0% found this document useful (0 votes)
253 views1 page

Operating Instructions CC+8+2t

Operation instruction

Uploaded by

HARSH TECZ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
253 views1 page

Operating Instructions CC+8+2t

Operation instruction

Uploaded by

HARSH TECZ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

भारतसरकार (GOVERNMENT OF INDIA)

रे लमंत्रालय (MINISTRY OF RAILWAYS)


रे लवेबोर्ड (RAILWAY BOARD)

No.2022/CE-II/TS/22.9t/ROPI New Delhi Dated: 14.04.2022

General Managers,
All Zonal Railways

Sub: Operation of CC+8+2t/CC+6+2t trains.


Ref: i) Board’s letter no. 2007/CE-II/TS/8 dated 02.04.2009
ii) Board’s letter no. 2016/CE-II/TS/2(CC+8+2) dated 24.08.2018

Vide Board’s letter under reference (i) above, instructions for operation of
CC+8+2/CC+6+2 trains were issued. Certain modifications to Para 3.2.2.2 of above letter for
procedure to be followed for dealing with wagons overloaded beyond PCC+loading tolerance,
were issued vide reference (ii) above.
In order to overcome the crisis of supply of coal to power sector and mandate of
Railways to supply 415 rakes of domestic coal and another 25 rakes of imported coal, a high
level review was undertaken in Board on date 13.04.2022 and it has been decided to modify
the limits stipulated in Para 3.2.2.2 of above letter dated 24.08.2018, as below:

Case Gross weight of nominated wagons of trains for Action required to be taken
CC+8+2 CC+6+2 CC+4+2 by Railway
1 More than 92.6t More than 90.60t More than 88.28t To run at normal speed
but less than or but less than or but less than or subject to sectional speed
equal to 93.1t equal to 91.60t equal to 89.28t restrictions, in force, if any.
2 More than 93.1t More than 91.60t More than 89.28t Get the loaded
but less than or but less than or but less than or adjusted/unloaded or excess
equal to 94.6t equal to 92.60t equal to 90.28t load wagon detached or run
the rake at a restricted speed
not exceeding 50 kmph
3 More than 94.6t More than 92.60t More than 90.28t Get the loaded
adjusted/unloaded or excess
load wagon detached or run
the rake at a restricted speed
not exceeding 30 kmph

Above modification is applicable to coal rakes only and shall remain in force upto 31 st
May 2022.

PRADEEP Digitally signed by


PRADEEP NAGAR

NAGAR Date: 2022.04.14


12:52:16 +05'30'

(Pradeep Nagar)
Director Civil Engg.(Planning)
Railway Board