CS-605 Software Engineering ll
Update MCQS For Mid Term
Solve By Vu Topper RM
85% To 100% Marks
For More Help Contact What’s app 03224021365
_____________ identifies the degree of uncertainty that the product
will meet its requirements and be fit for its intended use.
A. Cost risks
B. Support risks
C. Schedule risks
D. Performance risks Page 87
Once the higher management has devised the mitigate strategy, the
project must be monitored for this ----------------------.
A. Particular Requirement
B. Particular risk ok
C. Particular task
D. Particular schedule
_____________ can be uncovered after careful evaluation and analysis
whereas ____________ cannot be identified.
A. Predictable risks, Unpredictable risks Page 86
B. Unpredictable risks, Business risks
C. Predictable risks, Technical risks
D. Unpredictable risks, Predictable risks
If we plot a graph between defects reported, and defects fixed then:
A. Difference between defects reported and fixed will show the
defects yet to be fixed ok
B. This graph will show that the defect detection process is not accurate
C. We can not draw any information from that graph
D. This graph will show that some requirements are ambiguous
Certain reusable software components were to be developed by a/an ----
---- having no knowledge of its internal design standards.
A. Quality Assurance Team
B. 3rd party ok
C. 2nd party
D. In-house
For More Help Contact What’s app 03224021365
Only ----------------------- of the software components scheduled for
reuse will, in fact, be ------------- into the application. The remaining
functionality will have to be custom developed.
A. 90%, integrated
B. 80%, excluded
C. 100%, integrated
D. 70%, integrated Page 89 ok
___________ is concerned about dealing with the resultant software
and ensuring that it will be easy to correct, enhance, and adapt.
A. Support risks ok
B. Cost risks
C. Performance risks
D. Schedule risks
Formula for the Risk Exposure (RE) is given by _________.
A. RE = Probability of the risk * Cost ok
B. RE = (Probability of the risk + Cost) / 2
C. RE = Probability of the risk / Cost
RE = Probability of the risk + Cost
_____________, project risks, and technical risks are the three main
types of risks that are faced by almost every project.
A. Sales risks
B. Semantic risks
C. Business risks ok
D. Global risks
___________ tries to ask and answer questions related to Product size,
Business impact, Process definition, Staff size, experience, etc. for each
software project.
A. Risk Prevention
B. Risk item checklist ok
C. Formal reviews
D. Informal reviews
For More Help Contact What’s app 03224021365
The consequences or impact of risk will be _____________ when the
project will show Failure to meet its requirements and hence will result
in mission failure.
A. Marginal
B. Critical
C. Negligible
D. Catastrophic ok
Risk mitigation involves______________.
A. Reducing the impact of risk ok
B. Reducing the risk management plan
C. Redesigning the contingency plan
D. Performing the risk analysis again
Several entities are always created -------------- and deleted together
then this is a strong indication that they should be grouped into ----------
logical file/files.
A. Together, Double
B. Together, Single Page 48
C. Together, Multiple
D. All Together, Multiple
Software _____ relates individual software measures to provide a
normalized view.
A. Plan
B. Metric Page 65 ok
C. Attribute
D. Measure
____________ is necessary to learn from the mistakes and for the
improvement of the process continuously.
A. Risk analysis
B. Good decision
C. Improvement
For More Help Contact What’s app 03224021365
D. Postmortem analysis ok
Which of the following is not a software measure?
A. No. of function points
B. Defects per function point
C. Lines of Code
D. No. of defects
Each process defines certain deliverables known as the
_____________.
A. Items
B. Software
C. final product
D. work products Page 12
_____________________ phase in a software process focuses on
change.
