Outline: Oral Test Introduction To PGRE Need For PGRE Future Programs

Download as pdf or txt
Download as pdf or txt
You are on page 1of 22

OUTLINE

• ORAL TEST
• Introduction to PGRE
• Need for PGRE
• Future Programs

Committee 24-Education & Training


TEST- Question #1

Committee 24-Education & Training


TEST- Question #2

Committee 24-Education & Training


TEST- Question #3

Committee 24-Education & Training


TEST- Question #4

Committee 24-Education & Training


TEST- Question #5

Committee 24-Education & Training


Practical Guide to Railway Engineering

• STEP 1 in the Solution


• Realistic Need / Value
• 800-pages
• 13 Chapters
• 1200-years combined
experience
• 50 + Contributors

Committee 24-Education & Training


Introduction to PGRE
Chap. 1 - Railway Development
Chap. 2 - Railway Industry Overview
Chap. 3 - Basic Track
Chap. 4 - ROW and Roadbed
Chap. 5 - Drainage
Chap. 6 - Railway Track Design
Chap. 7 - Communications & Signals

Committee 24-Education & Training


Introduction to PGRE
Chap. 8 - Railway Structures
Chap. 9 - Railway Electrification
Chap. 10 - Passenger / Transit and High-
Speed Rail
Chap. 11 - Enviro. Regulations & Permitting
Chap. 12 - European Curve & Turnout
Mechanics
Chap 13 - Case Studies
Glossary
Committee 24-Education & Training
Chap. 3 - Basic Track
• Track Components &
Terminology
• Crossings (Highway,
Railway & Utility)
• Track Geometry
• Safety
• Maintenance Activities
• Production Gangs

Committee 24-Education & Training


Chap. 6 - Railway Track Design
• Stationing
• Horz. / Vert. Alignment
• Alignment Design
(i.e. buff & drag)
• Turnouts
• Design of Yards
• Clearances

Committee 24-Education & Training


Chap. 7 – Comm. & Signals

• Basic Track Circuits


Code System

Code Line
Office Unit
• Energy Sources
Microwave
Control
Relay
Indication
Relay
• Track Switches
Data Radio

• Highway Crossings
Signal
• Centralized Traffic
Switch
Code System
Office Unit Control (CTC)
• Defect Detectors

Committee 24-Education & Training


Chap. 8 - Railway Structures
• Bridge Types and Components
• Other Railway Structures
• Design Considerations
– Loads
– Load Combinations
• Specific Design
Considerations
– Fracture Critical
– Fatigue
– Composite Design

Committee 24-Education & Training


Chap. 13 - Case Studies

• Actual Railway Projects


• Template
– critical stakeholders
– controlling criteria
– potential problems
– learn from past mistakes
• Library of Case Studies

Committee 24-Education & Training


Digital Age

Committee 24-Education & Training


Practical Guide to Railway Engineering

WHY DID WE
DO THIS?
Committee 24-Education & Training
Railway Demographics

Committee 24-Education & Training


Common mistakes

• Turnout in a curve or through a grade crossing


• No place to install the signals
• Insufficient tangent length between reverse
curves
• On tandem leads, placing the switch stand so
that switchman must cross one ladder track to
throw the switch

Committee 24-Education & Training


Future Programs

• Speaker Program
• University Modules
• Scholarship & Student Chapter
• PGRE Training Seminar

Committee 24-Education & Training


Mentoring Program

Who mentored
you?….Pass it on!

Committee 24-Education & Training


Are YOU older than dirt?
• Log tables • Stringline a curve
• K & E Transit and reading the • Double slip turnout
vernier (w/o a magnifying glass) • Center bound tie
• Line-ups • Drainage surveys
• Anti-Creepers • 71/7 turnout (Milwaukee)
• Motor cars • Highball
• Using a hand or lock level • One and two man rip-rap
• Non self-leveling levels • Wig-wags
• “Plumb the rod” • Teamster and slip scraper
• “Chain” • Using “Allen Book” tables
• Bridge cut-offs • “Dog-nuts” or “roadmaster”
• Mud rail • Hostler
• Spot board • Hospital train
• Building a turnout from scratch • Journal brass
• Date nails • Spike killed
• Bending a stock rail • Bridge dump

Committee 24-Education & Training


Where do I get my Practical Guide?

Committee 24-Education & Training

You might also like