Hydel Potential in Pakistan
Hydel Potential in Pakistan
Hydel Potential in Pakistan
God has blessed Pakistan with a tremendous hydel potential of more than 40,000 MW. However, only 15% of the hydroelectric potential has been harnessed so far. The remaining untapped potential, if properly exploited, can effectively meet Pakistans ever-increasing demand for electricity in a cost-effective way. To exploit Pakistans hydel resource productively, huge investments are necessary, which our economy cannot afford except at the expense of social sector spending. Considering the limitations and financial constraints of the public sector, the Government of Pakistan announced its Policy for Power Generation Projects 2002 package for attracting overseas investment, and to facilitate tapping the domestic capital market to raise local financing for power projects. The main characteristics of this package are internationally competitive terms, an attractive framework for domestic investors, simplification of procedures, and steps to create and encourage a domestic corporate debt securities market. In order to facilitate prospective investors, the Private Power & Infrastructure Board has prepared a report titled Pakistan Hydel Power Potential, which provides comprehensive information on hydel projects in Pakistan. The report covers projects merely identified, projects with feasibility studies completed or in progress, projects under implementation by the public sector or the private sector, and projects in operation. Today, Pakistan offers a secure, politically stable investment environment which is moving towards deregulation and an open market economy. The Government invites investors to invest in the hydel power sector and assures them its fullest possible support in implementation of their projects.
AFTAB AHMAD KHAN SHERPAO Federal Minister for Water & Power
Blank
Table of Contents
Introduction Chapter 1: 1.1 1.2 1.2.1 1.2.2 1.3 1.4 1.5 1.6 1.7 Pakistan Power Sector The Ministry of Water & Power WAPDA (Water & Power Development Authority) GENCOs DISCOs PPIB (Private Power & Infrastructure Board) KESC (Karachi Electric Supply Corporation) NEPRA (National Electric Power Regulatory Authority) Energy Wing- Planning & Development Division Power Sector Institutions and Departments in the Provinces and AJK 1.7.1 1.7.2 1.7.3 1.7.4 1.7.5 Chapter 2: Chapter 3: Chapter 4: Chapter 5: Chapter 6: Chapter 7: Chapter 8: Chapter 9 9.1 9.2 Sarhad Hydel Development Organization (SHYDO) Punjab Power Development Board (PPDB) Irrigation and Power Department Sindh (IPDS) AJK Hydro Electric Board (HEB) and AJK Private Power Cell (PPC) Northern Areas Public Works Department (NAPWD) Hydel Power Potential of Pakistan Hydel Potential in NWFP Hydel Potential in Punjab Hydel Potential in AJK Hydel Potential in Northern Area Hydel Potential in Sindh Hydel Potential in Balochistan Policies and Incentives for Hydel Power Generation Introduction Power Policies Announced by the GOP 9.2.1 9.2.2 9.2.3 9.2.4 9.3 1994 Power Policy 1995 Hydel Power Policy 1998 Power Policy Power Policy, 2002 3 9 9 10 10 10 10 11 11 11 11 11 12 12 12 12 15 21 35 51 65 81 87 91 91 91 91 92 92 92 94 101
List of Tables
TABLE No. 2.1 2.2 NWFP 3.1 3.2 3.3 3.4 3.5 3.6 Projects in Operation Projects Under Implementation by Public Sector Projects Under Implementation by Private Sector Raw Sites Identified (Above 50 MW) Raw Sites Identified (Below 50 MW) Solicited Sites Identified (Above 50 MW, Below 50 MW) Punjab 4.1 4.2 4.3 4.4 AJK 5.1 5.2 5.3 5.4 5.5 5.6 Projects in Operation Projects Under Implementation by Public Sector Projects in Private Sector Raw Sites Identified in AJK (Above 50 MW) Raw Sites Identified in AJK (Below 50 MW) Solicited Sites Identified in AJK (Above 50 MW, Below 50 MW) Northern Area 6.1 6.2 6.3 6.4 6.5 Sindh 7.1 7.2 Raw Sites Identified (Above and Below 50 MW) Solicited Sites Identified (Below 50 MW) 82 82 Projects in Operation Projects Under Implementation by Public Sector Raw Sites Identified (Above 50 MW) Identified Hydel Potential (Below 50 MW Raw Sites) Solicited Sites Identified (Above and Below 50 MW) 66 68 69 72 77 52 54 54 56 58 60 Projects in Operation Projects Under Implementation by Public Sector Raw Sites Identified (Below 50 MW) Solicited Sites Identified (Above 50 MW, Below 50 MW) 36 36 38 47 22 24 24 26 28 31 DESCRIPTION Comparative Summary of the Hydel Projects in Various Stages of Competition in Various Regions of Pakistan Existing Hydel Power Stations in Pakistan
