Scheme Drawings 19th Sept 2024

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

44,000 NOTES

A B C D E F G A B C D E F G
01 01 GENERAL
OAD
500

R 5,000
CONSTRUCTION
ISTING 23M 3,091 5,592 5,592 3,091 5,592 3,091
EX All soil under slab and around external foundations to be treated with an approved

Y
200 200 200 200 200 200 200 200 200 200 200 200 200
3,091 5,592 5,592 3,091 5,592 3,091
2,891 600 1,992 2,400 2,400 1,992 600 2,891
445
2,400 1,992 600 2,891 anti-termite chemical treatment.
645 2,000 645 600 2,392 1,500 2,000 1,500 2,392 600 645 2,000 1,100 1,500 2,392 600 645 2,000 645
All slabs at ground level to be poured over 500gauge polythene sheeting, on
20M
28,747

200

200

200
Line of Building 50mm thick murram blinding, on average 300mm thick well selected and

850

850
44M
Line of Building

9m R
Above
ENTRANCE

Wardrobe

Wardrobe

Wardrobe
compacted hardcore fill.

1,450
Above swdp swdp

Parking Parking

30M

2,300

650 1,000

650 1,000

2,300
GATE Parking pv
DSQ pv
pv
All works and supervision to be undertaken by competent personnel.

oad
DSQ DSQ

7,320
UTILITY UTILITY ceramic tiles UTILITY ceramic tiles
All drawings to be read in conjuction with each other and relevant contract
ceramic tiles

850
pv pv
swdp swdp swdp swdp swdp AREA AREA AREA pv swdp

4,000
1 1 1 pv pv
1

200
pv

200

200
pv

200
pv
1 2 3 4 5 6 7 8 9 10
pv pv pv pv pv pv pv
documents.
200 200 200 200 200 200 200 200 200 200

5,400
2,891 2,306 1,986 900 900 1,986 2,306 2,891 900 1,986 2,306 2,891 Contractor to ascertain all levels, gradients and materials; in case of any
47.80M

1,926
54.60
25M BEDROOM COMMON COMMON BEDROOM COMMON BEDROOM
irregularities, to be notified to the architect or engineer on site before
9M KITCHEN KITCHEN KITCHEN

3,208

3,208
01 BATH BATH 01 BATH 01
Lawn

183 200
commencement of works.
M Non-slip ceramic tiles Non-slip ceramic tiles Non-slip ceramic tiles Non-slip ceramic tiles Non-slip ceramic tiles Non-slip ceramic tiles
ceramic tiles

9,717
ceramic tiles ceramic tiles
200 200
MH
1,506 800
Figured dimensions take prefence, i.e. do not scale drawings.

900
pv
Line of Building 1,423 Wardrobe Wardrobe pv Wardrobe
200 200
Unless otherwise stated, all dimensions are in millimetres.

7,017

7,217

7,217

7,017
200

200

200
Above pv 2,886 pv

NGONG/NGONG/54052 1,000 Line of Building Wardrobe Wardrobe Wardrobe


All soil on cut embarkments to be stabilised, the slope not exceed the natural

29.
X XAbove X X
24.60
200 200 200 200 200 200 200
Septic Tank Below

1M

150

150
3,091 900 4,292 4,292 900 3,091 4,292 900 3,091
angle of repose.
Drive Way

4,100

900

900
MASTER SITTING SITTING MASTER SITTING MASTER

3,408

3,408

3,408
STRUCTURAL

Non-slip ceramic tiles


M

Non-slip ceramic tiles


Non-slip ceramic tiles
MH BEDROOM ROOM ROOM BEDROOM ROOM BEDROOM
Foundation depth to be determined on site and to the approved bearing.

1,500

1,500
ceramic tiles ceramic tiles ceramic tiles ceramic tiles ceramic tiles ceramic tiles

All R.C works to be as per Structural Engineer's details.


1,500 6,987 1,698
20M 51M

24,600
pv pv pv pv pv pv pv
2 2 2 pv
2

200

200

200

200

200

200
swdp swdp swdp 645 2,000 645
pv
swdp 900 1,527 2,000 964
200
964 1,990 1,538
pv
900 645
swdp 2,000 645 900 892 2,000 700 900 swdp
645 2,000 645
No casting of any works to be underaken without his prior inspection and

1,276
200 150 200 200 200 150 200 bedding 200 150 200
approval.

