Numerical S
Numerical S
Numerical S
Component Code C01 C02 C03 C04 C05 C06 C07 C08 C09 C10
Price per unit (Rs) 110 3000 225 60 310 7000 500 1000 7000 800
Units / Year 125 40 310 720 425 525 900 90 510 600
Solution
Suitable inventory controlling technique is ABC Analysis
Cycle time
28 29 30 31 32
(mins)
Frequency 10 7 12 13 8
Solution
Cycle time = (28 x 10) + (29 x 7) + (30 x 12) + (31 x 13) + (32 x 8) /
(10 + 7 + 12 + 13 + 8)
= 1502 / 50 = 30.04
Proof
Work element number Composing Printing
reading
Frequency of performance 80 90 80
Values, or measurements, less than 63.463.4 or greater than 74.674.6 are extremely
unlikely.
These laws of probability are the foundation of the control chart.
Control charts Focus as per
our Syllabus
Sample Number 1 2 3 4 5 6 7 8 9 10
1 3 4 4 1 5 1 3 2 3 2
2 3 1 3 2 5 6 3 4 1 4
3 3 4 3 3 6 3 6 4 5 1
Observations
4 4 2 2 3 6 3 3 4 3 4
5 2 4 2 2 7 3 3 1 5 4
Solution to Ex. Problem 5.1
Quality parameters:
X bar for sample no.
1:
= (3+3+3+4+2) / 5
=3
X bar for sample no.
2:
= (4+1+4+2+4) / 5
=3
Comment: Since 5th sample is located beyond the upper control limit, the
process is out of control.
Contd…
Sample No. 1 2 3 4 5 6 7 8 9 10
R values 2 3 2 2 2 5 3 3 4 3
Comment: Since all the points are falling between upper control limit and lower
control limit, process is within control