16 16
List of Appendices
Appendix-I Appendix-II Total Hydel Potential Government Institutions Related to Hydro Power Development 99 100
List of Figures
Figure 2.1 Figure 3.1 Figure 3.2 Figure 3.3 Figure 3.4 Figure 3.5 Figure 4.1 Figure 4.2 Figure 5.1 Figure 5.2 Figure 5.3 Figure 5.4 Figure 5.5 Figure 6.1 Figure 6.2 Figure 6.3 Figure 6.4 Figure 7.1 Figure 8.1 Province Wise Installed Hydel Generation Capacity (6595,032) Projects in Operation in NWFP Projects Under Implementation by Public/Private Sector in NWFP Projects Above 50 MW (Raw Sites) in NWFP Projects Below 50 MW (Raw Sites) in NWFP Projects Above and Below 50 MW (Solicited Sites) in NWFP Projects in Operation and Under Implementation in Punjab Projects Above and Below 50 MW (Solicited Sites) in Punjab Projects in Operation in AJK Projects under implementation by public/private sector in AJK Projects Above 50 MW (Raw Sites) in AJK Projects Below 50 MW (Raw Sites) in AJK Solicited Projects in AJK Projects in Operation in Northern Area Projects Above 50 MW (Raw Sites) in Northern Area Projects Below 50 MW (Raw Sites) in Northern Area Projects Above and Below 50 MW (Solicited Sites) in Northern Area Identified Hydel Potential in Sindh Identified Hydel Potential in Baluchistan 17 23 25 27 30 32 37 48 53 55 57 59 61 70 71 76 78 83 88
Blank
INTRODUCTION
Blank
Introduction
Pakistan is a water-rich country but, unfortunately, Pakistans energy market investment in hydelpower generation has been caught up in confusion and paradoxes for more than a decade, and no significant progress has been achieved so far. On the other hand, the Government is trying to facilitate private investors to promote hydel power generation in the country. Hydropower is a primary domestic source of energy. Pakistan is endowed with a hydel potential of approximately 41722 MW, most of which lies in the North West Frontier Province, Northern Areas, Azad Jammu and Kashmir and Punjab. Electric power is a stimulator for the socio-economic uplift of the country. However, only half of the countrys population has access to electricity. After the creation of Pakistan, the country faced numerous problems including dearth of electrical power. Hydropower development in the IndoPak subcontinent started in 1925, with the construction of the Renala 1 MW hydropower station. After a decade, the 1.7 MW Malakand-I hydropower station was built, which was later upgraded to a 20 MW capacity. Subsequently, in 1953, the 20 MW Dargai hydropower station was commissioned. At the time of independence, Pakistan inherited a very small power base of only 60 MW capacity for its 31.5 million people. At the time of creation of WAPDA in 1958, the countrys total hydel potential capacity was enhanced to 119 MW. By the Indus Water Treaty in 1960, it was decided that Pakistan is entitled to 142 MAF (Indus 93, Jhelum 23 and Chenab 26) of water utilization. Subsequently, 240 MW Warsak, 1000 MW Mangla and 3478 MW Tarbela Hydropower Projects were constructed. For the success of economic activities, electricity is a basic ingredient. The total installed capacity of the hydropower stations in the country is about 6595 MW, out of which 3767 MW is in NWFP, 1698 MW in Punjab, 1036 MW in AJK and 93 MW in the Northern Areas. However, an abundant hydel potential is still untapped which needs to be harnessed. This report has been prepared on the basis of data available in this office and information obtained from various organizations. The report provides information on the following: Projects in Operation Projects under implementation in the public sector Projects under implementation in the private sector Projects with Feasibility Study completed Projects with Pre-Feasibility Study completed / Raw Sites
In Pakistan, hydel resources are mainly in the north, however, in the south there are scarce hydel resources available. Comprehensive detail of total hydel potential in Pakistan is at Appendix-I. The hydel potential of Pakistan can be divided into six sectorial regions, namely: NWFP Punjab Azad Jammu & Kashmir
