TATA POWER SOLAR Doc.

No: QMSG-NCR-30
SYSTEMS LIMITED
Project name:200 MW LP
NONCONFORMITY REPORT
Project, Jamkhed,
(NCR) Maharashtra

Vendor Name/ Code M/s Shree Khicha Construction PO No.

NCR No. TPS/NCR/JAMKHED/32 Department Civil Date: 05/10/2024

Details of Non-Conformance:

S.No. Drawing No. Item/Product Description Quantity


01 TPS-112-CV-210 Location-Block-05 GCS Structure Module & 20 No’s
Purlins Nut, Bolts Found Loose Condition (Structure-

Reasons for rejection (describe the NC):


1. Module erected but modules & purlins nut bolt found in loose condition large quantity.

Initiated by Name & dept.: Mr. Rishab Verma (TPSSL – Quality)

Root Cause Analysis:


• Poor supervision by contractor.
• Poor workmanship & Process violation.
• Tools unavaibility.

Correction (Action to be taken):


• Modules torque tightness at 13 N/M & purlins torque tightness at 40 N/M to be carried out to
avoid any further damage.

Risk Assessment
In present condition wind & rain are going on in site due to which modules may get damaged and
blown away if in loose condition.
Recommended for Disposal action (Tick the appropriate one):

Rework Regrade Reject & scrap Segregation Accept with Concession

BOM change Doc. change Return Containment Others- Specify__________

Closure Details: Date:

Cost calculations:

Material/testing Cost in Rs Total Quantity Total Cost (Rs)


Before Photographs:

Signature Reviewed by
Vendor Project Execution FQA QA coordinator
Mr.Rishab Verma Mr.Rishab Verma

Mr. Bhairavlal Mr.P. Athul/Divyansh


Tomar