM INVERTER OR OFF)


Safety Output Voltage per Power Optimizer 1 Vdc
STANDARD COMPLIANCE
EMC FCC Part 15, IEC 61000-6-2, and IEC 61000-6-3 - Class B, EN 55011
Safety IEC62109-1 (class II safety)
Material UL94 V-0, UV Resistant
RoHS Yes
Fire Safety VDE-AR-E 2100-712:2013-05
INSTALLATION SPECIFICATIONS
Maximum Allowed System Voltage 1000 Vdc
Dimensions (W x L x H) 129 x 155 x 59 / 5.08 x 6.10 x 2.32 mm / in
Weight 1106 / 2.4 gr / lb
Input Connector MC4(2)
Short Input Option: 0.1 / 0.32
Input Wire Length m / ft
Long Input Option: 1.6 / 5.24(3)
Output Connector MC4
Option 1: (+) 5.3 (-) 0.10 / (+) 17.38 (-) 0.32
Output Wire Length(4) m / ft
Option 2: (+) 2.7 (-) 0.10 / (+) 8.8 (-) 0.32
Operating Temperature Range (5)
-40 to +85 / -40 to +185 ˚C / ˚F
Protection Rating IP68 / NEMA6P
Relative Humidity 0 - 100 %

(1) Rated power of the module at STC will not exceed the Power Optimizer Rated Input DC Power. Modules with up to +5% power tolerance are allowed.
(2) For other connector types please contact SolarEdge.
(3) For S-Series models with long input cables (1.6m / 5.24ft), the Sense Connect feature is only enabled on the output cable connector.
(4) Option 1 fits best when modules are placed in landscape orientation or in portrait orientation with the power optimizers connected using the leapfrog wiring method.
Option 2 fits best when modules are placed in portrait orientation.
(5) For ambient temperatures above +65°C / +149°F power de-rating is applied.

230/400V Grid
PV System Design Using a SolarEdge 230/400V Grid 230/400V Grid 230/400V Grid 277/480V Grid
SE16K, SE17K,
Inverter(6)(7)(8)(9) SE27.6K* SE30K* SE33.3K* SE40K*
SE25K*
Compatible Power Optimizers S1200
Power Optimizers 14 14 15 14 15
Minimum String Length
PV Modules 27 27 29 27 29
Power Optimizers 30 30 30 30 30
Maximum String Length
PV Modules 60 60 60 60 60
Maximum Continuous Power per String 15000 15500 17000 15000 17000
1 string – 17250 1 string – 17750 1 string – 19250 1-2 strings – 17250 1-2 strings – 19250
Maximum Allowed Connected Power per String(9) 2 strings or more – 2 strings or more – 2 strings or more – 3 strings or more – 3 strings or more –
20000 20500 23000 20000 23000
Parallel Strings of Different Lengths or Orientations Yes
Maximum Difference in Number of Power Optimizers
Allowed Between the Shortest and Longest String 5 Power Optimizers
Connected to the Same Inverter Unit

* The same rules apply for Synergy units of equivalent power ratings, that are part of the modular Synergy Technology inverter.
(6) S1200 cannot be mixed with any other Power Optimizers models in the same string.
(7) For each string, a Power Optimizer may be connected to a single PV module if 1) each Power Optimizer is connected to a single PV module or 2) it is the only Power Optimizer connected
to a single PV module in the string.
(8) For SE16K and above, the minimum STC DC connected power should be 11KW.
(9) To connect more STC power per string, design your project using SolarEdge Designer.

© SolarEdge Technologies, Ltd. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc.
All other trademarks mentioned herein are trademarks of their respective owners. Date: September 14, 2022 DS-000122-ROW. Subject to change without notice.