A. Vision
B. Definition
C. Maintenance
D. Development
Question No:1 (Marks:1) MCQ’S Fall-2023
In context of moving range and individual control charts, LNPL stands
for:
A. Least Natural Process Line
B. Lower Natural Process Limit Page 77 ok
C. Lower Natural Process Line
D. Least Natural Process Limit
Question No:2 (Marks:1) MCQ’S Fall-2023
Risk Analysis and management involves addressing the following
concerns except
A. What thing may go wrong in future
B. What options do we have for each risk
For More Help Contact What’s app 03224021365
C. What change might cause the risk to strike
D. What can happen if the web interface of the company’s
website will change Page 84 ok
Question No:3 (Marks:1) MCQ’S Fall-2023
In context of moving range and individual control charts, UCL stands
for:
A. Upper Control Line Page 76 ok
B. Upper Control Limit
C. Universal Control Line
D. Universal Control Limit
Question No:4 (Marks:1) MCQ’S Fall-2023
"Never worrying about problems until they are occured",this statement
is related to _______ risk management philosophy.
A. Effective
B. Reactive Page 84 ok
C. Proactive
D. Productive
Question No:5 (Marks:1) MCQ’S Fall-2023
After building the Decision Tree, following formula is used to find the
expected cost for an option. Choose the correct formula:
A. Expected Cost= (path probability)i + (estimated path cost)
B. Expected Cost= ∑(path probability)i / (estimated path cost)
C. Expected Cost= ∑(path probability)i - (estimated path cost)
D. Expected Cost= ∑(path probability)i * (estimated path cost)
Page 83 ok
Question No:6 (Marks:1) MCQ’S Fall-2023
Which of the following is not related to “Software Project Planning”.
A. Resources requirements
B. Software scope estimation
C. Risk analysis and planning
D. Software configuration management Page 80 ok
For More Help Contact What’s app 03224021365
Question No:7 (Marks:1) MCQ’S Fall-2023
Which of the following is a Software Metric?
A. No. of defects
B. Lines of Code
C. No. of function points
D. Defects per function point Page 65 ok
Question No:8 (Marks:1) MCQ’S Fall-2023
Identify the TRUE statement:
A. Process metrics never vary from project to project
B. Same process metrics may vary from project to project
Page 75 ok
C. Fixed number of Process metrics are applied for every project
D. Process Metrics applied on one project can not be applied on
other
Question No:9 (Marks:1) MCQ’S Fall-2023
………………… interfaces contains data that is shared with other
programs.
A. Logical
B. User
C. External
D. Internal ok
Question No:10 (Marks:1) MCQ’S Fall-2023
FAST is a team-oriented approach to requirement gathering, the term
FAST stands for:
A. Fact Associated Special Talk
B. Field Applied Science Technique
C. Fast Application Security Technique
D. Facilitated Application Specification Techniques Page 80 ok
Question No:11 (Marks:1) MCQ’S Fall-2023
For More Help Contact What’s app 03224021365
.........technique was initially developed for manufacturing processes in
the 1920’s by Walter Shewart.
A. CMP
B. Quality
C. Control chart Page 75 ok
D. Upper Control Line
Question No:12 (Marks:1) MCQ’S Fall-2023
Which statement is correct?
A. Coupling does not depend on interdependency between
components
B. The greater the dependency between the components the lesser is
coupling
C. The lesser the dependency between the components the greater is
coupling
D. The greater the dependency between the components the
greater is coupling Google
Question No:13 (Marks:1) MCQ’S Fall-2023
_______ is the measure of how many defects are removed by the
quality assurance processes before the product is shipped for operation.
A. Bug Report
B. Removal Deficiency
C. Bug Tracking Algorithm
D. Defect removal efficiency Page 69 ok
Question No:14 (Marks:1) MCQ’S Fall-2023
_____ of a product can be measured if we can measure its non
functional properties i.e. maintainability, integrity and usability etc.
A. Size
B. Price
C. Quality Page 68 ok
D. Quantity
Question No:15 (Marks:1) MCQ’S Fall-2023
For More Help Contact What’s app 03224021365
A --------------entity is the one which have any ----------- in the problem
domain without some other entity.
