Cost Estimation: 5 Year Architecture
Cost Estimation: 5 Year Architecture
1-FEET = 12 INCHES
1-MARLA = 225 SFT (LAHORE), may vary in other cities
1-KANAL = 20 MARLAS (LAHORE)
1-ACRE = 8 KANAL (LAHORE)
MILLIMETRE = (MM)
CENTIMETRE = (CM)
METRE = (M)
KILOMETRE = (KM)
UNITS AND ABBREVIATIONS
WINDOW BLINDS
CIELING
FLOOR AREA
UNITS AND ABBREVIATIONS
SFT (SQUARE FEET )
SQ M (SQUARE METER)
GRANITE
STONE
K G (KILOGRAM)/TONNE
STEEL BARS, STEEL SHEET,
CEMENT (IN PURCHASING), GIRDER,
STEEL BAR
METAL TUBES
UNITS AND ABBREVIATIONS
GALLON, LITRE
COATINGS, WATER, PAINT, OIL,
ANTI TERMITE CHEMICAL ,
PAINT
ANTITERMITE CHEMICAL
UNITS AND ABBREVIATIONS
RAILING PIPES
UNITS AND ABBREVIATIONS
CENTIGRADE
TEMPERATURE
Because no site
construction is
allowed to happened
(in concrete pouring)
at +40 C and -4/-14 C
of temperation
UNITS AND ABBREVIATIONS
WATT
ELECTICITY
LUX
ILLUMINATION
UNITS AND ABBREVIATIONS
Ar. (ARCHITECT)
LEED (Leadership in Energy & Environmental Design)
LEED AP (Accredited Professional)
ENG. (Engineer)
Q S (Quantity Surveyor)
TSS (Time Saver Standards )
P C A T P (Pakistan Council Of Architects And Town Planners)
I A P (Institute Of Architects of Pakistan)
PIID (Pakistan Institute Of Interior Designers)
PEC (Pakistan Engineering Council)
UNITS AND ABBREVIATIONS
ROAD LEVEL
UNITS AND ABBREVIATIONS
PL (Porch Level)
PL (Plinth Level)
FFL (Finish Floor Level)
PCC (Plain Cement Concrete)
PORCH LEVEL
P C C F F LEVEL
UNITS AND ABBREVIATIONS
RCC
(Reinforced Cement Concrete),
RBC
(Reinforced Brick Concrete ),
DPC
(Damp Proof Course), R C C
D P C R B C
UNITS AND ABBREVIATIONS
U G W TANK
UNITS AND ABBREVIATIONS
S S (STAINLESS STEEL)
M S (MILD STEEL)
S . S . (STAINLESS STEEL)
GI (Galvanized Iron )
CI (Cast Iron)
PVC (Polyvinyl chloride)
PPR (Polypropylene Random) GI
CP (Chromium Plated)
QTY (Quantities)
BOQ (Bill Of Quantities)
PPRC
UNITS AND ABBREVIATIONS
PPR (Polypropylene Random)
CP (Chromium Plated)
QTY (Quantities)
CP
BT FT DB
1. Project Information
FOLLOWINGS ARE IMPORTANT FACTORS/REQUIREMENTS TO
BE CONSIDERED FOR COST ESTIMATION OF ANY PROJECT
▪ MATERIAL (Availability/Carriage/Quality)
▪ LABOUR (Availability/Wages)
▪ PROJECT COMPLETION TIME
▪ LOCATION
▪ CLIMATE
▪ OVERHEADS
▪ PROFIT
▪ ANALYSIS (Analysis of material/labour of each scope of work)
6. BOQ