0% found this document useful (0 votes)
59 views7 pages

Shower Test

Uploaded by

No Tama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views7 pages

Shower Test

Uploaded by

No Tama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

5.

11 Rain shower room

summarize
The shower room is set up with 1 room body and 1 set of spraying equipment installed; about 50 centimeters of
platform with a simple type of shower room with a cistern. The structure is shown below:

5.11.1 Main components of equipment

seria

l Specification and technical quantit


Equipment Name
numbe parameters ies
r

1 ventricular Designed to meet process requirements 1 set

93
Drench circulating
2 Designed to meet process requirements
water pump

Manual/automatic water
3 DN65
replenishment device

4 Sprinkler mains Non-standard production SUS304

5 Sprinkler branch line Non-standard production SUS304

6 valves By project requirements

7 extrusion nozzle As designed

8 Pressure gauge set 0~4bar

9 liquid level meter 0~20ma 24v

Electromagnetic flow 3
10 250 m /h
meter

11 Pressure sensors 4~20mA, 24v

12 converter 15kw

Low-voltage electrical
13 Schneider (name)
components

14 float valve DN65

15 Catchment covers Non-standard production

Pumps and valves area


16 Non-standard production
guardrail

5.11.2 Water catchment systems


A water collection system is built in a brick structure on the ground. The

catch basin is used for storing the water for spraying, and the interface with

the floor is paved with galvanized grating, in which there is an oil and sand

barrier wall, and a stainless steel strainer is provided at the suction point

of the water pump. The capacity of the catch basin is about 10m3 . Waterproof

and non-slip tiles are laid in the catchment system.

5.11.3 Chambers
The wall plate of the shower room body is made of 0.8mm stainless steel

plate, and the corner of the room body is spliced and wrapped to deal with the

appearance of smooth and beautiful. Room body size: length 6m * width 3.5m *

height 3m, the middle wheel guide set in the space, left and right symmetry,

94
size: length 6m (including before and after the two sides of the guide each

0.6m) * width 1.1m.

External piping
5.11.4 Circulating water pumps
The water pumps are installed on the outside of the chamber, designed for

one-use and one-standby working mode, and the water pumps are all horizontal

pumps for easy maintenance. In order to achieve accurate rain intensity, the

pump adopts frequency conversion control. Circulation of the main line is

equipped with pressure sensors, can automatically adjust the size of the

frequency converter, to achieve the stability of the nozzle pressure, to

ensure that the user to implement the monitoring of the accuracy of the

pressure.
According to the rainfall intensity requirements, rain shower room pump
head in about 40m motor power of about 15KW, according to the seller's
specific design to confirm, and give the basis for calculation. And combined
with the pressure and the amount of water spray control requirements, pump

95
selection, the seller's specific design to confirm, and give the basis for
calculation.
5.11.5 Circulation lines
Pumps are installed at the entrance and exit of the shock-absorbing
devices and manual valves, the use of standby pumps need to be manually
switched valves, maintenance personnel in the electronic control cabinet to
open the key switch can be used, so as to prevent the site operator do not
operate the pumps will be destroyed. In order to allow the pump can be
started at any time, in front of the pump suction port is equipped with a
stainless steel self-priming bucket. Pump start and stop is through the room
body outside the photoelectric to control. When the car into the shower room
before the photoelectric switch sensor, the pump can be started, in a long
time no vehicle into the pump will automatically stop running, play a role in
energy saving.
Equipment all piping using 304 series stainless steel materials, pipe
diameter wall thickness and other parameters in line with the design
requirements. Sprinkler system main pipe diameter in accordance with meet the
pressure requirements;
Reasonable configuration of the main pipeline and pipeline, so that the
nozzle injection pressure difference between the minimum, the maximum
pressure difference between the branch pipeline and the nozzle is less than
0.3bar.
Sprinkler system set up pumps and pressure monitoring system, and in the
software to realize the pump failure and alarm, in the control panel human-
machine interface can also facilitate the implementation of manual switching
between the work of the main backup pumps, switching before the need to
determine the pumps before and after the switching of the valve work.
5.11.6 Electromagnetic flow meters
In order to ensure that the spraying process in each pipeline and even

each nozzle spray pressure and flow in the set parameters to maintain a
96
balanced, this program in regulating the flow of inverter and manual valve to

regulate and control, and to achieve the actual value of the flow of the

correct display under the working condition.

