BUILDING PERMIT

A Building Permit is a document issued by the Building Official to an


owner/applicant to proceed with the construction, installation, addition,
alteration, renovation, conversion, repair, moving, demolition or other
work activity of a specific project/building/structure or portions thereof,
upon the approval of the accompanying principal plans, specifications
and other pertinent documents with the duly notarized application, which
will be found satisfactory and substantially conforming with the National
Building Code of the Philippines and its Implementing Rules and
Regulations. (PD 1096)

Under Chapter 3, Sec. 301 of PD 1096, No person, firm or corporation,


including any agency of the government is allowed to construct, alter,
repair, convert, use, occupy, move, demolish and add any
building/structure or any portion thereof or cause the same to be done,
without first obtaining a building permit from the Building Official assigned
in the place where the subject building/structure is located or to be
erected.

The permit shall expire and becomes null and void if the building or work
authorized therein is not commenced within a period of 1 year from the
date of such permit, or if the building or work so authorized is suspended
or abandoned at any time after it has been commenced, for a period of
120 days.

REQUIREMENTS FOR BUILDING PERMIT

1. Barangay Clearance/Certification, Association Certificate, Consent


of owner, SPA.
� Transfer Certificate of Title, Tax Declaration, Deed of Absolute Sale,
Waiver of Rights, Contract of Lot Award, DENR Tagging Entry Pass/Stub.
� Contract/Agreement (should include contract price) with general
contr4actor.
� Contract/Agreement (should include contract price) with sub-
contractors for Electrical, Mechanical, Sanitary/Plumbing, Elevators, And
all other services required by the developer.
� Fully accomplished application forms:
� Building
� Sanitary/Plumbing
� Electrical
� Mechanical
� Fencing
� 5 Sets Of Building Plans And Specification
� Location Plan, Site Development plan, Vicinity Map
� Architectural Plans
� Structural Plans
� Sanitary/Plumbing
� Electrical Plans
� Mechanical Plans/Fire Protection Plan (ifApplicable)
� 3 Sets Of
� Structural Design and Computations
� Bill of Materials/Cost Estimates
� Specification
� 3 Large envelope w/ Folder, Faster And (1) Logbook
� Others
� Fire Safety Certificate Checklist
� Location Clearance
� Air Transport Office Clearance
� DENR Environmental Compliance Certificate
� LLDA - Laguna Lake Development Certificate
Note:
1. All Application Forms, plans, specification, design and
computation, bill of materials should be sign and sealed by duly licensed
CE, ARCH, SE, PEE, Master plumber, master Electrician.
2. In case of large-scale Development subdivision, secure
Development permit form Saguniang Bayan.
3. Photo copy of PRC ID and PTR.

-----------------------------------------------------------------

*Reference:

- http://www.jecoconstruction.net/Building_Permits.html
(Jeco Construction Site - PH)