This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46742224276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
01/12/2023 467420 29/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 4
Single wire rope ,16.0 mm diameter,10 ft long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. UN29/3/1 TO UN29/3/4
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
18729/003 09/03/2023 3.30 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46742124276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
01/12/2023 467419 29/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,22.0 mm diameter,30.0 ft long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eye at one end and soft eye at other end. 5704/2/1
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
13102 17/04/2023 6.20 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46742024276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
01/12/2023 467418 29/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 3
Single wire rope ,14.0 mm diameter,4.0 ft long ,IWRC,6X36,Galvanized, 1960N/mm2,
UN29/2/1 TO UN29/2/3
Mechanically spliced with aluminum ferrules, hard eyes at both ends.
Wire is stamped with the identification number and workload limit.
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
184729/002 09/03/2023 2.50 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46741924276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
01/12/2023 467417 29/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 2
Four leg wire rope sling ,13.0 mm diameter,8.0 ft long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. connected to master
UN29/4/1,UN29/4/2
link assembly
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
18729/004 09/03/2023 4.58 Tonnes @ 0-45 Deg with vertical
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Four leg wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46741824276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
01/12/2023 467416 29/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
15 X Single Wire Rope Sling, wire rope size: 10.0 mm diameter, wire rope length: 2.0 ft long,
6X36, IWRC, mechanically Spliced with Aluminum Ferrules, Hard Eye at both ends.
E1 TO E15
Sling is stamped with the identification number and workload limit.
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
431346 12/04/2023 1.30 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling has been inspected in accordance with The British Standard: BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46741724276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
01/12/2023 467415 29/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 10
Single wire rope ,26.0 mm diameter,33.50 ft long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. connected to master
UN87/17/1 TO UN87/17/10
link at both ends
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
18487/017 14/07/2021 SWL : 8.67 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Master links have been inspected in according to British Standard BS EN 1677-4:2000+A1:2008.
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46741624276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
01/12/2023 467414 29/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 20
Single wire rope ,26.0 mm diameter,33.50 ft long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. connected to master
22389/1 TO 22389/20
link at both ends
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
351560 29/09/2021 SWL : 8.67 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Master links have been inspected in according to British Standard BS EN 1677-4:2000+A1:2008.
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46716524276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
25/11/2023 467163 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company A/R YARD Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,26.0 mm diameter,10.20 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eye at both end terminated with master link
UN87/17/4
at both end
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
18487/017 14/07/2021 8.66 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46716124276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467159 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,13.0 mm diameter,0.6 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, HARD eyes at both end. 225/10
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
0178967 11/09/2007 2.1 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46716024276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467158 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,19.0 mm diameter,4.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, SOFT eyes at both end. EL49579/11
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
EL49579/11 05/12/2019 5.0 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46715924276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467157 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,19.0 mm diameter, 4.0 m long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends 29/9
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
29/4 27/02/2019 4.63 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46715824276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467156 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :4
Single wire rope ,16.0 mm diameter,1.20 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, SOFT eyes at both end. 5097/20/(1,2,3,4)
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
11581 3.3 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46715724276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
08/11/2023 467155 06/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,22.0 mm diameter,4.50 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, HARD eyes at both end. 1315275
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
1315275 01/01/2018 6.2 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46715624276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467154 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :2
Single wire rope ,13.0 mm diameter,2.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, SOFT eyes at both end. EL49579/5,EL49579/3
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
EL46579/5 05/12/2019 2.0 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46715524276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467153 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,16.0 mm diameter,7.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, SOFT eyes at both end. 69/24
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
69/24 02/06/2019 3.29 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46715424276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467152 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company BOP HOSES Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :2
Single wire rope ,16.0 mm diameter,1.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, HARD eyes at both end. 227/15,227/1
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
0178976 11/09/2017 3.3 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46715324276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467151 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 2
Single wire rope ,14.0 mm diameter, 3.20 m long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends 5097/31/1,5097/31/2
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
11592 20/02/2022 16.60 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46715224276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467150 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,36.0 mm diameter, 5.0 m long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends connected to master link
13152/8
at one end .
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
13152/8 02/05/2018 16.60 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46715124276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467149 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,36.0 mm diameter, 3.10 m long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends connected to master link
UN431/2
at one end and fitted to CROSBY hook at other end .
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
UN431/2 01/01/2015 16.0 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46715024276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467148 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,22.0 mm diameter,4.50 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both end. 1315274
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
1315274 01/01/2018 6.20 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46714924276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467147 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,20.0 mm diameter,4.60 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, soft eyes at both end. 1315241
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
1315241 01/01/2018 5.10 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46714824276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467146 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 2
Single wire rope ,38.0 mm diameter, 3.0 m long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends connected to master link
24810/3,24810/4
at one end and fitted to CROSBY hook L322AN (SWL : 16.0 Tonnes) at other end .
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
354219 24/10/2021 16.0 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46714724276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467145 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,22.0 mm diameter,4.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both end. UN18/3/2
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
UN18/3/2 02/08/2016 6.8 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46714624276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467144 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 4
Single wire rope ,26.0 mm diameter,12.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, SOFT eyes at one end and hard eye at other
4241/4/1,4241/4/2,4241/4/3,4241/4/4
end.
