0% found this document useful (0 votes)
190 views12 pages

Summary of Test Results - Form J

Uploaded by

suplekhp862
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
190 views12 pages

Summary of Test Results - Form J

Uploaded by

suplekhp862
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Form J

SUMMARY OF TEST RESULTS


GR/IR No. TEC 67030:2024
PROVISIONAL TEST GUIDE No. : PROVISIONAL TEST GUIDE TEC 67031:2024
Equipment name & Model No.: Lithium-ion Battery ( LP-LFP3U48100-ID)

Compliance
Inhouse/ External/ (Complied / Not
Clause Certificate/ Complied /
Requirement Remarks / Test Report Annexure No.
No. Undertaking/ Submitted/
Information Not Submitted /
Not Applicable)

Introduction Information Noted, Submitted


1.0 Undertaking Submitted

80% DOD, Normally charged at 0.5C rate in CCCV Information Noted, Submitted
1.1 mode Undertaking Submitted

The batteries in Telecom Network are used for Float Information Noted, Submitted
1.2 & Cyclic applications. Undertaking Submitted

1.3 Float & Cyclic Applications Information Noted, Submitted Undertaking Submitted
SPV Applications Information Noted, Submitted
1.4 Undertaking Submitted

2 Description Information Noted, Submitted Undertaking Submitted

Battery construction. Complied


2.1 Inhouse
Min .Cpty of Cell: 100AH ,19" Cabinet
Battery module composition: 50Ah or 75Ah or
2.2 External Lab Complied Basic cell has BIS certification
100Ah or 150 Ah or 200Ah

Container: Manufacturer provided Cell OEM test


2.3 Complied
Cell shell material : Aluminium metal /Steel/ Plastic report

The module container:


2.3.1 In house Complied Undertaking Submitted
Painted galvanized sheet
The container shall be symmetrical in shape &
2.3.2 In house Complied Undertaking Submitted
stand level on the plane surface

2.3.3 The tensile strength of the module container In house NA Undertaking Submitted

The container shall be capable of withstanding the


2.3.4 rigorous transport ,storage and handling in In house Complied Undertaking Submitted
all conditions.

Entire Clause 2.3 is applicable for Battery module


2.3.5 In house Complied Undertaking Submitted
only.

Type of container material: Manufacturer provided Cell OEM test


2.4 In house Complied
Aluminium Shell (AS) or plastic report
Cell/Module covers
2.5 Made of suitable steel / GI / Plastic material In house Complied Undertaking Submitted
compatiable with container material.
2.6 Pressure Release Valve Inhouse Complied

Terminal Posts: Undertaking with Complied Undertaking Submitted


Both +ve & -ve posts shall be clearly & Doc
2.7 unambigiously identifiable.

Battery System Configuration Inhouse Complied


2.8 Modular configuration to provide flexibility and
future expansion. Cabinet 19" (482.6mm).
Form J
SUMMARY OF TEST RESULTS
GR/IR No. TEC 67030:2024
PROVISIONAL TEST GUIDE No. : PROVISIONAL TEST GUIDE TEC 67031:2024
Equipment name & Model No.: Lithium-ion Battery ( LP-LFP3U48100-ID)

Compliance
Inhouse/ External/ (Complied / Not
Clause Certificate/ Complied /
Requirement Remarks / Test Report Annexure No.
No. Undertaking/ Submitted/
Information Not Submitted /
Not Applicable)

Rack
a. Structure is steel profile.
b. Free of sharp edges & Coreners.
c. Forced cooling from sides not permitted.
d. Front door & back door are hinged or removable type.
e. The gauge of metal sheet not less than 1.5mm.
f. The base rack of shall ensure uniform floor loading
2.9 Inhouse NA
not more than 975Kg/Sq.meter.
g. The rack bottom clearance is 110mm+-10mm
h. The top of rack shall be fully covered except for
proper ventilation & bus bar or cable entries.
i. Each air flow vent shall be covered by grill to
prevent foreign material larger than 5mm dropping in
to the rack.

Type of positive active material:


The positive plates active material Manufacturer submitted Cell OEM test
2.10 In house Complied
shall be designated as: report
For example: Lithium Iron Phosphate: LFP

Type of plates assembling:


Winding type :W
Stacking Type:S Manufacturer submitted Cell OEM test
2.11 In house Complied
All the cells /modules shall be properly sign - written report
with reference to the supplier installation
and mainatance manuals.

