Megha Engineering & Infrastructures Ltd

An ISO 9001-2008 Company


#10,1st Floor, 3rd Main, 16th Cross, G.D Park Extension, Vyalikaval, Bangalore-560003
Tel: +91-80-23311722, Fax: +91-80-23311723 Email:[email protected]
CIN No.:U45202AP2006PLC050271

MEIL/BWSSB-TG Halli WSS/2024-25/16 Date: 12.11.2024

To
Executive Engineer(K – O&M)-3,
BWSSB, CRS Water Works,
Thippagondanahalli,
Bangalore – 562130.

Sub: The work of Revival / Refurbishment of TG Halli Water Supply Scheme Phase - 1
(Turnkey Basis)–Issuing of Completion Certificate (CC) and Taking over certificate
(TOC) of project works - Reg.

Ref: 1. Agreement /BWSSB/CE (K)/07/2018-19 Dated: 06.03.2019


2. MEIL/BWSSB-TGHalliWSS/2024-25/11, Dt: 25.09.2024
*****

Dear Sir,

With reference to the subject and the tender agreement cited above, we are pleased to
inform you that the 20 MLD Sewage Treatment Plant (STP) has been successfully commissioned
and has been operational since October 2023. Additionally, the 110 MLD Water Treatment Plant
(WTP) was completed and commissioned in March 2024, though initially without the ozone unit.
We are happy to report that the ozone unit was installed and successfully commissioned in July
2024, and the entire system is now operating smoothly.

Furthermore, we have laid and commissioned approximately 22 kilometers of Mild Steel


(MS) pipes, which have been in operation since commissioning. The full system, comprising the
STP, WTP, pumps and motors at the Tavarekere pump house, related works, and pipelines, is
currently operated for 12 hours daily without any significant issues.

In accordance with Tender Clause 61.1 (Page 0348), we respectfully request your office to
take over the project for the operation and maintenance (O&M) of the STP and TSPS,
effective from 1st November 2023. Additionally, we request the takeover of the WTP at TG
Halli, the Tavarekere pump house, and the pipelines, effective from 1st July 2024. These
systems are fully operational and have been running as per the client's requirements without any
notable issues, as stipulated in the tender agreement.

Page 1 of 2
Megha Engineering & Infrastructures Ltd
An ISO 9001-2008 Company
#10,1st Floor, 3rd Main, 16th Cross, G.D Park Extension, Vyalikaval, Bangalore-560003
Tel: +91-80-23311722, Fax: +91-80-23311723 Email:[email protected]
CIN No.:U45202AP2006PLC050271

Please note that the detailed equipment testing reports will be submitted in due course. In
the interim, we kindly request your office to take over the Project for Operation and Maintenance.

We look forward to your prompt response and confirmation of the takeover.

Thanking you and assuring our best services at all the times.

Yours faithfully,
For Megha Engineering & Infrastructures Limited

(Authorized Signatory)

1. The Chief Engineer (K-O&M), 6th Flore, Cauvery Bhavan BWSSB, Bangalore: For your
kind information.

2. The Additional Chief Engineer, ACE(K-O&M)-2, 2nd Flore, Suvarna Bhavan BWSSB,
Malleshwaram, Bangalore: For your kind information.

3. Tata Consulting Engineers Limited, Cunningham Road, Vasanth Nagar, Bangalore,


560051: For your kind information and further needful.

Page 2 of 2