0% found this document useful (0 votes)
36 views

Program of Works

Uploaded by

Yedda M Ilagan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Program of Works

Uploaded by

Yedda M Ilagan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Republic of the Philippines

DEPARTMENT OF EDUCATION
EDUCATION FACILITIES DIVISION
DepEd Complex, Meralco Avenue, Pasig City
PROGRAM OF WORKS
BILL OF QUANTITIES
PROJECT:
Repair and Rehabilitation of various DepEd Central Office Buildings and Ground Improvement (Bonifacio B

OWNER: DEPARTMENT OF EDUCATION


LOCATION: DepED Complex, Meralco Avenue, Pasig City
Date:
Ap
Completion Period:
Minimum Required Man
Project Engineer
General Foreman
Mason

P
ITEM ITEM DESCRIPTION % of Total UNIT Quantity
NO.

(1) (2) (3) (4) (5)

A. General Requirements
a.1 Mobilization / Demobilization /Temporary lot 1.00
Facilities
a.2 Project Billboard each 1.00
a.3 Construction Safety and Health CD 120.00
B. Removal Works
b.1 Removal of Existing Roofing Sheets, sq.m 1,774.16
Gutter, Ridge Roll and Flashing
b.2 Removal of Existing Ceiling and Frames @ sq.m 1,815.29
5th Floor including CRs from GF-5th Flr
b.3 Removal of Existing Trench Drain l.m 98.60
b.4 Removal of Existing Tiles, Fixtures and sq.m 1,126.75
Pipes at CRs from GF-5th Flr
b.5 Removal of Existing Walls/Dry Walls @ lot 1.00
CRs
C. Hauling and Clearing Works
c.1 Clearing and Hauling of Debris (Non- lot 1.00
Usable Materials)
Hauling of salvaged material to kasipagan
c.2 area - Usable Materials (Beside DepEd lot 1.00
Complex)
D. Roofing Works
d.1 Long-span Metal Roofing sq.m 1,811.57
E. Earthworks
Earthworks (Structural Excavation,
e.1 Backfilling and Compaction, Clearing and cu.m 7.86
Grubbing)

F. Concreting Works
f.1 Concreting Works (Media Lounge) cu.m 15.21
G. Rebar Works
g.1 Rebar Works (Media Lounge) kgs 1,437.70
H. Form Works
h.1 Form Works (Media Lounge) sq.m 50.94
I. Masonry Works
i.1 Masonry Works (Media Lounge) sq.m 92.66
J. Doors and Windows
j.1 Doors and Windows (Media Lounge) lot 1.00
K. Steel Works
k.1 Truss at Media Lounge lot 1.00
L. Carpentry Works
l.1 Carpentry for Ceiling @ 5th Flr & CRs from sq.m 1,853.99
GF-5th flr, at Media Lounge
M. Electrical Works
m.1 Conduit, Boxes and Fitting lot 1.00
m.2 Wires and Wiring Devices lot 1.00
m.3 Lighting Fixture / Fixture lot 1.00
N. Plumbing and Sanitary Works
n.1 Drainage Line Works lot 1.00
n.2 Water Line Works lot 1.00
n.3 Sewer Line Works lot 1.00
n.4 Fixtures, Partitions and Accessories lot 1.00
n.5 Rain Water Collector lot 1.00
O. Auxiliary
o.1 Auxiliary at Media Lounge lot 1.00
P. Furniture
p.1 Furniture at Media Lounge lot 1.00
Q. Painting Works
Painting (Exterior Walls, Interior Ceiling &
q.1 Interior Walls of 5th Flr and CRs, at Media sq.m 8,066.88
Lounge)

q.2 Scaffolding set 848.00


R. Tile Works
r.1 Tile Works @ Cr's Floors & Walls from GF- sq.m 1,165.45
5th Flr, at Media Lounge

TOTAL CONSTRUCTION COST %


Signed by:
Name and Signature of Bidder's Authorized
Representative
Position
Name of Bidder
Date
public of the Philippines
RTMENT OF EDUCATION
ATION FACILITIES DIVISION
plex, Meralco Avenue, Pasig City
M OF WORKS
QUANTITIES

and Ground Improvement (Bonifacio Bldg - Lot 3)

Date:
Approved Budget for Contract: 24,258,103.44
Completion Period:
Minimum Required Manpower:
Project Engineer Electrician Painter Helper
General Foreman Carpenter Laborer
Mason Plumber Welder
Minimum Required Equipment:
Power Tools
Direct Cost Adjusted Unit Adjusted Total Cost
Cost
Estimated Direct Unit Direct
Cost Cost
(6) (7) (8) (9)
(6)/(5) (9)/(5)
Php