Designation:
Manufacturer provided Cell OEM test
2.12 The cell/module shall be designated by symbols as In house Complied
report
given in the clause 2.4,2.10 and arranged in sequence.

Sign writing & Labelling:


All the cells /modules shall be properly sign - written
2.13 Complied
with reference to the supplier installation and
mainatance manuals.

Marking: The following information shall be 1.GR No


2.14 2.Mfr.Name. & Complied Undertaking Submitted
indelibly & durably marked.
Identification
3.Model No.:
4.Sl No of the cell/
Cells: Module.
Items 4,5 & 6 may be in organic erosin resistant 5.AH cpty of
2.14.1 cell/Moduel C/5 rate. Complied
sticker with the life of the battery on the module
cover. (By advanced Permanent marking method) 6.Month & Year of
Manufacture
7.TAC No.
8.Name of user
BSNL/MTNL.
9. Battery SOC at the
time of dispatch
Form J
SUMMARY OF TEST RESULTS
GR/IR No. TEC 67030:2024
1.GR No
PROVISIONAL TEST GUIDE No. : PROVISIONAL TEST GUIDE TEC 67031:2024
2.Mfr.Name. &
Identification
Equipment name & Model No.: Lithium-ion Battery ( LP-LFP3U48100-ID)
3.Model No.:
4.Sl No of the cell/
Module. Compliance
Inhouse/
5.AH External/ (Complied / Not
cpty of
Clause Certificate/
cell/Moduel C/5 rate. Complied /
Requirement Remarks / Test Report Annexure No.
No. Undertaking/
6.Month & Year of Submitted/
Information
Manufacture Not Submitted /
7.TAC No. Not Applicable)
8.Name of user
BSNL/MTNL.
Modules: All the information may be on the module 9. Battery SOC at the
itself. time of dispatch
Items 4,5 & 9 in acid resistant sign writing with the
2.14.2 life of the battery on the module cover. Complied
Item 1,2,3,5 & 7 shall be screen printed on the
module surface. (By advanced Permanent marking
method)

Connectors:
Copper or aluminium tin or nickel coated connectors
2.15 with tin coated to withstand corrosion. (0.025mm), External Lab Complied Aluminium Connectors used
Cu - 2A/sqmm; Al - 1A/sqmm C/2 :
2A/sqmm(Minimum)

Nuts, Bolts & Washers:


Copper for -VE, Al for +VE or SS can be used. This
2.16 Inhouse Complied Undertaking Submitted
clause is not applicable for welded type of cell
interconnection.
Normative References: Information Complied
For dated references only the edition cited applies.
2.17 For undated references the latest edition of the Undertaking Submitted
document.

Functional/ Operational Requirements


3.0 Nominal cell voltage > 3.2V per cell Information Followed
Module Voltage: 12V, 24V & 48V per module
Cell Capacity: Inhouse Complied
3.1 C/5,Cpty:100% , ECV: 2.5V (25⁰C)

Module capacity:
3.2 Inhouse Complied
C/2, C/3, C/4, C/5, C/8, C/10 & C/20

In house Complied

Charging:
-Capable of recharge from 11.2/22.4/42V/Module
3.3 In house Complied
-Module design permit Charging in CCCV at
14.4/28.8/54V/module.
Form J
SUMMARY OF TEST RESULTS
GR/IR No. TEC 67030:2024
PROVISIONAL TEST GUIDE No. : PROVISIONAL TEST GUIDE TEC 67031:2024
Equipment name & Model No.: Lithium-ion Battery ( LP-LFP3U48100-ID)

Compliance
Inhouse/ External/ (Complied / Not
Clause Certificate/ Complied /
Requirement Remarks / Test Report Annexure No.
No. Undertaking/ Submitted/
Information Not Submitted /
Not Applicable)

Voltages during Discharge:


The cell /module voltage shall not be less than
3.4 In house Complied
following values,when fully charged cell/module
is put to discharge at C/5.