1,457
150mm thick concrete

1,863
2,891 950 4,292 4,292 950 2,891 on A142BRC Mesh on 4,292 950 2,891
1000 gauge Polythene DPM on
50mm Blinding on 450mm
thick hand packed well All walls less than 200mm thick to bereinforced with hop irons at alternate courses.
KIBIKO ROAD Drive Way

29,100
DOWN

DOWN
200
All surfaces to be clear of black cotton soil to a distance of 500mm inside the edge
compacted murram Hardcore.
4,082

24,360
11 12Parking 13 14

2,007

5,127

5,127

2,375

5,127
1,270
11,354
12

13

14

15

16

17

18

19

12

13

14

15

16

17

18

19

20
Pedestrian Access of the surface.

04

03

04

03
11 11

10

10

1
MECHANICAL
19R x 150 20R x 150

UP

UP
18G x 300 19G x 300

Line of Building 200


All plumbing and drainage works to comply to relavant local authority and M.O.H

1,793
4,082 2,066 5,498 1,080
Above

1,463

1,276
Line of Building
Above
swdp swdp swdp
645 2,000
swdp
645 900 1,448 2,079
64
900
200
900
64
2,000 1,527 900
swdp
645 2,000 645 900 892 2,000 700 900
swdp
645 2,000 645
regulations.
3 3 3 pv
3

200

200
200

200

200

200

200

200
pv pv pv pv pv pv pv pv pv pv
Permanent ventillation to be provided above all doors and windows except above

Non-slip ceramic tiles


w.c doors.

1,500
Non-slip ceramic tiles
Non-slip ceramic tiles
Line of Building

2,400

2,400

2,400
MASTER SITTING SITTING MASTER SITTING MASTER Soil vent pipe (svp) to be provided at the head of drainage.

9M ROAD
Above

3,408

3,408
Line of Building BEDROOM ROOM ROOM BEDROOM ROOM BEDROOM All mechanical and electrical works to be coordinated; anomalies to be clarified

4,400

900
Drive Way MH MH Above ceramic tiles ceramic tiles ceramic tiles ceramic tiles ceramic tiles
before commencement of wporks.

150

150

150

150
ceramic tiles

858

858

858
Wardrobe Wardrobe Wardrobe All service ducts to be accessed from all floors.

7,017

7,217

7,217

7,017
200

200

200 183 200

200

200
pv pv
200
Wardrobe
200 200 200
Wardrobe
200
200 200 Wardrobe Drains passing beneath buildings and driveways to be encased in 150mm thick

900
2,891 pv1,100 900 2,891
1,506 800

683

683
concrete surriund.

F
BEDROOM BEDROOM BEDROOM

200

200
Plastering to be done after testing of pipes.

3,208

3,208
01 COMMON KITCHEN KITCHEN COMMON 01 KITCHEN COMMON 01
Lawn Play Area BATH BATH BATH ELECTRICAL

1,926

1,926
Parking ceramic tiles Non-slip ceramic tiles Non-slip ceramic tiles ceramic tiles Non-slip ceramic tiles ceramic tiles
Non-slip ceramic tiles Non-slip ceramic tiles Non-slip ceramic tiles
All condiuts to be laid before plastering.
pv
4 4 4 4

200

200

200

200
pv pv pv pv pv pv pv pv pv pv
pv
15 16 17 18 19 20 21 22 UTILITY UTILITY LEGEND

1,000 650

1,000 650
swdp swdp swdp swdp swdp swdp
pv pv pv
Line of Building AREA AREA
DSQ DSQ DSQ pv
IC- Inspection Chamber

2,300

2,300
Above pv

Wardrobe

Wardrobe

Wardrobe
Line of Building ceramic tiles
swdp
ceramic tiles
swdp
ceramic tilestiles
ceramic

Above PV- Permanent Vent

850

850
MH- Man Hole

200

200
200 445 200

Lawn 645
200
2,000
2,891
645 600
200 200
600
2,392
1,992
200
1,501
2,400
899
200
900
2,400
1,500
200
2,392
1,992
600 645
200 200
600
2,000
2,891
200
900
2,400
1,500
200
2,392
1,992
600 645
200 200
600
2,000
2,891
645
200
HWC- Hot Water Cylinder
GT- Gulley Trap

Y
3,091 5,592 5,592 3,091 5,592 3,091 FT- Floor Trap
26,247
02 02
This drawing is copyright. C
A B C D E F G A B C D E F G
LOCATION PLAN
51,000 Service Road
9 metre road

