increase 5%
Target Operative Income = Capital Invested X
283200 1180000
/ Room-nights 22,800
target contribution margin per room-night $29.92
Total Room-Night
22,800
% Reduction 4%
2021
Batch-level costs Cost per Batch X Number of Batches / Unito Produced
203.428571428571 $8,900 80 3,500
2021 Manu Op Cost per Unit Cost per Mac Ho x Num. of Mac Hours /Unit Produced
268 67 14,000 3,500
2021 Eni Change Cost Cost per Eng Chax Number of changes /Unit Produced
40 7,000 20 3,500
2022
Batch-level costs Cost per Batch X Number of Batches / Unito Produced
221.142857142857 $8,600 90 3,500
2021 Manu Op Cost per Unit Cost per Mac Ho x Num. of Mac Hours /Unit Produced
256 64 14,000 3,500
2021 Eni Change Cost Cost per Eng Chax Number of changes /Unit Produced
28 12,250 8 3,500
Target Manuf. Cost per Unit Man. Cost per Unx Target Ratio
1786.56 $1,861 96%
Actual Results for 2021 Actual Results for 2022
Units of HJ6 produced 3,500 3,500
Direct material cost per u $1,350 $1,300
Total number of batches 80 90
Total machine-hours requ 14,000 14,000
Number of engineering 20 8
Selling price x
Year 2 $100 x
Years 3 and 4 $90 x
Total
1580000
1020000
Number of
= Revenue
units sold
1,020,000 = $102,000,000
305,000 = $27,450,000
$129,450,000
Number of Seats Expected to Be Sold
Price Charged Variable Cost per Ticket Business Pleasure
$700 $70 230 115
2,200 190 220 45
Assume that round trip fuel cost are fixed cost 24900
Number
Contribution margin× of passengers
Business $630 230
Pleasure $630 115
Number
Contribution margin× of passengers
Business $2,010 220
Pleasure $2,010 45
# of passengers
at price
[1-( $2,100 /
level:
Pleasure [1-( 45 /
Total contribution margin
Business Pleasure
$144,900 $72,450
$442,200 $90,450
Total
=contribution margin
$144,900
$72,450
Total
=contribution margin
$442,200
$90,450
# of passengers Percent
at price )]x
$800 Changed
level: 100% =
) ] x 100%
230 4.347826087 %
=
) ] x 100%
115 60.86956522 %
=