The Government of NWFP has established a corporate body known as the Sarhad Hydel Development Organization (SHYDO) for carrying out hydro-power prospects, hydro-power development and to act as a utility company for isolated rural communities. With the assistance of WAPDA and GTZ, SHYDO prepared a Master Plan for the development of hydro-power potential in NWFP. Accordingly, the Regional Power Development Plan was completed with pertinent technical and financial data of different hydel sites in NWFP. About 150 potential sites, with a total capacity of 18698 MW were identified on the basis of high, medium and small head. Out of these, 17 projects are in operation, 6 sites are under implementation in the public sector and 1 site has been offered to the private sector. Mainly, these are run-of-river sites, with some as daily storage projects. In Punjab, the Punjab Power Development Board was created in the Irrigation Department in 1995, for the promotion of hydel power generation on canal sites in Punjab. At different canals, about 324 potential sites of medium and low head, with a total estimated capacity of 5895 MW were identified. Recently, WAPDA has launched the 1450 MW Ghazi Barotha hydel project as a run-of-river project . In order to exploit the plentiful hydel resources of AJK, the Government of AJK (GOAJK) established the AJK Hydro Electric Board (HEB) in 1989. The AJK HEB successfully completed the 1.6 MW Kathai, 2 MW Kundel Shahi, 2 MW Leepa, and 30.4 MW Jagran hydel power projects. Subsequently, with the intention of providing a one-window facility and to encourage the development of hydel potential in the private sector, the GOAJK created the AJK Private Power Cell (PPC) in 1995. A number of hydel projects with the total capacity of 829 MW are being processed/undertaken by the private sector. Numerous promising potential hydel sites have been identified in the Northern Areas but, due to the absence of high power transmission lines, these sites have not been developed so far. On account of difficult mountainous terrain and the absence of high power transmission line system, the Northern Areas are not connected to the National Grid and no projects have been undertaken by private investors. The Northern Areas Public Works Department (NAPWD) was established, which is responsible for the generation and distribution of electrical power. NAPWD has constructed various mini hydel power stations in the region and has built 11 KV lines for the transmission of power to consumers. A 18 MW Naltar-III Hydropower Project is under implementation in public sector. Currently, approximately 40 % of the local population of Northern Area has been provided with electrical power. The Irrigation & Power Department, Government of Sindh is responsible for conducting hydropower activities in the Province, and for facilitating and liaison with the concerened agencies. Six potential sites of an estimated total capacity of 178 MW have been identified with medium
and low head at different canals. The hydropower projects identified in the Province are Nai Gaj Fall, Sukkur (Indus /Nara Canal), Rohri canal and Guddu Barrage Projects. These projects have an estimated 178 MW capacity. Feasibility studies of the Rohri and Guddu Barrage Projects have been completed, and it is expected that implementation work will be started in the near future. Presently, no hydel projects are in operation or under implementation, either in the public or private sectors. The National Water Resources Development Programme for Balochistan included 8 irrigation projects, but none of them have the required head to generate electricity. Presently, no hydel projects are in operation or under implementation in the public sector, and no projects are being processed/undertaken by the private sector. In order to facilitate investors to participate in the development and implementation of hydel projects data pertaining to the hydel projects in operation, under implementation in public/private sector, feasibility studies and pre-feasibility studies has been compiled and is presented in the report.
Blank
Blank
CHAPTER
1.1.