In house Complied

Battery discharge Tables & Graphs: CCV,


Internal Resistance & residual cpty of
module/each cell in the battery string, when it is
discharged to the end voltage of 42V/module at
3.5 In house Complied Undertaking Submitted
C/20,C/10,C/8,C/6,C/5, C/4, C/3 & C/2 rate of
dicharge. for seeking type approval certificate,
the manufacturer shall demonstrate the above
values at any two rate of discharge.

Transient Response (Coup De Fouet); Battery In house Complied


is put to load at C/3 immediately after taking it
3.6
off from the float, the voltage of any cell/module
not fall below 3V/47V, through out the battery
life.

Loss of Capacity During storage: 6Months,


35⁰C Loss not more than 20%. 95% of rated Cpty
3.7 within 2cycles. In house Complied Undertaking Submitted
100% of rated cpty within 3cycles.
Voltage difference between cells :0.05V
Ampere Hour (Ah) Efficiency : Better than
3.8 In house Complied
95%
Watt-Hour (Wh) Efficiency : Not less than
3.9 In house Complied
90%
Short Circuit : As per IEC 62619
Cell : when applied until its voltage drops to zero Mfr will submit
shall not cause fire or explosion of the cell. U/T certificate with BIS certificate has submitted along
3.10 Complied
Module:There shall be immediate protection by supporting with Undertaking
BMS and shall not cause fire or explosion of the documents
Module.
Cell Matching:
3.11 Vmax & Vmin: <0.05V In house Complied
Cmax & Cmin: <4% of their rated capacity.
Form J
SUMMARY OF TEST RESULTS
GR/IR No. TEC 67030:2024
PROVISIONAL TEST GUIDE No. : PROVISIONAL TEST GUIDE TEC 67031:2024
Equipment name & Model No.: Lithium-ion Battery ( LP-LFP3U48100-ID)

Compliance
Inhouse/ External/ (Complied / Not
Clause Certificate/ Complied /
Requirement Remarks / Test Report Annexure No.
No. Undertaking/ Submitted/
Information Not Submitted /
Not Applicable)

Internal Resistance ( I R ) Matching:


Internal Resistance of each cell/Cell module in ILAC
3.12 Complied
the battery when connected in series shall be +/- or In house
15% of average cell conductance.

Standard discharge & Charge Current (A):


3.13 In house Complied
C/2 (0.5C) at 25⁰C & humidity 65+5%RH
Module Charging Voltage (V):
For 12V, Charging voltage between 12V to
14.4V
3.14 Inhouse Complied
For 24V, Charging voltage between 24V to
29.2V
For 48V, Charging voltage between 48V to 56V
Cutt off Voltage (V):
For 12V, Cut-off voltage between 11V to 12.5V
3.15 Inhouse Complied
For 24V, Cut-off voltage between 22V to 25V
For 48V, Cut-off voltage between 42V to 47V

Environmental Requirement:
3.16 Charging: - 0°C ~ 55°C In house Complied
Discharging:- -20°C ~ 60°C

Relative Humidity :
Operation Relative Humidity
> 90 %(40°C± 2°C) Max. 95% (40°C ± 2°C) ILAC
3.18 Complied
Storage relative humidity or Inhouse
> 95% (40°C ± 2°C )

3.19 Atmospheric Pressure : 70KPa - 106KPa In house Complied

Cycle Life:
The cell/module for both float & SPV Mfr will submit
3.20 applications shall be capable of giving more than U/T certificate of Complied Undertaking Submitted
3500DOD (upto 80%) cycles at an average extended life cycle.
temperature of 25⁰C at C/5 rate.

4.0 Electrical Requirements

4.1 Uniformity of Electrical performance


Form J
SUMMARY OF TEST RESULTS
GR/IR No. TEC 67030:2024
PROVISIONAL TEST GUIDE No. : PROVISIONAL TEST GUIDE TEC 67031:2024
Equipment name & Model No.: Lithium-ion Battery ( LP-LFP3U48100-ID)

Compliance
Inhouse/ External/ (Complied / Not
Clause Certificate/ Complied /
Requirement Remarks / Test Report Annexure No.
No. Undertaking/ Submitted/
Information Not Submitted /
Not Applicable)

Charge Limitation:
The cell/module shall be capable of being
rechargedfrom the fully exhausted condition
4.2 2.5V/ Cell or 40.5V/module at specified charge In house Complied
voltage.
The cell/module design shall permt the chrging of
the battery at 3.6V/cell or 54V/module CV mode.

