1. What are 3 commonly used cost estimation approaches used in software project?
2. Explain the term: Functional point
3. Give any two reasons of software project failure.
4. Define the term : Risk
5. What is software quality assurance
6. Enlist four P’s of management spectrum
7. Enlist different scheduling techniques
8. Enlist different types of risk.
9. Full form of COCOMO model.
10. Define and explain Black box and White box testing.
11. Explain work breakdown structure.
12. Explain the term: Risk Prioritization
(4 marks)
1. Difference between Black box and White box testing?
2. Explain unit testing in detail.
3. Explain test documentation.
4. Explain test summary report and also represent test summary report with IEEE format (template)
5. Explain the test plan in detail.
6. Explain defect report with proper template.
7. Define management spectrum & enlist the characteristics of software.
8. Explain the following management spectrum:
a. People
b. Product
c. Process
d. Project
9. Study of requirement specification for XYZ project has produced the following result: Need for 10
inputs, 20 outputs, 15 inquires, 20 files and 5 external interfaces. Input an external interface into this function
point attribute as average complexity and all other function point attribute are of complex complexity .
Determine adjusted function point, assuming complexity adjustment value is 40.
10. Explain Empirical and Heuristic estimation.
11. Explain COCOMO model in detail.
12. Explain COCOMOII model in detail.
13. Consider a software project using organic mode with 4 KLOC obtain its efforts ,duration and person
estimation using basic COCOMO model.
14. Consider a project having 5 KLOC which is an embedded software with critical area hence the size of
application database is high. So find out its effort, duration and person estimation using immediate model.
15. Consider a project having 3 KLOC which is an organic software whose IT(Integrate and test) is nominal,
find out its effort, duration and person estimation using detailed COCOMO model.
16. Explain Risk Management and also explain two characteristics of risk and also specify different types of
risk.
17. Explain RMMM in detail.
18. Explain project scheduling and also maintain basic principles of project scheduling.
19. Explain CPM and PERT in detail.
20. How to draw TimeLine Chart & explain with simple example.
21. Explain Quality management.
22. Difference between Quality Assurance and Quality Control.
23. Explain 6 Sigma in detail.
24. Explain ISO9000 in detail.
25. Explain CMMI in detail.
26. Explain DevOps in detail.
27. Explain software security in detail.
28. Define Phases of Quality Assurance.
29. Explain earn, value and analysis.
30.For a software project different activities and their duration are listed as below Draw the activity network
and find the critical path.
Task T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 T11 T12
Duration 8 15 15 10 10 5 20 25 15 15 7 10
Dependence - - T1 - T2,T4 T1,T2 T3 T4 T3,T6 T5,T7 T9 T11