Shower Test
Shower Test
summarize
The shower room is set up with 1 room body and 1 set of spraying equipment installed; about 50 centimeters of
platform with a simple type of shower room with a cistern. The structure is shown below:
seria
93
Drench circulating
2 Designed to meet process requirements
water pump
Manual/automatic water
3 DN65
replenishment device
Electromagnetic flow 3
10 250 m /h
meter
12 converter 15kw
Low-voltage electrical
13 Schneider (name)
components
catch basin is used for storing the water for spraying, and the interface with
the floor is paved with galvanized grating, in which there is an oil and sand
barrier wall, and a stainless steel strainer is provided at the suction point
of the water pump. The capacity of the catch basin is about 10m3 . Waterproof
5.11.3 Chambers
The wall plate of the shower room body is made of 0.8mm stainless steel
plate, and the corner of the room body is spliced and wrapped to deal with the
appearance of smooth and beautiful. Room body size: length 6m * width 3.5m *
height 3m, the middle wheel guide set in the space, left and right symmetry,
94
size: length 6m (including before and after the two sides of the guide each
External piping
5.11.4 Circulating water pumps
The water pumps are installed on the outside of the chamber, designed for
one-use and one-standby working mode, and the water pumps are all horizontal
pumps for easy maintenance. In order to achieve accurate rain intensity, the
equipped with pressure sensors, can automatically adjust the size of the
ensure that the user to implement the monitoring of the accuracy of the
pressure.
According to the rainfall intensity requirements, rain shower room pump
head in about 40m motor power of about 15KW, according to the seller's
specific design to confirm, and give the basis for calculation. And combined
with the pressure and the amount of water spray control requirements, pump
95
selection, the seller's specific design to confirm, and give the basis for
calculation.
5.11.5 Circulation lines
Pumps are installed at the entrance and exit of the shock-absorbing
devices and manual valves, the use of standby pumps need to be manually
switched valves, maintenance personnel in the electronic control cabinet to
open the key switch can be used, so as to prevent the site operator do not
operate the pumps will be destroyed. In order to allow the pump can be
started at any time, in front of the pump suction port is equipped with a
stainless steel self-priming bucket. Pump start and stop is through the room
body outside the photoelectric to control. When the car into the shower room
before the photoelectric switch sensor, the pump can be started, in a long
time no vehicle into the pump will automatically stop running, play a role in
energy saving.
Equipment all piping using 304 series stainless steel materials, pipe
diameter wall thickness and other parameters in line with the design
requirements. Sprinkler system main pipe diameter in accordance with meet the
pressure requirements;
Reasonable configuration of the main pipeline and pipeline, so that the
nozzle injection pressure difference between the minimum, the maximum
pressure difference between the branch pipeline and the nozzle is less than
0.3bar.
Sprinkler system set up pumps and pressure monitoring system, and in the
software to realize the pump failure and alarm, in the control panel human-
machine interface can also facilitate the implementation of manual switching
between the work of the main backup pumps, switching before the need to
determine the pumps before and after the switching of the valve work.
5.11.6 Electromagnetic flow meters
In order to ensure that the spraying process in each pipeline and even
each nozzle spray pressure and flow in the set parameters to maintain a
96
balanced, this program in regulating the flow of inverter and manual valve to
regulate and control, and to achieve the actual value of the flow of the
Pipes and pipe fittings (tees, elbows, etc.) are made of stainless steel
SUS304. Pipe connection using welding process, must be neat, in place, firm.
that the nozzle outlet pressure equalization. Each nozzle are equipped with
pressure gauges and various types of valves, can show the nozzle spray
pressure state, and in the end of each spray pipe manual ball drain valve, in
order to flush the pipe to eliminate the use of dirt. According to the
requirements of each side of the spray pipeline are equipped with butterfly
valves for individual control, butterfly valves are equipped with pressure
gauges after the group, the pressure gauge with Shanghai production, 0-4bar,
double dial.
Manual butterfly valves, pneumatic butterfly valves, bypass pipes, flow
meters, manometers, etc. must be present on the water supply line.
5.11.7 Nozzle arrangement
Shower room nozzles according to the buyer's requirements, the nozzle
spray rain should be a 60-degree angle of conical uniform water mist, and all
the nozzles spray pressure deviation in ± 10KPa within the body side nozzles
from the body 0.5-0.7 meters;
All nozzles are equipped with quick couplings and adjustable ball fitting
bodies, and the nozzles are mounted on the pipeline by means of quick clamp
fittings, which are easy to dismantle and install; the seller selects the
nozzle models in accordance with the buyer's requirements on spraying
pressure and precipitation intensity. The pipeline is shaped as much as
possible to ensure that the exterior of the car body can be evenly covered by
artificial rain. The nozzles are solid cone nozzles, with a spray angle of 60
degrees, and no dead zone in the body coverage.
97
(1) Installation interval of 400mm × 400mm, (except for the bottom
spray each row of 2 in addition to each rain surface each row to
install 5 nozzles)
installation;
plane, and the side nozzle is perpendicular to the side of the car
body;
4) Top: 4*14 = 55; left side: 5*14 = 80; right side: 5*14 = 80
Rainfall accessories
5.11.8 Rainfall measuring devices
The shower room needs to be equipped with a rain measuring device,
98
(4) The whole set of testing devices should be corrosion-resistant, the
6)From the beginning to the stop of the test a total of 4min, according
to the height of the liquid level in the barrel to determine the intensity of
the rain, in the inspection window qualified section with a green marking,
99