Masonry Works
Item 1046(2)a1 masonry Units (100m Wall)
Item 1046(2)a2 masonry Units (150m Wall)
Finishing Works
200 x 200 mm Vitrified Glazed Tiles Wall Finish
200 x 200 mm Vitrified Unglazed Tiles Wall Finish
Plain Cement Finish with Floor hardener non-skid
Non-skid Cement Floor Finish with 6 mm groove lines
Plain Cement Plaster Finish
Carpentry Works
Carpentry for Ceiling with Insulation
Painting Works
Electrical Works
Conduit, Boxes, and Fitting
Raceway Conduit, PVC Flexible Conduit 20mm Diameter
Wall Fan Outlet
Light Outlets 12-2/36W, FLF
Light Outlets 6-2/36W, FLF
Light Outlets 10-1/36W, FLF
Light Outlets 4-18W, CLF
Duplex Convenience Outlet, 15 amps, 240 volts
Weatherproof Duplex Convenience Outlet, 15 amps, 240 volts
Downspout/Storm Drainage
Sanitary Fixtures
Lavatory
Water Closet
Elevated Water Tank
Septic Tank
Catch Basin