4.3 Discharge Performance: C/2 at 40⁰C

In house Complied

Safety Requirements : UL1642/ UL1973, or BIS, UL1642/ UL1973, or IEC


5.0 ILAC Complied
IEC 62619 62619 certificate has submitted

5.1 Electrical Safety Requirements ILAC Complied

Anti - Theft protection (Optional):


Following anti theft features:
5.2 i) BMS failed alarm Not Applicable
ii) Gyroscope based on movement
iii) GPS based on location
Form J
SUMMARY OF TEST RESULTS
GR/IR No. TEC 67030:2024
PROVISIONAL TEST GUIDE No. : PROVISIONAL TEST GUIDE TEC 67031:2024
Equipment name & Model No.: Lithium-ion Battery ( LP-LFP3U48100-ID)

Compliance
Inhouse/ External/ (Complied / Not
Clause Certificate/ Complied /
Requirement Remarks / Test Report Annexure No.
No. Undertaking/ Submitted/
Information Not Submitted /
Not Applicable)

BMS :
A BMS manages a rechargeable battery(cell or
battery pack) in its SOA, monitoring its state,
calculating, reporting, controlling & authenticated
and balancing it.
6.0 Central BMS shall be provided,which shall Information Complied
collect all the information from the individual
battery modules. either battery or CBMS
communicates to the power plant.
The CBMS shall also provide data logging of
critical parameters of all battery modules.

The battery management system is mainly


consisting of six different following components:
As per Test Case
6.0 i. Solid-state switch for disconnecting charging Complied
no.14 annexure- A
path and current limiter circuit to regulate
charging current.

ii. Solid-state switch for disconnecting


As per Test Case
6.0 discharging path that is disconnecting the battery Complied
no.14 annexure- A
discharging circuit to prevent a total discharge.
iii. The current sensor to measure the As per Test Case
6.0 Complied
charging/discharging-currents. no.14 annexure- A
iv. The BMS cell board or the central box that As per Test Case
6.0 Complied
are monitoring and balancing the single cells. no.14 annexure- A
v. The power supply for the energy supply of the As per Test Case
6.0 Complied
BMS. no.14 annexure- A
vi. 4 nos of cells temperature sensors for As per Test Case
6.0 Complied
monitoring of cell temperature. no.14 annexure- A

vii. For standalone battery bank, CBMS with


LCD display is required being not integrated with
SMPS power plant. For battery bank integrated
As per Test Case
6.0 with SMPS power plant, no separate display is Complied
no.14 annexure- A
required as SMPS controller display is available
to display critical parameters as reported in TEC
GR No. 66110:2024.

The BMS should have all the necessary


electronics and intelligence built in to it so as to
ensure that the battery performs in the most safe
& proper manner without any communications
6.0 with existing power plants as per TEC GR Information Complied Undertaking Submitted
No.66110:2024 which may be already installed at
various sites.
Form J
SUMMARY OF TEST RESULTS
GR/IR No. TEC 67030:2024
PROVISIONAL TEST GUIDE No. : PROVISIONAL TEST GUIDE TEC 67031:2024
Equipment name & Model No.: Lithium-ion Battery ( LP-LFP3U48100-ID)

Compliance
Inhouse/ External/ (Complied / Not
Clause Certificate/ Complied /
Requirement Remarks / Test Report Annexure No.
No. Undertaking/ Submitted/
Information Not Submitted /
Not Applicable)

6.1 Data Display accuaracy Followed

6.1.1 Voltage Accuaracy: Better than 0.5% In house Complied

6.1.2 Current Accuaracy: Better than 2% In house Complied

6.1.3 Capacity Accuracy : Better than 5% In house Complied

Temperature Accuaracy:
6.1.4 Temperature display accuracy shall be better In house Complied
than ± 2deg C

General Requirement:
There is no corrosively ,explosibility and
6.1.5 Information Complied Undertaking Submitted
insulation destructive gas and conductive
dust.There is no heat reassure nearby.