A. Strong, Role
B. Weak, Function
C. All of the given
D. None of the Given Page 47 ok
Question No:16 (Marks:1) MCQ’S Fall-2023
Software Project Planning is an activity carried out by
the_______________.
A. SQA team
B. Project Manager Page 80
C. Software Developer
D. Requirements Engineers
Question No:17 (Marks:1) MCQ’S Fall-2023
_______________ is fundamental for providing mechanisms for
objective evaluation of any process or activity.
A. Metrics
B. Pointers
C. Indicators
D. Measurement Page 65 ok
Question No:18 (Marks:1) MCQ’S Fall-2023
Defects per function points is a ________
A. Metric Page 65 ok
B. Process
C. Measure
D. Quality attribute
Question No:19 (Marks:1) MCQ’S Fall-2023
In the context of statistical models, COCOMO stands for:
A. Conductive Cold Model
B. Constructive Cost Model Page 81 ok
C. Computer Company Model
For More Help Contact What’s app 03224021365
D. Commutative Conduct Model
Question No:20 (Marks:1) MCQ’S Fall-2023
We need to employ some statistical techniques and plot the results ------
---------. These are known as statistical control techniques.
A. Manually
B. Personally
C. Graphically Page 74 ok
D. Automatically
Question No:21 (Marks:1) MCQ’S Fall-2023
The extent to which a program satisfies its specifications and fulfils the
customer’s mission/objective is …………………
A. Usability
B. Integrity
C. Reliability
D. Correctness Page 67 ok
Question No:22 (Marks:1) MCQ’S Fall-2023
Effort required to test a program to ensure that it performs its intended
function __________
A. Security
B. Bug fixing
C. Testability Page 68 ok
D. Debugging
Question No:23 (Marks:1) MCQ’S Fall-2023
A _____ provides a quantitative value of some attribute of a process or
a product.
A. Plan
B. Metric
C. Measure Page 65 ok
D. Function point
Question No:24 (Marks:1) MCQ’S Fall-2023
For More Help Contact What’s app 03224021365
Hardware / Software tools, People and Reusable software components
are considered as ………………… for an Organization.
A. Resources Page 81 ok
B. Risky Factors
C. Quality Factors
D. Requirement Specifications
Question No:25 (Marks:1) MCQ’S Fall-2023
For a software the total number of requirements are equal to ________
A. Domain Requirements
B. Functional Requirements
C. Non functional Requirements
D. Functional Requirements+ Non Functional Requirements
Page 71 ok
Question No:26 (Marks:1) MCQ’S Fall-2023
Extent to which access to software or data by unauthorized persons can
be controlled, is called _______
A. Integrity Page 67 ok
B. Efficiency
C. Reliability
D. None of given
Question No:27 (Marks:1) MCQ’S Fall-2023
In case some software, it is extremely easy to operate with intuitive
interface conforming to most excellent GUI practices of the industry. It
needs very little training -----------------
A. Less than one hour Google ok
B. Less than two hour
C. Less than five hour
D. Less than ten hour
Question No:28 (Marks:1) MCQ’S Fall-2023
If the gap between the defects reported and defects fixed is decreasing,
then it means that the product is in ___________ condition.
For More Help Contact What’s app 03224021365
A. Stable Page 78 ok
B. Neutral
C. Unstable
D. Defective
Question No:29 (Marks:1) MCQ’S Fall-2023
The extent to which a program satisfies its specification and fulfills the
customer’s mission objectives is said to be achieving the
A. Usability
B. Integrity
C. Reliability
D. Correctness Page 67 ok
Question No:30 (Marks:1) MCQ’S Fall-2023
…………… files are the logical files that the customer understands and
must be maintained by the system.
