PP-EWM Integration
PP-EWM Integration
ROHELA KHAN
SAP EWM SOLUTION ARCHITECT, TRAINER,
MENTOR, STORY TELLER AND BLOGGER.
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
There are 3 types of manufacturing process followed in SAP Production Planning:
1) Discrete Industry
2) Process Industry
3)Repetitive Industry
Discrete Industry Manufacturing Process
Discrete manufacturing forms an industry type where in the products which are manufactured can be
easily assembled and dis-assembled. They can be reworked upon easily to a large extent. You can say
making pumps, engines, cars, airplanes.
Industry Type: Mechanical engineering, Consumer goods, electronics, and many more
Process Industry Manufacturing Process
The component Production Planning for Process Industries (PP-PI) provides an integrated planning
tool for batch-oriented process manufacturing. It is primarily designed for the chemical,
pharmaceutical, food and beverage industries as well as the batch-oriented electronics industry.
Industry Type: Chemical, Pharma, Poultry, Dairy and many more.
Repetitive manufacturing Process
Company manufactures product in large numbers and production is quantity based and period based
not order based. You can use repetitive manufacturing as either make-to-stock REM or make-to-order
REM such as in the automotive industry.
Repetitive manufacturing form an industry type where in the products manufactured can be discrete
manufactured or process industry type, produced repetitively or continuously in production lines. This
forms the continuous production scenario.
Industry Type: Mechanical engineering, Consumer goods, electronics, and many more
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
In the below document we are going to explain how the SAP Production Planning integrates with SAP
EWM Advanced Production Integration in SAP S/4 HANA 2023
CONFIGURATION STEPS:
1) Maintain BC Sets:
/SCWM/PMR_SINGLE_ORDER
/SCWM/PMR_CROSS_ORDER
/SCWM/DLV_INBOUND_PROD
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
8) Maintain stock determination group
9) Configure stock determination
10) Define Product group types
11) Define Product group
12) Maintain product group type for PSA
13) Maintain warehouse parameters for production
14) Map SAP ERP order type (PP01) to SAP EWM Document type
15) Map SAP ERP Order Type (PP01) To Sap EWM Item Type
16) Define WPT for Single Order and Cross Order
17) Determination of WPT
18) Stock Removal Strategies
18.1) Define STSS
18.2) Assign Storage Type to STSS
18.3) Define SRCI
18.4) Determine STSS for Stock Removal
19) Create Storage type for production supply area in S/4 HANA -1005
20) Create Storage Bin for Storage Type - 1005 (PSA-001) - /N/SCWM/LS01
21) Generate Activity Area for 1005 - /N/SCWM/GENA
22) Do Bin Sorting --/N/SCWM/SBST
23) Define EWM Doc Type/Item Type/ Doc Category/Item Category
24) Define Warehouse Process Type: 1100
25) Determine Warehouse Process Type
26) Define Storage Type for Staging Area (9015)
27) Create a Storage bin for Storage Type – (9015)
28) Define Work Center – PRWC
29) Assign Work Center Bin to Work Center - /N/SCWM/TWORKST
30) Create Storage type VK50
31) Generate AA for VK50 - /N/SCWM/GENA
32) Do Bin Sorting
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
33). Put Away Strategies
33.1 Define Storage Type Search Sequence
33.2 Assign Storage Type to Storage Type Search Sequence
33.3 Define Putaway Control Indicator
33.4 Specify Storage Type Search Sequence for Putaway
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
Testing Process: Cross order
1. Putaway Final Product - /N/SCWM/RFUI
========================================================================
========================================================================
CONFIGURATION STEPS:
1) Maintain BC Sets
BC Sets: /SCWM/PMR_SINGLE_ORDER
BC Sets: /SCWM/PMR_CROSS_ORDER
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
Path: Spro➔ Ref Img→ Enterprise Structure→ Definition→ Materials Management→ Maintain
storage location
Path: Spro➔ Ref Img→ Enterprise Structure→ Assignment→ Logistics Execution→ Assign
Warehouse Number to Plant and Storage Location.
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
14) Map SAP ERP order type (PP01) to SAP EWM Document type
15) Map SAP ERP Order Type (PP01) To Sap EWM Item Type
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
19) Create Storage type for production supply area in S/4 HANA -1005
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
20) Create Storage Bin for PSA Storage Type - 1005 (PSA-001) - /N/SCWM/LS01
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
SPRO→ REF IMG→ SCM EWM→ EWM→ GOODS RECEIPT PROCESS→ INBOUND
DELIVERY→ DEFINE DOCUMENT TYPES FOR INBOUND DELIVERY PROCESS
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
SPRO→ REF IMG→ SCM EWM→ EWM→ CROSS-PROCESS SETTINGS→ DEFINE
WAREHOUSE PROCESS TYPE
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
28.Define Work Center - PRWC
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
Material 2:
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
35) Create Finished material with MRP view & work Scheduling view Mandatory
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
36) Maintain Product Master for 2 Raw Materials and Finished product ---- /N/SCWM/MAT1
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
37) Create Routing for Finished product—CA01
Routing Group: 50000023
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
39) Create work center(S4): PRWC------ CR01
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
40) Create a BOM for Finished Product------------- CS01
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
46) Add Production Version and Routing Group to Finished Product under Work Scheduling
Tab - MM02
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
TESTING PROCESS: Single Order
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
SAVE
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
3. WM Staging - CO02
SAVE
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
4.PMR Doc --- /N/SCWM/PMR (Staging material, PSA Bin, WPT)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
6. WT for Components - /N/SCWM/MON
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
IN MONITOR
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
IN T-Code: CO02
IN MONITOR
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
Testing Process: Cross Order
1. Putaway Final Product - /N/SCWM/RFUI
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
GO TO MONITOR
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)
ADVANCED PRODUCTION INTEGRATION
(SAP PP-EWM INTEGRATION)
ROHELA TECH IT SOLUTIONS +91 7794005224 Advanced Production Integration (SAP PP-EWM INTEGRATION)