0% found this document useful (0 votes)
41 views2 pages

Modification of Loco in DLSJ

modification

Uploaded by

lokesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views2 pages

Modification of Loco in DLSJ

modification

Uploaded by

lokesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Modification of Diesel AC WAG-7 loco motives.

MODIFICATION NO.OF No. of loco LIST OF MATERIAL


S.NO MODIFICATION TO BE CARRIED LOCO not Section remark REQUIRED STATUS OF MATERIAL AVAILABILITY PDC
OUT COVERED covered (MATERIAL CONTROL)
Shunting mode for AAL make ESMON under codal life (4 out
SPM & stock- 687 Mtrs showing on
1 MS-492 SHUNTING MODE 55 32 32 Loco Covered of 12), 08 out of 12 AAL make esmon over codal life. -
HSR/T&C IMMIs

https://drive.google.com/fil Material procurement under process


(5 mm thickness base plate for fixing foot switches in
02 loco (28658,28569) e/d/1a57Qn0_qnAcV6dJhZp
2 MS-487 TMDDS 55 2 T/M bogie) -
covered in POH yFmZID429rF6u6/view?usp
PO-62235212100011, dated; 18.01.2024, DD- 17.04.24
=sharing
DD Expired

Modification kit for


provision of Bellow
(Nitrile Rubber) at the
3 27 13 14 TR 13 Loco Covered nitrile bellow A new tender is being processed. -
entry of botton insulator
of VCB (Type 22CB) of
M/s SEIL

Implementation of SLAM
in loco shed homing
4 WORKING DMIC Completed - Completed Completed
Electric locomotives 09-
08-2023

MPCS- Software Display


5 16 16 0 TR Completed - Completed Completed
modification in V3
Conversion of stesalit
6 MPCS to V3 as on 05-10- 4 4 0 TR Completed - Completed Completed
2023
Provision of Hammer in
7 55 41 FAB Hammer fitted in 41 locos
locos
03 HRPT are under warranty
8 HRPT position 55 43 Panto claim due to Pneumatic pipe HRPT 1 HRPT avl at shop floor. All required items received
broken

PRV MODIFICATIONof
9 High Reach Pantograph 4 4 Panto completed - completed completed
type LX3600 of Faiveley

The software provided by the firm at JHSD is malfunctioning.


Implementation of bilingual
Medha- Implementation so, after the updation of the software, this modification will
display completed in 06 nos
of bilingual display of be carried out.
Medha make V-3 MPCS. A
10 fault message in Medha 12 6 6 TR Online software
directive from RDSO awaited
make MPCS V3 dt 30-10- Implementation of bilingual display completed in 08 nos
for further modification in
2023 Medha make V-3 MPCS. Directive from RDSO awaited for
balance locos.
further modification in balance locos.
RTIS PS Modification (MS-
11 11 11 0 TR COMPLETED - - Completed
0497)
To be done by the home
shed. Material yet not received. 4 Nos technical suitability given
12 LED headlight on locos 45 2 43 TR loco covered as loco arrived - and P.O awaited. Rest quantity will be procured through RSP
in the shed. 2023-24

Loco sent to AC Shed for


MS-498 MPCS recording
13 16 0 inclusion of Loco under ELS
of flasher light operation
proposal F/L modification
HRPT position-80 mm PO has not been issued till now.The Tender has been opened
14 37 0 37 Panto
Block moodification after technical suitability. FIle was sent SrDMM/NCR.
programming work will be
carried out during minor
Flasher light event done by the firm and wiring software mod. done free of cost by the firm in AMC &
15 15 0 15 TR schedule by the firm and
recorder modification. will be done by the warranty loco.
Running section.
homeshed.
DC-OC modification in
16 11 11 0 TR COMPLETED - - COMPLETED
AAL make SIV
In progress. loco will be
Fire prevention DRIVE
17 45 40 5 TR covered on arrival in the - - -
QLM
03rd locoshed.
on hand under
CPA 31 in M/s MEDHA modification in loco no.
18 4 2 2 TR material available - -
SIV modification 28720

fitment of CKD make air CKD PRV demand is under


19 17 0 17 TR - -
PRV in AAL make VCB procurement.
provision of CKD make air
pressure regulator with
20 27 2 25 TR modification under process available - -
external gauge in
Schneider make VCBs

21 Grounding of RTIS 11 11 0 TR COMPLETED - - Completed

VCB RC damping
22 45 45 0 TR COMPLETED - - Completed
panelheight modification

MS to SS modification in
23 45 45 0 TR COMPLETED - - Completed
SL-30

24 MLR to MSR conversion 45 42 3 TR under process material available. - December 2024

Material not provided by the


gauge modification in safety moulded cover Material not provided by the firm by the GANPAT enterprises (waiting for
25 17 3 14 TR firm by the GANPAT
AAL make VCBs (waiting for material) Kolkata. material)
enterprises Kolkata.