A. Raw
B. Logical
C. Internal Page 42 ok
D. External
Question No:31 (Marks:1) MCQ’S Fall-2023
The extent to which a program can be reused in other applications is
called ______
A. Usability
B. Reliability
C. Reusability Page 68 ok
D. Performance
Question No:32 (Marks:1) MCQ’S Fall-2023
If the gap between the defects reported and defects fixed is increasing,
then it means that:
A. None of the above
B. The product is in stable condition.
C. The product is ready for shipment
For More Help Contact What’s app 03224021365
D. The product is in unstable condition. Page 78 ok
Question No:33 (Marks:1) MCQ’S Fall-2023
Defect removal efficiency is calculated as:
Where
E = errors found before delivery
D = errors found after delivery (typically within the first year of
operation)
A. DRE = E + D
B. DRE = E/D – E
C. DRE = E/(E+D) Page 69 ok
D. DRE = E + D/E
Question No:34 (Marks:1) MCQ’S Fall-2023
In context of "Individual control chart", if a single metrics value lies
outside UNPL, it means that:
A. Process is within control
B. Process is out of control Page 77 ok
C. The process is not mature yet
D. The process has been matured
Question No:35 (Marks:1) MCQ’S Fall-2023
Software project management primarily deals with metrics related to
productivity and__________.
A. Quality Page 65 ok
B. Efficiency
C. Reliability
D. Compatibility
Question No:36 (Marks:1) MCQ’S Fall-2023
In context of moving range and individual control charts, UNPL stands
for:
A. Upper Natural Process Line
B. Upper Natural Process Limit Page 77 ok
C. Universal Natural Process Line
For More Help Contact What’s app 03224021365
D. Universal Natural Process Limit
Question No:37 (Marks:1) MCQ’S Fall-2023
_________ give you a better insight into the state of the process or
product.
A. Errors
B. Metrics Page 66 ok
C. Threats
D. Exceptions
Question No:38 (Marks:1) MCQ’S Fall-2023
___________ help in finding the matrix to be stable or unstable
A. Cyclic chart
B. Control chart Page 75 ok
C. Directed Graph
D. Base line graph
Question No:39 (Marks:1) MCQ’S Fall-2023
The extent to which a program can be expected to perform its intended
function with required precision is called ______
A. Usability
B. Portability
C. Reliability Page 67 ok
D. Maintainability
Question No:40 (Marks:1) MCQ’S Fall-2023
Empirical models are statistical models and are based upon ...............
A. Statistical
B. Current data
C. Control data
D. Historic data Page 81 ok
Question No:41 (Marks:1) MCQ’S Fall-2023
Control charts are of the following two types:
A. Individual control charts and Stable control charts
For More Help Contact What’s app 03224021365
B. Independent control charts and Stable control charts
C. Moving range control charts and Stable control charts
Page 75 ok
D. Moving range control charts and Individual control charts
Question No:42 (Marks:1) MCQ’S Fall-2023
ILF is a --------------- identifiable group of logically control
informations ------------- the boundary of the application.
A. user, within Page 42 ok
B. user, without
C. user, beyond
D. All of the given
Question No:43 (Marks:1) MCQ’S Fall-2023
Identify the most appropriate statement:
A. The non functional requirements can be skipped.
B. The quality of the software specification is of no importance.
C. The quality of the software specification is of extreme
importance. Page 71 ok
D. The non functional requirements does not impact the quality of
product.
Question No:44 (Marks:1) MCQ’S Fall-2023
Which of the following is a software measure.
A. No. of defects
B. Defects per function point Page 65 ok
C. No. of test cases per function point
D. No. of defects per KLOC (Kilo lines of code)
Question No:45 (Marks:1) MCQ’S Fall-2023
The most common way to determine the information needed to define
project scope is to
A. conduct a preliminary meeting with the customer Page 80 ok
B. build a software prototype and show it to the customer
C. examine historical project data from similar applications
For More Help Contact What’s app 03224021365
D. perform a market analysis to determine potential customers
Question No:46 (Marks:1) MCQ’S Fall-2023
Metrics to assess the quality of the analysis models and the
corresponding software specification were proposed by ________
A. Davis in 1993 Page 71 ok
B. in 1993- 1999.
C. Ricado in 1993
D. Davis in 1990
Question No:47 (Marks:1) MCQ’S Fall-2023
The most famous of Empirical models is the COCOMO - Constructive
Cost Model – model. It also has many different versions. Which one is
the simplest of these versions ?