GROUND FLOOR PLAN Scale 1:150 TYPICAL 1st-5th FLOOR PLAN Scale 1:150
No. DATE REVISIONS SIGN
A B C D E F G
01

3,091 5,592 5,592 3,091 5,592 3,091

Y
500
A B C 44,000 01
D E F G
200
3,891
200
300 2,592
200
4,400
200
300 2,592
200
5,691
200
2,592
200
3,891
200
200

300
5,000
500
500
1,319

1,219
Y

3,091 5,592 5,592 3,091 5,592 3,091


200

28,747

1,281
Line of Building
Line of Building Above
ENTRANCE Above
GATE Parking Parking Parking 1 1
7,320

PROJECT TITLE
swdp swdp swdp swdp
4,000

1 1
1 2 3 4 5 6 7 8 9 10
5,400

Lawn
CLOTHES HANGING LINES AREA
Concrete Tiles Floor Finish
PROPOSED RESIDENTIAL DEVELOPMENT ON
NGONG/NGONG/54052
MH
8,598

Line of Building 1,423


7,017

7,217
Above 1,000 Line of Building

KAJIADO COUNTY
X XAbove
Septic Tank Below X X
Drive Way
4,100

MH

DEVELOPER
1,500 6,987 1,698 200 200 200 200 200
24,600

5,889 4,082 1,500 6,832 7,945


2 2
swdp swdp swdp
1,457

200 300 200

2 2
200

Drive Way
JUSLINE SOILA LEMPAKA

500
29,100
DOWN

200

964

11 12Parking 13 14
2,007

5,127

5,127

11,354
12

13

14

15

16

17

18

19

Pedestrian Access
04

03

11
10

P. O BOX 54259 - 00200 NAIROBI, KENYA


19R x 150
UP

18G x 300

Line of Building
Above
1,463

Line of Building
swdp swdp swdp WATER TANKS AREA
3,927

3,000

Above
04

03
3 3 Terrazo floor finish

Line of Building

FLOOR AREAS
Above
Line of Building
4,400

Drive Way
200 300 200

MH MH Above
963
200

500
3 3 GROUND FLOOR- - SQ.M (Parking Level)
7,017

200

1ST FLOOR - 5TH FLOOR- 498 SQM PER FLOOR


200 200 200 200 200
Lawn Parking Play Area 5,889 4,082 1,500 6,832 7,945

4 4
Line of Building
swdp
15 swdp
16 17 18 swdp
19 20 swdp
21 22 ARCHITECTS
7,217

Above
Line of Building
8,598

Above

Lawn ROOF TERRACE


Concrete Tiles floor finish
Y

02
A B C D E F G
4 4
51,000 Service Road
1,281

Line of Building
Above
200

1,219
1,319

300
200

P.O. BOX 21845, -00505-NAIROBI - KENYA

KIBIKO R O A CELL +254-722-962 845


Y

D 02
EMAIL: [email protected]
A B C D E F G WEBSITE: www.arcscene.com

DRAWING TITLE

PLANS
ROOF PLAN Scale 1:150 SEPTIC TANK SCALE: 1:100 PROJECT NO.
DRG. NO.

01 0F 02
JMN
SITE PLAN Scale 1:200
DESIGNED:
ARC-108-24
DRAWN: JMN
DATE:
SEPT 2024

CHECKED:
NOTES
GENERAL
CONSTRUCTION
All soil under slab and around external foundations to be treated with an approved
anti-termite chemical treatment.
All slabs at ground level to be poured over 500gauge polythene sheeting, on
50mm thick murram blinding, on average 300mm thick well selected and
compacted hardcore fill.
All works and supervision to be undertaken by competent personnel.
G F E D C B A G F E D C B A 4 3 2 1
All drawings to be read in conjuction with each other and relevant contract
3.091 5.592 3.091 5.592 5.592 3.091 documents.
Reinforced concrete slab with approved 3.091 5.592 3.091 5.592 5.592 3.091 7.017 5.127 7.017 Contractor to ascertain all levels, gradients and materials; in case of any
waterproofing to Structural Engineer's irregularities, to be notified to the architect or engineer on site before

0.150 0.150 0.450


details. commencement of works.

0.450 0.450
Figured dimensions take prefence, i.e. do not scale drawings.
Unless otherwise stated, all dimensions are in millimetres.
1,200mm high,200mm thick Parapet wall
All soil on cut embarkments to be stabilised, the slope not exceed the natural

2.100

1.950
WATER TANKS with Machine cut stone plastered and

1.200
painted to architect's approval. angle of repose.

0.325 0.150

0.300 0.150
17,000mm

STRUCTURAL
Foundation depth to be determined on site and to the approved bearing.

