GOVERNMENT OF TELANGANA

MISSION BHAGIRATHA DEPARTMENT,


OFFICE OF THE SUPERINTENDING ENGINEER, MISSION BHAGIRATHA
CIRCLE, ADILABAD

Dated:11,11,2024
Memo No:AEE3/DEE/SRSP-ADB/Phase-I/DLP Extension/2024,
segment-"construction of Intake well,
Sub: MB Circle, Adilabad- SRSP-Adilabad
Adilabad segment, Kaddam segment,
WTP, Raw water pumping main in Telangana Drinking water
Asifabad segment and Mancherial segment under
supply project(TDWSP)" - submit the status of Defects to be attended by the
closure of DLP- Rea.
agency MEIL, Hyderabad for declaration of
Department.
Ref: 1. Go.Rt.No.82, Dt:07.02.2015 of PR&RD(RWS-IV) Superintending Engineer,
2. Agreement No.01/2015-16, Dt:09.04.2015 of the
RWS&S, Adilabad.
Works/2022-23, Dt:
3. T/o.Procs.No.AEE3/DEE/Phase-I/SRSP-ADB/DLP/Civil
11.10.2022.
Dt:18.05.2024 of the
4. Lr.No.AEE1/MB Grid Nirmal/Phase-I works/0&M/2024,
Executive Engineer, MB Grid Division, Nirmal.
Dt:21.05.2024
5. T/o Lr. No.AEE3/DEE-II/SE/MB(Adilabad)/WTP/0&M/2023-24,
****
"Construction
Vide reference 2nd cited above, the agreement concluded for the work
segment,
of Intake well, WTP, Raw water pumping main in Adilabad segment, Kaddam water supply
Asifabad segment and Mancherial segment under Telangana Drinking
Crs(SRSP-Adilabad
project(TDWSP)" with an estimate cost of Rs.248.00 Crs/Rs.445.50
Infrastructures
estimate cost/Total estimate cost) to the agency M/s.Megha Engineering &
Limited, S-2, Technocrat Industrial Estate, Balanagar, Hyderabad-500037.
As per the reference 3r cited, the defect liability period for the work mentioned in
reference 4n cited
the aforesaid subject was supp0sed to be completed on 08.02.2023. Vide
the Executive Engineer, MB Grid Division, Nirmal reported that, despite repeated
instructions from the department, the agency not attended the defects reported by Advisory
extended
team. Subsequently, through the reference 5n cited, DLP for the above work was
up to 30.11.2024 due to not attending of defects identified by Advisory team and
department officials.
Hence, the Executive Engineer, MB Grid Division, Nirmal is hereby instructed to
submit the report on whether the agency attended all the defects identified by AdvisSory
team and the department officials in the aforesaid work or to extend the DLP as per the
terms and conditions of the contract.

The information should reach to this office within a week, as to initiate further action
at our level.

To Superintending Engineér,
MB Circle,
The Executive Engineer, MB Grid Division, Nirmal. Adilabag
Copy submittedtothe Chief Engineer-V, MB Hyderabad for favour of information.