A. E = A + B * (ev)C
B. E = 3.2 (KLOC)1.05 Page 81 ok
C. E = (3.2/KLOC) + 1.05 + A
D. E = [LOC x 0.333/P]3 x (1/t4)
Question No:48 (Marks:1) MCQ’S Fall-2023
When more than one users interpret the same requirement in different
ways then we can say that the requirement is:
A. Complete
B. Incomplete
C. Ambiguous Google ok
D. Incorrect
Question No:49 (Marks:1) MCQ’S Fall-2023
Which of the following is not a software metric?
A. No. of errors per thousand lines of code
B. No. of defects
C. Defects per function point
D. No. of test cases per function point ok
Question No:50 (Marks:1) MCQ’S Fall-2023
For More Help Contact What’s app 03224021365
Software has very close relationship with ______________
A. Physics
B. Biology
C. Chemistry
D. Economics Page 5 ok
Question No:51 (Marks:1) MCQ’S Fall-2023
________________is the smallest unit of activity that is meaningful to
the user(s).
A. ELF
B. ILF
C. Data
D. Elementary process Page 43 ok
Question No:52 (Marks:1) MCQ’S Fall-2023
An _________________is a user identifiable group of logically related
data or control information referenced by the application.
A. ElF Page 42 ok
B. ILF
C. Item
D. Object
Question No:53 (Marks:1) MCQ’S Fall-2023
In ____________________ team organization, there is no permanent
leader rather there are task coordinators.
A. Controlled Centralized
B. Synchronous paradigm
C. Controlled Decentralized
D. Democratic Decentralized Page 32 ok
Question No:54 (Marks:1) MCQ’S Fall-2023
W5HH Principle consists of seven ___________.
A. Step
B. Point
C. Answer
For More Help Contact What’s app 03224021365
D. Question Page 35 ok
Question No:55 (Marks:1) MCQ’S Fall-2023
Mature organizations are system oriented and they
ensure_______________.
A. Consistency
B. Quality
C. Stability ok
D. Performance
Question No:56 (Marks:1) MCQ’S Fall-2023
Caper Jones is famous researcher in the field of ___________ who
made a company named Software Productivity Research
A. Biology
B. Chemistry
C. Mathematics
D. Software Engineering Page 7 ok
Question No:57 (Marks:1) MCQ’S Fall-2023
If a software developer is going to develop software for a nuclear
reactor which factor(s) will be more important?
A. Reliability
B. Performance
C. Cost effectiveness
D. both performance and reliability Page 6 ok
Question No:58 (Marks:1) MCQ’S Fall-2023
___________________lifecycle models appreciate the need for
iteration within and between phases.
A. Spiral Model
B. Object-Oriented Page 23 ok
C. Extreme Programming
D. Rapid Application Development
Question No:59 (Marks:1) MCQ’S Fall-2023
For More Help Contact What’s app 03224021365
__________________paradigm,structures a team loosely and depends
on individual initiative of the team members
A. Open
B. Closed
C. Random Page 32 ok
D. Synchronous
Question No:60 (Marks:1) MCQ’S Fall-2023
_______________ model is developed keeping in mind the element of
risk in the development of software
A. RAD
B. Spiral Page 20
C. Incremental
D. Synchronize and Stabilize
Question No:61 (Marks:1) MCQ’S Fall-2023
In Capability Maturity Model (CMM), ___________ performs
optimization.