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
9776 01/04/2020 8.66 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46714524276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467143 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 2
Single wire rope ,26.0 mm diameter,14.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, SOFT eyes at one end and hard eye at other
4241/5/1,4241/5/2
end.
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
9777 08/04/2020 8.66 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46714424276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467142 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,20.0 mm diameter,4.50 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, SOFT eyes at both ends. EL49579/9
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
EL49579/9 05/12/2019 5.0 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46714324276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
28/11/2023 467141 26/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 4
Single wire rope ,19.0 mm diameter,3.30 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, SOFT eyes at both ends. UN567/3,UN567/2,UN567/1,UN567/4
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
18729/065 01/05/2022 4.67 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46712024276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467118 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company rig floor Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,10.0 mm diameter,0.90 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eye at both end 44/8
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
338914 28/06/2021 1.3 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46711924276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467117 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,13.0 mm diameter,0.6 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, HARD eyes at both end. 225/19
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
0178967 11/09/2017 2.1 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46711724276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467115 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,16.0 mm diameter,7.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, soft eyes at both end. 69/34
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
69/34 05/10/2019 3.29 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46711624276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467114 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company under rig floor Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,13.0 mm diameter,0.80 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 13190/39
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
S13190/03-B 06/08/2018 2.16 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46711524276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467113 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,14.0 mm diameter,1.55 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, SOFT eyes at both ends. 5097/18/1,5097/18/2
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
11579 20/02/2022 2.50 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46711424276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467112 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company CELLAR DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,16.0 mm diameter,1.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 13190/44
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
S13190/04-B 06/08/2018 3.29 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46711324276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467111 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company CELLAR DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,16.0 mm diameter,1.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 13190/47
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
S13190/04-B 06/08/2018 3.29 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46711224276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467110 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company cellar deck Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,10.0 mm diameter,0.95 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eye at both end 44/14
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
338914 1.3 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46711124276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467109 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company cellar deck Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,10.0 mm diameter,0.95 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eye at both end 44/11
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
338914 1.3 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46711024276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467108 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company CELLAR DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,16.0 mm diameter,1.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 13190/49
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
S13190/04-B 06/08/2018 3.29 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46710924276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467107 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MAIN DECK Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,16.0 mm diameter,5.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. A127402
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
S13190/05-B 05/03/2013 3.29 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46710824276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467106 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company HOSES STATION (STBD) SIDE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 2
Single wire rope ,13.0 mm diameter,1.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, SOFT eyes at both ends. 13190/22,13190/23
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
S13190/02-B 2.16 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46710724276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467105 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,19.0 mm diameter,4.5 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 4185/13/1,4185/13/2
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
4185/13 02/02/2020 4.62 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46710624276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467104 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 5
Single wire rope ,19.0 mm diameter,4.5 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
5097/30/2,5097/30/3,5097/30/5,5097/3
Mechanically spliced with aluminum ferrules, hard eyes at both ends.
0/1,5097/30/4
Wire is stamped with the identification number and workload limit.
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
11591 20/02/2022 4.67 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46710524276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467103 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 4
Single wire rope ,16.0 mm diameter,3.10 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 5097/21/1 TO 5097/21/4
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
11582 20/02/2022 3.30 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46710424276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467102 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 2
Single wire rope ,14.0 mm diameter,3.20 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 5097/31/1,5097/31/2
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
11592 20/02/2022 2.50 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46710324276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467101 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company store Abu Rudeis BS EN 12385-1/2:2002+A1:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,19.0 mm diameter, 7.0 m long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at one end and plain at other end 122/4
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
122/3 02/10/2019 4.63 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 12385-1/2:2002+A1:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46710224276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467100 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 3
Single wire rope ,14.0 mm diameter,1.25 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, soft eyes at both ends. 5097/19/1 TO 5097/19/3
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
11580 20/02/2022 2.50 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46710124276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467099 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 12385-1/2:2002+A1:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,16.0 mm diameter, 90.0 m long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at one end and plain at other end EL50402
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
EL50402 05/01/2020 3 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 12385-1/2:2002+A1:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46710024276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467098 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,38.0 mm diameter,2.90 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends terminated master link 1315277
at end
Wire is stamped with the identification number and workload limit.