Monitoring Function :
6.2 In house
Verification of parameters in BMS

Voltage : Battery voltage, voltages of individual


6.2.1 cells, minimum and maximum cell voltage or In house Complied
voltage of periodic taps

Temperature : Module temperature,


6.2.2 In house Complied
temperatures of group of cells

6.2.3 Current : Current IN or OUT of the battery In house Complied

Other functions: Cell balancing, Log book


6.3 In house Complied Active Balancing
function
Computation :
6.4 Information Followed
A BMS should calculate the following.

6.4.1 Maximum charge current as a CCL In house Complied

6.4.2 Maximum discharge current as a DCL In house Complied

Energy (KWH) delivered:


6.4.3 In house Complied
Since last charge or charge cycle
Charge (AH) delivered or stored (Accumulated
6.4.4 In house Complied
delivered AH)
Total Energy Delivered since first use,
6.4.5 In house Complied
Accumulated delivered KWH

6.4.6 Total operating time since first use. In house Complied

Total no of cycles.
6.4.7 In house Complied
Charge / discharge cycle count.
Form J
SUMMARY OF TEST RESULTS
GR/IR No. TEC 67030:2024
PROVISIONAL TEST GUIDE No. : PROVISIONAL TEST GUIDE TEC 67031:2024
Equipment name & Model No.: Lithium-ion Battery ( LP-LFP3U48100-ID)

Compliance
Inhouse/ External/ (Complied / Not
Clause Certificate/ Complied /
Requirement Remarks / Test Report Annexure No.
No. Undertaking/ Submitted/
Information Not Submitted /
Not Applicable)

State of Charge (SOC) or Depth of


6.4.8 In house Complied
Discharge(DOD): indicate the charge level

6.4.9 State of Health (SOH): overall condition Inhouse Complied

Protection & Alaram: A BMS may protect its


6.5 battery by preventing it from operating outside its Information Complied
SOA such as:

Over charge Protection :


Charge circuit shall be cuttoff and alarams shall
6.5.1 In house Complied
occur. There shall be no leakage, no smoke, no
fire, no explosion

Over discharge Protection :


Charge circuit shall be cuttoff and alarams shall
6.5.2 In house Complied
occur. There shall be no leakage, no smoke, no
fire, no explosion

Short Circuit Protection:-


If battery module output is short circuit,Circuit
shall be cuttoff and alarams shall occur.
There shall be no leakage ,no smoke,no fore,no
6.5.3 In house Complied
explosion.
Operation of battery module can be recovered
manually or automatically after instantaneous
charge.

Over Load Protection :


If discharge current of battery module is beyond
the threshold of overload protection current,
6.5.4 circuits shall be cut off and alarms shall occur. In house Complied

Voltage of battery module shall be no less than


rated voltage after instantaneous charge

Temperature Protection :There shall be no


leakage, no smoke, no fire, no explosion.
6.5.5 All the protection function tests shall be In house Complied
conducted at the condition with protection
measurements.

In house
Form J
SUMMARY OF TEST RESULTS
GR/IR No. TEC 67030:2024
PROVISIONAL TEST GUIDE No. : PROVISIONAL TEST GUIDE TEC 67031:2024
Equipment name & Model No.: Lithium-ion Battery ( LP-LFP3U48100-ID)

Compliance
Inhouse/ External/ (Complied / Not
Clause Certificate/ Complied /
Requirement Remarks / Test Report Annexure No.
No. Undertaking/ Submitted/
Information Not Submitted /
Not Applicable)

Alarms avaialable as per TEC GR


6.5.6 No.66110:2024 on display and on communication In house Complied
port

Communication ports:
The manufacturer shall provide Modbus RS485
port for connectivity with SMPS power plant and
shall also provide any other additional
communication port(s) such as RS232, Ethernet
6.6 In house Complied
or USB, CAN, wireless communications etc., as
per the requirement of the purchaser. In case of
no specific requirement, the manufacturer shall
provide at least one communication port out of
the above-stated ports.

LED/LCD provide Power, Activity, and Fault


6.7 In house Complied
status

Battery connection to load circuit:


A BMS may also feature a pre-charged system
allowing a safe way to connect the battery to
6.8 different loads and eliminating the excessive In house Complied
inrush currents to load capacitors. The connection
to loads is normally controlled through Solid-
state switches.