A. Level 3
B. Level 2
C. Level 1
D. Level 5 Page 12 ok
Question No:62 (Marks:1) MCQ’S Fall-2023
The primary difference between an internal logical file and an external
interface file is that ____________is not maintained by the application
being counted.
A. RET
B. ILF
C. EIF Page 42 ok
D. DET
Question No:63 (Marks:1) MCQ’S Fall-2023
In controlled centralized structure communication between team leader
and the members is __________________.
For More Help Contact What’s app 03224021365
A. Linear
B. Vertical Page 32 ok
C. Circular
D. Horizontal
Question No:64 (Marks:1) MCQ’S Fall-2023
By default every organization is working at _______________
A. Level 3
B. Level 2
C. Level 1 Page 12 ok
D. Level 5
Question No:65 (Marks:1) MCQ’S Fall-2023
The______________ model of software development is a useful
approach when a customer cannot define requirements clearly.
A. RAD
B. Water fall
C. Prototyping Page 17 ok
D. Build and Fix
Question No:66 (Marks:1) MCQ’S Fall-2023
Vision phase in a software process focuses on __________.
A. Why Page 14 ok
B. How
C. What
D. Change
Question No:67 (Marks:1) MCQ’S Fall-2023
In ________ model user feedback is received very quickly because
product is delivered in small versions.
A. Spiral
B. Waterfall
C. Incremental Page 18 ok
D. Object oriented
For More Help Contact What’s app 03224021365
Question No:68 (Marks:1) MCQ’S Fall-2023
Capability Maturity Model (CMM) is used to judge the ___________
level of an organization
A. Maturity Page 12 ok
B. Efficiency
C. Productivity
D. Performance
Question No:69 (Marks:1) MCQ’S Fall-2023
___________________ is an Object Oriented model.
A. Spiral
B. Fountain Page 23 ok
C. Water fall
D. Incremental
Question No:70 (Marks:1) MCQ’S Fall-2023
The conceptual interface between the ‘internal’ application and the
‘external’ user world is known as-------------.
A. Control Information
B. Development count
C. Application Boundary Page 42 ok
D. Count Data Functions
Question No:71 (Marks:1) MCQ’S Fall-2023
____________ can be a reason of project failure.
A. Requirement
B. Small project size
C. Realistic deadline
D. Miscommunication Page 29 ok
Question No:72 (Marks:1) MCQ’S Fall-2023
_____________is the ability to encourage people to create and feel
creative.
A. Motivation
B. Innovation Page 30 ok
For More Help Contact What’s app 03224021365
C. Organization
D. Managerial Identity
Question No:73 (Marks:1) MCQ’S Fall-2023
In software development ____________________ is performed at the
end of each phase.
A. Validation
B. Verification Page 25 ok
C. Identification
D. Accreditation
Question No:74 (Marks:1) MCQ’S Fall-2023
MOI model of leadership was developed by __________.
A. Edison
B. Newton
C. Weinberg Page 30 ok
D. Don Carlos
Question No:75 (Marks:1) MCQ’S Fall-2023
LOC is heavily dependent on the __________.
A. No. of GUIs
B. No. of objects
C. Programming style Page 37 ok
D. No. of document pages
Question No:76 (Marks:1) MCQ’S Fall-2023
________________ model is adopted by Microsoft
A. RAD
B. Spiral
C. Build and Fix
D. Synchronize and Stabilize Page 19 ok
Question No:77 (Marks:1) MCQ’S Fall-2023
SEI stands for _________________
A. Software Electric Institute
For More Help Contact What’s app 03224021365
B. System Engineering Institute
C. Software Electronics Institute
D. Software Engineering Institute Page 168 ok
Question No:78 (Marks:1) MCQ’S Fall-2023
Requirements are sometimes fill with defects, normally known as
______________requirements.
A. Toxic requirement ok
B. System requirements
C. Functional requirements
D. Non-functional requirements
Question No:79 (Marks:1) MCQ’S Fall-2023
Reel has defined _________ steps process to improve the chances of
success.
