(J1) PTW - Electrical Work - Rev04

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Step 4 PTW Coordinator

ELECTRICAL WORK Permit No:


( All LV and HV Electrical Equipment Date:
& Others)
Signature:
Step 1 By Permit Holder / Diisi oleh permit holder Site Description /deskripsi
M/S No.: CONTRACTOR NAME/ Nama Kontraktor:
OTHER RELATED PERMIT NO: TYPE OF WORK:
WORK LOCATION: Commissioning area: YES NO
PLANNED START DATE (1 Day):
DESCRIPTION OF THE WORK TO BE PERFORMED:
TYPE OF EQUIPMENT TO BE USED:
SUPERVISOR IN-CHARGE: DATE:

CONTACT NUMBER: SIGNATURE:


Electrical Work Permit is required for any operation involving electrical work that can cause electrocution, fire or other incidents.
Must be posted at the site.
This permit is not valid unless all appropriate fields are completed
REQUIRED PERSONAL PROTECTIVE EQUIPMENT (PPE) APD yang dibutuhkan No additional PPE
Safety glasses, hardhat, safety boots, gloves, traffic vest and long sleeves always required. Bukan tambahan APD
Face shield/ Pelindung muka Insulating/ Rubber gloves Flame resistance clothing

Hearing protection/ Pelindung telinga Safety harness/ Pelindung jatuh Arc flashes protective equipment
Alat pelindung dari sinar arc
Other/Lain-lain :

PRECAUTIONS CHECKLIST
Lock-Out and Tag-Out (LOTO) System is implemented (if required). Correct voltage is used for connections.
The area of work has been inspected and found free from Work area is free from flammable liquids or water.
electrical fire hazard. Suitable fire extinguishers are available in the work area.
ELCBs, Grommets and industrial sockets are use in all DPs. Suitable PPE (including high voltage gloves) are provided and
Earthing arrangements are ensured. worn as required.
Suitable safety signs are provided and installed.

I confirm that all the items defined above have been completely examined and found in compliance with HSE requirements, and that the relevant
employees are trained/competent enough for safe execution of the work .
Sub-Contractor’s Electrical Supervisor: Date:

Step 2 Review and Approve / Memeriksa dan menyetujui

Approved By/ Disetujui oleh Name/ Nama Signature/ Tandatangan Date/ Tanggal
Site Manager / Construction Manager

Step 3 Re-evaluated at worksite / Dievaluasi di area kerja

Evaluated by Name Signature Date


Sub-con. Site Manager or Delegate
SPV / Inspector Person in charge at Area
EHS Person in charge at Area

Step 4 Permit Close/ Penutupan Permit

The Permit is to be signed off 30 minutes prior to the end of the shift at the last valid day of this permit and reported to permit coordinator.
Permit akan ditandatangani 30 menit sebelum berakhirnya shift dan diakhir masa berlaku permit serta laporkan ke Permit Kordinator.
Job Complete/Pekerjaan selesai Job Incomplete/ Pekerjaan belum selesai
I have checked the workplace and declaring that I withdraw all my workforces from the area and it is safe.
Saya telah memeriksa area kerja dan menyatakan bahwa saya telah menarik semua pekerja saya dari dari lokasi kerja dan aman
Permit holder Name and Signature/ Date/
Pemegang Permit dan tandatangan: Tanggal:

PTW form rev#4