Optimization:
In order to maximize the battery's capacity, and to
prevent localized undercharging or over-charging,
6.9 the BMS may actively ensure that all the cells In house Complied Complied with active balancing,
that compose the battery are kept at the same
voltage or State of Charge, through
active or passive balancing.

7.0 Quality Requirement Information

7.1 Battery Manufacturing: ISO 9001:2015 Complied

Quality of material & Workmanship: All the


7.2 material and workmanship shall be of In house Complied Undertaking Submitted
professional grade and highest quality.

Quality Assurance Tests: Module/Batteries


supplied against specific order after Type
7.3 Approval shall be inspected and tested to ensure In house Complied Undertaking Submitted
that the requirements of this document have been
met.
Form J
SUMMARY OF TEST RESULTS
GR/IR No. TEC 67030:2024
PROVISIONAL TEST GUIDE No. : PROVISIONAL TEST GUIDE TEC 67031:2024
Equipment name & Model No.: Lithium-ion Battery ( LP-LFP3U48100-ID)

Compliance
Inhouse/ External/ (Complied / Not
Clause Certificate/ Complied /
Requirement Remarks / Test Report Annexure No.
No. Undertaking/ Submitted/
Information Not Submitted /
Not Applicable)

Valid BIS certificate is required for the basic cell


and its model to use in battery module for getting
TAC for initial module only. In case of any
7.4 change in design of basic cell and / or renewal / Complied Undertaking Submitted
reissue of BIS certificate, fresh valid BIS
certificate is required to be submitted by OEM /
Manufacturer while getting TAC.

Cell manufacturer shall mention all the technical


data sheets of the basic cell along with the life
cycle for getting TAC for initial module only. In
7.5 Complied Undertaking Submitted
case of any change in design of basic cell, fresh
such technical data sheets shall be furnished by
OEM / Manufacturer while getting TAC.

TAC for higher capacity can be obtained for a


7.6 particular capacity by performing the incremental Complied
tests as per applicable clauses of this document.

8.0 Various Requirements of Product Information


8.1 Field Trial Field Trial Complied Undertaking Submitted
8.2 Operational Requirement Information
8.2.1 Ambient Conditions : QM 333 External Lab Complied Undertaking Submitted

Complied with Naural Cooling at


8.2.2 Cooling Arrangments Physical check Complied
Module level

Fire Retardent:
The material used in composition of the
External Lab or
8.2.3 cell/module/battery shall be fire retardant and Complied Undertaking Submitted
U/T
shall have a minimum oxygen index of 28% &
shall comply UL-94 V-0 for this purpose.

8.2.4 Electro static Discharge 8KV External Lab Complied

Thermal Runaway: The cell/module /battery


shall not exhibitthermal runway while working in
8.2.5 In house Complied
the Indian environment conditions.( Avg. wkg
Temp.:35⁰C) & at a charge rate of C/2

Battery Reliability: In case of failure of one or


two cell in the module shall not cause the failure
8.2.6 In house Complied
of the module and shall be able to provide
uninterrupted rated power to the load.

8.3 Disposal of unserviceable batteries: Information


Form J
SUMMARY OF TEST RESULTS
GR/IR No. TEC 67030:2024
PROVISIONAL TEST GUIDE No. : PROVISIONAL TEST GUIDE TEC 67031:2024
Equipment name & Model No.: Lithium-ion Battery ( LP-LFP3U48100-ID)

Compliance
Inhouse/ External/ (Complied / Not
Clause Certificate/ Complied /
Requirement Remarks / Test Report Annexure No.
No. Undertaking/ Submitted/
Information Not Submitted /
Not Applicable)

Lithium batteries are disposed of after their


use (unserviceable). The manufacturer
shall take necessary action for safe disposal
8.3.1 of unserviceable lithium ion batteries and till any Ensure it Complied Undertaking Submitted
guidelines release by ministry of
environment and forest under
environment (protection) act 1986.

8.3.2 ISO 14001 (Latest issue) Valid certificate Complied Submitted valid certificate

Date:

Place: Signature & Name of the testig Officer

* Signature Applicant / Authorized Signatory

* Section J as given above is also to be submitted by the applicant . Authorized signatory as part of In-house test results alsong with
Form - A. the Authorized signatory shall be as same as the one for Form 'A'

You might also like