A. 3
B. 5 Page 35 ok
C. 4
D. 9
Question No:80 (Marks:1) MCQ’S Fall-2023
A mock up application is developed in ______________ model to get
user feedback.
A. Fountain
B. Waterfall
C. object oriented
D. rapid prototype Page 17 ok
Question No:81 (Marks:1) MCQ’S Fall-2023
___________ model is very sensitive to the risk.
A. RAD
B. Spiral Page 21 ok
C. Waterfall
D. Incremental
For More Help Contact What’s app 03224021365
Question No:82 (Marks:1) MCQ’S Fall-2023
If an employee number which appears twice in an ILF/EIF , count the
DET __________.
A. Null
B. Once Page 45 ok
C. Twice
D. Thrice
Question No:83 (Marks:1) MCQ’S Fall-2023
The major activities related to software construction are :
A. installation and training
B. implementation and management
C. quality assurance, configuration and planning
D. requirement gathering, design development, coding and
testing Page 8 ok
Question No:84 (Marks:1) MCQ’S Fall-2023
MOI model of leadership stands for
A. Misunderstanding , Object, Ideas
B. Motivation , Operationalize ,Integration
C. Motivation , Organization , Innovation Page 30 ok
D. Miscommunication , Organization, Invention
Question No:85 (Marks:1) MCQ’S Fall-2023
_______________ deadline is one of the reasons of project failure.
A. Feasible
B. Realistic
C. Unrealistic Page 92 ok
D. Achievable
Question No:86 (Marks:1) MCQ’S Fall-2023
Capability Maturity Model (CMM) has __________ levels.
A. Level 3
B. Level 2
C. Level 1
For More Help Contact What’s app 03224021365
D. Level 5 Page 12 ok
Question No:87 (Marks:1) MCQ’S Fall-2023
_______________model is a haphazard type of software development
activity.
A. Water fall
B. Prototyping
C. Incremental
D. Build and Fix ok
Question No:88 (Marks:1) MCQ’S Fall-2023
Construction activities are directly related to the _____________ of the
software.
A. Installation
B. Debugging
C. Risk analysis
D. Development Page 8 ok
Question No:89 (Marks:1) MCQ’S Fall-2023
Barry Boehm has suggested a systematic approach to project
management which is known as __________
A. WHH Principle
B. W3HH Principle
C. W5HH Principle Page 35 ok
D. 5W5HH Principle
Question No:90 (Marks:1) MCQ’S Fall-2023
Software process and product quality are controlled at ________.
A. level 1
B. level 2
C. level 4 Page 12 ok
D. initial level
Question No:91 (Marks:1) MCQ’S Fall-2023
For More Help Contact What’s app 03224021365
_____________dimension of Spiral model represents the cumulative
cost to date
A. Radial Page 20 ok
B. Angular
C. Circular
D. Horizantal
Question No:92 (Marks:1) MCQ’S Fall-2023
Software Engineering is the set of __________and ___________to
develop software.
A. tools, objects
B. classes ,objects
C. processes, tools Page 4 ok
D. languages , processes
Question No:93 (Marks:1) MCQ’S Fall-2023
After passing through all the stages of the software development when
we deploy the new system at the user side that stage is called
____________.
A. Integration
B. Installation
C. status quo Page 10 ok
D. development
Question No:94 (Marks:1) MCQ’S Fall-2023
____________activity is performed throughout software production
A. Analysis
B. Development
C. Maintenance
D. Quality Assurance Page 25 ok
Question No:95 (Marks:1) MCQ’S Fall-2023
In _________________, there is both vertical and horizontal
communication.