1.350
All R.C works to be as per Structural Engineer's details.

2.400
No casting of any works to be underaken without his prior inspection and
0.927

1.025
Master Bedroom Stairwell Master Bedroom approval.

0.325 0.150

0.300 0.150
14,250mm

All walls less than 200mm thick to bereinforced with hop irons at alternate courses.
All surfaces to be clear of black cotton soil to a distance of 500mm inside the edge

1.350
of the surface.

2.400
MECHANICAL

1.025
Master Bedroom Stairwell Master Bedroom All plumbing and drainage works to comply to relavant local authority and M.O.H

0.325 0.150

0.300 0.150
11,400mm
0.150

regulations.
Window to Window Schedule Permanent ventillation to be provided above all doors and windows except above

1.350
w.c doors.

2.400
Soil vent pipe (svp) to be provided at the head of drainage.
0.930

1.025
Master Bedroom Stairwell Master Bedroom

0.325 0.150

0.300 0.150
All mechanical and electrical works to be coordinated; anomalies to be clarified
8,550mm
0.150

before commencement of wporks.


200mm thick machine cut stone All service ducts to be accessed from all floors.

1.350
plastered and painted to Architect's
Drains passing beneath buildings and driveways to be encased in 150mm thick

2.400
Approval.
concrete surriund.
0.923

1.025
Master Bedroom Stairwell Master Bedroom

0.325 0.150

0.300 0.150
5,700mm
Plastering to be done after testing of pipes.
0.150

ELECTRICAL
All condiuts to be laid before plastering.

1.350

2.400
Mild Steel railing to details LEGEND
0.923

1.025
Master Bedroom Stairwell Master Bedroom

0.300 0.150
2,850mm
IC- Inspection Chamber
PV- Permanent Vent
MH- Man Hole
400 x 200mm RC Column
HWC- Hot Water Cylinder

2.800
to S.E Details.
0.00mm
GT- Gulley Trap
150mm thick concrete bedding on FT- Floor Trap
0.400

0.400

A142 BRC mesh on 1000 gauge


Polythene DPM on 50mm Blinding on
450mm thick hand packed well compacted This drawing is copyright. C
G F E D C B A
murram hardcore. 4 3 2 1 LOCATION PLAN

G F E D C B A
ELEVATION 01 ELEVATION 03
SECTION X-X

No. DATE REVISIONS SIGN

4 3 2 1 A B C D E F G 1 2 3 4

Reinforced concrete slab with approved


7.017 5.127 7.017 waterproofing to Structural Engineer's 7.017 5.127 7.017
details. PROJECT TITLE

1,200mm high,200mm thick Parapet wall


PROPOSED RESIDENTIAL DEVELOPMENT ON
with Machine cut stone plastered and
painted to architect's approval.
NGONG/NGONG/54052
0.325 0.150

17,000mm

KAJIADO COUNTY
Bedroom Master Stairwell Master Bedroom
1.350

01 Bedroom Bedroom 01 DEVELOPER


1.025
0.300 0.150

14,250mm

JUSLINE SOILA LEMPAKA


1.400

Bedroom Master Stairwell Master Bedroom P. O BOX 54259 - 00200 NAIROBI, KENYA
01 Bedroom Bedroom 01
1.000

11,400mm
0.450

Window to Window Schedule FLOOR AREAS


1.400

Bedroom Master Stairwell Master Bedroom


01 Bedroom Bedroom 01
1.000
0.300 0.150

8,550mm

200mm thick machine cut stone


1.400

plastered and painted to Architect's


Bedroom Master Stairwell Master Bedroom Approval. ARCHITECTS
01 Bedroom Bedroom 01
1.000
0.300 0.150

5,700mm
1.400

Bedroom Master Stairwell Master Bedroom


01 Bedroom Bedroom 01 Mild Steel railing to details
1.000
0.300 0.150

2,850mm

3.091 5.592 5.592 3.091 5.592 3.091


400 x 200mm RC Column
Site Terr
2.800

ain to S.E Details.


Site Terrain 0.00mm
150mm thick concrete bedding on
A142 BRC mesh on 1000 gauge P.O. BOX 21845, -00505-NAIROBI - KENYA
Polythene DPM on 50mm Blinding on CELL +254-722-962 845
450mm thick hand packed well compacted
murram hardcore. A B C D E F G EMAIL: [email protected]
1 2 3 4
WEBSITE: www.arcscene.com

ELEVATION 02 ELEVATION 04 DRAWING TITLE


4 3 2 1
SECTIONS & ELEVATIONS
SECTION Y-Y SCALE: 1:100 PROJECT NO.
DRG. NO.

02 0F 02
DESIGNED: JMN ARC-108-24
DRAWN: JMN
DATE:
SEPT 2024

CHECKED:

You might also like