Pipes and pipe fittings (tees, elbows, etc.) are made of stainless steel

SUS304. Pipe connection using welding process, must be neat, in place, firm.

Do not allow the phenomenon of water dripping. Piping arrangement to ensure

that the nozzle outlet pressure equalization. Each nozzle are equipped with

pressure gauges and various types of valves, can show the nozzle spray

pressure state, and in the end of each spray pipe manual ball drain valve, in

order to flush the pipe to eliminate the use of dirt. According to the

requirements of each side of the spray pipeline are equipped with butterfly

valves for individual control, butterfly valves are equipped with pressure

gauges after the group, the pressure gauge with Shanghai production, 0-4bar,

double dial.
Manual butterfly valves, pneumatic butterfly valves, bypass pipes, flow
meters, manometers, etc. must be present on the water supply line.
5.11.7 Nozzle arrangement
Shower room nozzles according to the buyer's requirements, the nozzle
spray rain should be a 60-degree angle of conical uniform water mist, and all
the nozzles spray pressure deviation in ± 10KPa within the body side nozzles
from the body 0.5-0.7 meters;
All nozzles are equipped with quick couplings and adjustable ball fitting
bodies, and the nozzles are mounted on the pipeline by means of quick clamp
fittings, which are easy to dismantle and install; the seller selects the
nozzle models in accordance with the buyer's requirements on spraying
pressure and precipitation intensity. The pipeline is shaped as much as
possible to ensure that the exterior of the car body can be evenly covered by
artificial rain. The nozzles are solid cone nozzles, with a spray angle of 60
degrees, and no dead zone in the body coverage.

97
(1) Installation interval of 400mm × 400mm, (except for the bottom
spray each row of 2 in addition to each rain surface each row to
install 5 nozzles)

(2) Nozzle selection of solid conical PVC nozzle, clamping

installation;

3) Spray angle, the top nozzle is perpendicular to the horizontal

plane, and the side nozzle is perpendicular to the side of the car

body;

4) Top: 4*14 = 55; left side: 5*14 = 80; right side: 5*14 = 80

Rainfall accessories
5.11.8 Rainfall measuring devices
The shower room needs to be equipped with a rain measuring device,

which is made as follows:

1)Measurement device cylinder size: 1000mm x 1000mm x 500mm (L x W x H).

2)Height of testing device stand (including height of casters): 900mm.

(3) The testing device is equipped with 2

directional casters and 2 universal casters with

brakes to facilitate the movement of the testing device.

98
(4) The whole set of testing devices should be corrosion-resistant, the

skeleton is made of 304 stainless steel, stainless steel measuring cylinder.

(5) A transparent inspection window with a clear scale is provided on the

measuring cylinder; a drain valve is provided at the bottom of the cylinder.

6)From the beginning to the stop of the test a total of 4min, according

to the height of the liquid level in the barrel to determine the intensity of

the rain, in the inspection window qualified section with a green marking,

the marking should be able to permanently

5.12 Auxiliary tools (light shed)

1. Number of mobile light shed requirements: 4 sets


2. Light shed technical specifications
2-1. light frame size: total length 2.5m × height 1.5m × 0.6m, base
width 0.5m (mobile, with pulleys, with locking function) placed on both sides
of the downline confirmation post, frame structure material for the aluminum
profile 30x30.
2-2. Control mode: set up separate control switch on the inside of each
light stand, and reserve 1500mm three-plug connecting line for connecting
and energizing when using.
2-3. Lighting fixtures: each lampshade is installed with 3 Philips light
tubes, the colors are arranged according to white, yellow and white.
Lampshade with reflective aluminum plate, the color of the inner side of the
lampshade is black, the cover of the lampshade should be easy to disassemble,
and the light tube can be replaced by a single one.
Lampshade size: 1200mm*50mm;
Light tube classification: 1000mm LED white; 1000mm LED orange
2-4 Light Stand Style

99

You might also like