A. Synchronous paradigm (SP)
For More Help Contact What’s app 03224021365
B. Controlled centralized (CC)
C. Controlled decentralized (CD) Page 32 ok
D. Democratic decentralized (DD)
Question No:96 (Marks:1) MCQ’S Fall-2023
Continuous process improvement is enabled by __________ feedback
from the __________.
A. logical, process
B. analytical , user
C. mathematical, user
D. qualitative , process Page 12 ok
Question No:97 (Marks:1) MCQ’S Fall-2023
The size of software can be measured by using __________.
A. No. of Items
B. No. of classes
C. No. of methods
D. Functional points Page 65 ok
Question No:98 (Marks:1) MCQ’S Fall-2023
Effective software project management focuses on the four P’s: These
are
A. People , Passion , Process , Project
B. People , Product , Process , Project Page 29 ok
C. People , Product , Process , Problem
D. People , Passion , Planning , Project
Question No:99 (Marks:1) MCQ’S Fall-2023
______________ is an object-oriented lifecycle model.
A. Spiral model
B. Waterfall model
C. Fountain model Page 23 ok
D. Extreme programming
Question No:100 (Marks:1) MCQ’S Fall-2023
For More Help Contact What’s app 03224021365
The _______________ dimension in rational unified process model
represents the dynamic aspect of the process.
A. Vertical
B. Angular
C. Regular
D. Horizontal Page 24 ok
Question No:101 (Marks:1) MCQ’S Fall-2023
The important feature of extreme programming is the concept of
__________________.
A. Feedback
B. Risk assessment
C. Pair programming Page 23 ok
D. Requirement elicitation
Question No:102 (Marks:1) MCQ’S Fall-2023
__________is the ability to encourage technical people to produce to
their best.
A. Creation
B. Innovation
C. Motivation Page 30
D. Improvement
Question No:103 (Marks:1) MCQ’S Fall-2023
A law diminishing that to continue after a certain level of performance
has been reached will result in a decline in effectiveness. This law is
known as :
A. Law of Saturation
B. Law of effectiveness
C. Law of Marketing returns
D. Law of Diminishing returns Page 6
Question No:104 (Marks:1) MCQ’S Fall-2023
In__________ a team is structured along a traditional hierarchy of
authority
For More Help Contact What’s app 03224021365
A. open paradigm
B. random paradigm
C. closed paradigm Page 32
D. synchronous paradigm
Question No:105 (Marks:1) MCQ’S Fall-2023
MTTC is the abbreviation of
A. mean time to change
B. measure time to cope
C. mean time to collaborate
D. measured time to change
Question No:106 (Marks:1) MCQ’S Fall-2023
The rapid application development model is
A. All of the given
B. Another name for component-based development.
C. A high speed adaptation of the linear sequential model
Page 19
D. A useful approach when a customer cannot define requirements
clearly
Question No:107 (Marks:1) MCQ’S Fall-2023
When a software is delivered to a client and then client reports the bug
in it then that bug is termed as
A. Error
B. Fault
C. Defect
D. Mistake
Question No:108 (Marks:1) MCQ’S Fall-2023
A redesigned business process must be prototyped before it is fully
integrated Into the business
True
False
For More Help Contact What’s app 03224021365
Question No:109 (Marks:1) MCQ’S Fall-2023
In order to measure the design quality, if the frequency of ripple defects
is too large, then it means that there is tight coupling and hence
the__________
A. none of the given
B. design has completed
C. design is maintainable
D. design is not maintainable Page 79
Question No:110 (Marks:1) MCQ’S Fall-2023
The only reason for an estimate to be unreliable is lack of experience
related to the application on the part of the estimator.
True
False
Question No:111 (Marks:1) MCQ’S Fall-2023
A consideration of software scope must include an evaluation of all
external Interfaces
True
False
Question No:112 (Marks:1) MCQ’S Fall-2023
The amount of "computing resources" required by a program to
perform its function is called …………………
A. Integrity
B. Portability
C. Efficiency Page 67 ok
D. Reliability