Plumbing 01

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SEPTIC TANK

3400 GT
3400
100 1500 100 750 100 750 100 CB CB
4" O PVC SOIL
100 1500 100 750 750 SINK STACK PIPE
10mm O MATT. BARS 100 100 MH MH MH 4" O PVC SOIL
CO CO CO CO STACK PIPE

TO MAIN SEWER LINE


SPACED @ 200mm O.C.B.W

100

6"O DRAINAGE PIPE


100

300
AIR

345
AIR AIR 2" O PVC WASTE PIPE

6"O PVC DRAINAGE PIPE


SPACE SPACE SPACE
SINK
WATER LEVEL
INLET
OUTLET WATER LEVEL
OUTLET

CO CO CO
WATER LEVEL
4" O PVC SOIL PIPE

L/2
4" O PVC SOIL PIPE
LEACHING LEACHING

1600

1400
VTR.

2069
CHAMBER CHAMBER
1400

1200

MH MH DIGESTION VTR.
MH CHAMBER
LAV FD
SINK 2" O PVC WASTE
WC
100mmO STACK PIPE FD
SANITARY TEE 100mmO 2" O PVC WASTE PIPE
WC
LAV
SANITARY TEE 2" O PVC WASTE
100mm THK. CHB STACK PIPE

L/2
CO 2069 w/ 10mm
HOR. & VER.
WC

@600 mm O.C.B.W

FD 2" O PVC WASTE PIPE


100

2% SLOPE
VTR.

100
LAV
FD VTR.
100mm THK WITH 10mm O
INLET
PLAN SPACED @ 300mm
BOTHWAYS
2" O PVC WASTE
STACK PIPE
WC
LAV

DN.
2" O PVC WASTE

6"O PVC DRAINAGE PIPE


SECTION 2" O PVC WASTE PIPE
STACK PIPE

UP
6"O PVC DRAINAGE PIPE
1 SEPTIC TANK DETAILS
P-1 NOT TO SCALE

CB CB
2" O PVC WASTE
STACK PIPE

TO MAIN SEWER LINE

TO MAIN SEWER LINE


15mm O HANDLE BAR
75mm O PVC DS 600 75mm O PVC DS
150mmO CPD, 2% SLOPE
NGL. FD FD

100 400 100

100
150mmO CPD, 2% SLOPE
100

150mmO CPD, 2% SLOPE


INLET

600 SECOND FLOOR D.W.S.V. PLAN


100mm CHB THK 5
400
600

OUTLET INLET WITH 10mm O REBARS 1:200 M


P-1 SCALE
OUTLET REBARS:
HOR. @ 2 - layer
4 GROUND FLOOR D.W.S.V. PLAN
P-1 SCALE 1:200 M
VER. @ 600mm O.C
150
100

3/4" O PPR. PIPE HB


3-10mm O REBARS
PLAN SINK

SECTION
3/4" O PPR. PIPE
SINK

1" O COLD WATER DISTRIBUTION LINE


2 CATCH BASIN DETAILS 1" O PPR. PIPE COLD WATER
P-1 NOT TO SCALE 1" O COLD WATER
RISER 3/4" O PPR. PIPE
RISER

SH WC
SH LAV
LAV 3/4" O PPR. PIPE
LAV WC

WC

SH

LAV

100 800 100 100 800 100

DN.
CO MH CO SH WC LAV

100mm CHB THK HB


100

100

1" O COLD WATER DISTRIBUTION LINE


3/4" O PPR. PIPE
WITH 10mm O REBARS

UP
REBARS:
INLET HOR. @ 2 - layer
VER. @ 600mm O.C
600

600

100mmO
MH SANITARY TEE
OUTLET
OUTLET

2% SLOPE
100

100

HB

TILED FINISH

INLET

PLAN SECTION

3 GREASE TRAP DETAILS WM


CV
7 SECOND FLOOR WATER LINE LAYOUT
P-1 NOT TO SCALE GV
P-1 SCALE 1:200 M
FROM WATER MAIN SOURCE

6 GROUND FLOOR WATER LINE LAYOUT


P-1 SCALE 1:200 M

OCCIDENTAL MINDORO TITLE/PROBLEM: STUDENT: PLATE NO.

STATE COLLEGE- MAIN CAMPUS TWO-STOREY, 4 BEDROOM RESIDENTIAL MIKE FRANCIS A. BACULO 01 P
COURSE AND YEAR SUBJECT: INSTRUCTOR: SHEET NO. 1 2
BS IN ARCHITECTURE 3A BUILDING TECHNOLOGY 04 AR. RONWELDO N. SOMINTAC, UAP 01

You might also like