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
1315277 06/01/2018 17 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46709924276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467097 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,19.0 mm diameter,3.80 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends 4/9
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
1004/1/14 26/07/2017 4.63 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46709824276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467096 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,19.0 mm diameter,4.5 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, soft eyes at both end. EL49579/12
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
EL49579/12 05/12/2019 5.0 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46709724276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467095 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,19.0 mm diameter,4.5 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, soft eyes at both end. 4/11
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
1004/1/16 26/07/2017 4.63 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46709624276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467094 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company store Abu Rudeis BS EN 12385-1/2:2002+A1:2008
Description and identification of the Equipment Equipment ID
Quantity : 2
Single wire rope ,19.0 mm diameter, 9.0 m long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at one end and plain at other end 29/10,29/11
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
29/5 27/02/2019 4.63 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 12385-1/2:2002+A1:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46709524276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467093 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,28.0 mm diameter,4.20 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both end. EL49579/13,EL49579/14
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
EL49579/1 05/12/2019 10.0 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46709424276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467092 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company main deck Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,20.0 mm diameter,7.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, soft eyes at both end. 28/17
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
28/17 05/06/2019 4.63 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46707224276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
26/11/2023 467070 24/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company life boat Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,19.0 mm diameter,1.25 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, HARD eyes at both end. 12132/6
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
210522/124 02/05/2016 4.63 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46707124276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
26/11/2023 467069 24/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 12385-1/2:2002+A1:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,16.0 mm diameter,74.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at one end and plain at other end 12132/4
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
12132 04/09/2016 3.29 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 12385-1/2:2002+A1:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46707024276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467068 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company BOP HOSES Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :2
Single wire rope ,13.0 mm diameter,0.60 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, HARD eyes at both end. 225/20
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
0178967 11/09/2017 2.10 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46706924276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467067 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company bop hoses Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,16.0 mm diameter,1.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 13190/52
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
S13190/04-B 06/08/2018 3.29 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46706824276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467066 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company BOP HOSES Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 6
Single wire rope ,10.0 mm diameter, 1.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 44/7,44/3,44/18,44/5,44/30,44/1
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
338914 1.30 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46706724276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467065 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company BOP HOSES Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 6
Single wire rope ,10.0 mm diameter, 1.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 44/27,44/13,44/29,44/12,44/15,44/2
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
338914 28/06/2021 1.30 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46706624276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467064 24/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company BOP Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :4
Single wire rope ,38.0 mm diameter,2.5 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
PH56037-1,PH56037-4,PH56037-2,P
Mechanically spliced with aluminum ferrules, HARD eyes at both end.
H56037-2
Wire is stamped with the identification number and workload limit.
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
PH56037 02/05/2016 18.50 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46706524276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
26/11/2023 467063 24/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company MUD PUMP Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 3
Single wire rope ,13.0 mm diameter,0.60 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 225/7,225/15,225/14
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
0178967 11/09/2017 2.10 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46706424276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
26/11/2023 467062 24/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company rig tong Abu Rudeis BS EN 12385-1/2:2002+A1:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,16.0 mm diameter,74.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at one end and plain at other end 12132/3
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
12132 04/09/2016 3.29 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 12385-1/2:2002+A1:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46706324276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467061 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STAND PIPE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,13.0 mm diameter,0.6 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 13113/1
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
13113/1 05/12/2017 2.10 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46706224276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467060 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STAND PIPE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,13.0 mm diameter,0.6 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 225/3
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
225/3 05/04/2017 2.10 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46706124276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467059 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company RIG FLOOR Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 2
Single wire rope ,19.0 mm diameter,4.5 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. 29/12,29/9
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
29/6 27/02/2019 4.63 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46706024276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467058 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company HANG LINE Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,32.0 mm diameter,35 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at both ends. UN92/1/1
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
UN92/1/1 05/04/2017 13.11 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46705924276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467057 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company rig floor Abu Rudeis BS EN 12385-1/2:2002+A1:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,22.0 mm diameter,25 FT long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at one end and plain at other end 46/13
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
46/13 06/05/2021 6.20 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 12385-1/2:2002+A1:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46705824276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467056 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company STORE Abu Rudeis BS EN 12385-1/2:2002+A1:2008
Description and identification of the Equipment Equipment ID
Quantity : 1
Single wire rope ,20.0 mm diameter,8.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, hard eyes at one end and plain at other end 09/18H86909
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
H86909 01/09/2018 5.10 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 12385-1/2:2002+A1:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy
CERTIFICATE OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT
This report complies with the requirements of the Provision and Use of Work Equipment Regulations 1998 And the Lifting Operations and
Lifting Equipment Regulations 1998
46705724276
Thorough Examination Date Certificate Number Next Examination Due Date Order No
27/11/2023 467055 25/05/2024
Name and address of Customer Examination Address Current Location Reference Standard
EDC- Egyptian Drilling Company main deck Abu Rudeis BS EN 13414-1:2003+A2:2008
Description and identification of the Equipment Equipment ID
Quantity :1
Single wire rope ,20.0 mm diameter,7.0 M long ,IWRC,6X36,Galvanized, 1960N/mm2,
Mechanically spliced with aluminum ferrules, soft eyes at both end. 29/15
Load Test Certificate Number Date of Load Test Safe Working Load Date of Last thorough examination
29/7 27/03/2019 4.63 Tonnes
Is this first examination after installation No Was the examination carried out within 6 months Yes
Has the Equipment been installed correctly Yes Was the examination carried out within 12 months No
In Accordance with examination scheme Yes After the occurence of exceptional circumstances No
Identification of any part found to have defect
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above
NONE
Particulars of any tests carried out as part of thorough examination. And standard applied
Single wire rope sling have been inspected in accordance with The British Standard :
BS EN 13414-1:2003+A2:2008
Is The Equipment Safe To Operate Yes Stamp
Name and Signature of the person issue this Name and Signature of the person authenticating
certificate this certificate
Loay Kadry Mohamed Serafy