Struct 701A Single Classroom & Admin-FOUNDATION
Struct 701A Single Classroom & Admin-FOUNDATION
100
85
35
stone to detail
670 3750 3750 3750 3750 3750 3750 670 150 mm thick 2MPa
Ground level
hollow block work walls
900mm min
150
A
filled with C15/20 MC compacted fill Well compacted
970 with brick force wire on
every course ground
1 kerb edge All external substructure
1 600x600x50mm thick class
1 walls to be rendered 15mm
150
200
sand-cement plaster on out-
kerb edge
2400
mass concrete strip
staggered pattern on 60mm footing approved bituminastic paint
sand bend on 150mm well SECTION 1 - 1
comacted laterite kerb edge kerb edge 1 kerb edge SCALE 1:60
2 2 140
180x91x18.8kg/m 180x91x18.8kg/m
(180 IPE) UB Column 280x200 RC (180 IPE) UB Column A98 mesh in floor slab
280x200 RC -0.085
2470
2470
-0.085 Stub Column at 25mm from top 140 mm thick SSB walls
kerb edge
Stub Column
100
200 1000 -0.085
35
280
600
600
150
150
1000
1000
3 3
150
Laterite compacted compacted fill
600 1 150 1 to 90% MOD AASHTO.
1000
1115 150 mm thick 2MPa 200x600dp C15/20 mass
0.000 hollow block work walls concrete strip footing
200
600 1115 2 2 150
0.000 filled with C15/20 MC
4125
4125
600
0.000 150 with brick force wire on
0.000
every course
15590
15590
-0.085 2 2 SECTION 2 - 2
100mm thick RC slab reinforced 600
SCALE 1:60
with A98 wire mesh 25mm from 180x91x18.8kg/m
150
600
2 1000
top cast on 250 Micron DPM on (180 IPE) UB
4 35mm sand blinding on 150mm -0.085 4 Column
2 150 200
thick well compacted laterite to
1415
150
90% MOD AASHTO.
140
500
150
600
0.000 2
150
1000
280
180x91x18.8kg/m 180x91x18.8kg/m 600
4125
4125
600
0.000 2 280x200 RC
500
140
(180 IPE) UB Column (180 IPE) UB Column
2 2 2 2 0.000 100 Stub Coumn
280x200 RC 0.000 150
280x200 RC 100
Stub Column Stub Column 500 500
1000
280
280
600
150
1
600
150
1
1000x1000x300dp BASE, 280x200 RC STUB COLUMN
1000
kerb edge
600x600x50mm thick class C20/20
2470
2470
mass concrete pavers laid to architect's M12 holding down bolts
-0.085
-0.085 specified staggered pattern on 60mm with at least 75mm thread
-0.085 projection. Threads preserved
sand bend on 150mm well comacted laterite
600
75
in grease.
6 kerb edge kerb edge 1 kerb edge
6
1 5Y12-01-250 B1
300
kerb edge
A
1000
stub R8-06
4Y12-05
670 3750 3750 3750 3750 3750 3750 670 5Y12-02-250 B2
7R8-06 05 05
23840
05 05
300
SECTION: stub
A B C D E F G H I 1000
02 02 02 02 02
FOUNDATION PLAN 1000x1000x300dp RC BASE - 12No. BASE SECTION
SCALE 1:100