The Ministry of Water & Power plays the lead role in implementation of all policy pertaining to water and power issues in the country. As per Schedule II, Rule 3(3) of the Rules of Business 1973, the following responsibilities are assigned to the Ministry of Water and Power: Matters relating to the development of water and power resources of the country Indus Waters Treaty, 1960 and Indus Basin Works Water and Power Development Authority (WAPDA) Matters relating to electric utilities Liaison with international engineering organizations in water and power sectors, such as International Commission on Large Dams, International Commission on Irrigation and Drainage, and International Commission on Large Power Systems . Federal agencies and institutions for promotion of special studies in water and power sectors Electricity Karachi Electric Supply Corporation and Pakistan Electric Agencies Limited Matters regarding Pakistan Engineering Council Institute of Engineers, Pakistan National Engineering (Services) Pakistan Limited (NESPAK) National Tube well Construction Corporation (NTCC) National Power Construction Corporation (NPCC) Indus River Systems Authority (IRSA) Private Power and Infrastructure Board (PPIB)
The Ministry of Water & Power also deals with the following areas of national activity: Electric Utilities Independent Power Projects Federal agencies and institutions for promotion of special studies in the water and power sectors
Monitoring of technical standards and specifications of materials and tools and plants used in Water and Power engineering and technologies
1.2
WAPDA was established by statute in 1958 and entrusted with a massive agenda, including generation, transmission and distribution of electrical power together with irrigation, water supply, drainage and flood control etc. It owns about 54 % of the countrys total electrical power generation capacity, and serves 88% of all electricity customers of Pakistan. The privatization of WAPDA is to be preceded by corporatization, including twelve (12) public limited companies. These twelve (12) corporate entities comprises of three (3) generation companies (GENCOs), one (1) National Transmission & Despatch Company (NTDC) and eight (8) Distribution Companies (DISCOs), as stated below:1.2.1 GENCOs 1 2 3 Southern Generation Power Company Limited (GENCO-1), headquartered at Jamshoro, District Dadu near Hyderabad, Sindh Central Power Generation Company Limited (GENCO-2), headquartered at Guddu, District Jacobabad, Sindh Northern Power Generation Company Limited (GENCO-3), headquartered at WAPDA House, Lahore, Punjab
1.2.2
DISCOs 1 2 3 4 5 6 7 8 LESCOGEPCO FESCO IESCO MEPCOPESCO HESCO QESCO Lahore Electric Supply Company Gujranwala Electric Power Company Faisalabad Electric Supply Company Islamabad Electric Supply Company Multan Electric Power Company Peshawar Electric Power Company Hyderabad Electric Supply Company Quetta Electric Supply Company
1.3
PPIB was established by the Government of Pakistan in 1994 as an extension of the Ministry of Water and Power, for encouraging participation of private entrepreneurs in the power generation. The mandate of PPIB is to: act as a one-window organization on behalf of Federal Government ministries, departments and agencies, in matters relating to the establishment of private power projects; grant consent on behalf of various official agencies in issues related to power, and to review and decide all matters relating to private power projects;
10
negotiate and finalize implementation agreements and fuel supply agreements with prospective developers; obtain bank guarantees, performance bonds, letters of credits from private power companies, to receive and (when and if necessary) refund monies relating to the above instruments; take all other actions as may be required to develop private power in the country; provide the one-window facility to private sector investor; provide sovereign guarantee to IPPs on behalf of the GOP; formulate, review and update the policies relating to private sector investment in power generation; executes security documents on behalf of the GOP; liaise with the concerned official agencies for the executing of the projects; expedite progress of private sector power projects; and provide necessary information to private sector investors.
1.4
KESC was established in 1913 and was registered under the Indian Companies Act 1882. It is one of the oldest utilities in the South Asian region and caters for the electric power requirements of Karachi. KESC is a Joint stock public limited company, and its shares are quoted at the Karachi, Lahore and Islamabad stock exchanges. It is principally engaged in the generation, transmission and distribution of electricity to industrial and other consumers under the Electricity Act 1910, as amended to date and the NEPRA Act 1997, within its licensed areas.
1.5
NEPRA was established under the Regulation of Generation, Transmission and Distribution of Electric Power Act 1997. The main functions of NEPRA are to grant licenses for generation, transmission and distribution of electric power, prescribe and enforce performance standards for generation, transmission and distribution companies, and determine tariff, rate etc. for the supply of electric power services. Being a regulator, NEPRA is responsible for all matters related to the tariff of electric power in the country.
1.6
The Energy Wing was created in 1988 under the Ministry of Planning & Development to undertake technical, financial and economic appraisal of generation, transmission and distribution projects submitted by WAPDA, KESC etc. The Energy Wing also prepares short and long-term energy sector programmes, including forecast on supply and demand of utilities.
1.7
The Provinces/AJK also administer the investment for power projects and act as main drivers in this regard. Details of certain provincial institutions and departments engaged in the power sector are given as under. 1.7.1 Sarhad Hydel Development Organization (SHYDO) In 1986, the Government of NWFP established SHYDO for carrying out hydropower prospects, hydropower development and to act as a utility company for the isolated rural
11
communities. The organization is under the administrative control of Irrigation & Power Department of Provincial Government and is governed by the Board of Directors. With the assistance of WAPDA and GTZ, SHYDO has prepared a Master Plan for the development of hydropower potential in NWFP. Accordingly, the Regional Power Development Plan was completed with pertinent technical and financial data of different hydel sites in NWFP. SHYDO has identified hydel potential of more than 6000 MW and has completed feasibility studies of several hydel projects ranging from 8 MW to 125 MW. Presently, SHYDO is implementing 81 MW Malkand-III Hydropower Project. 1.7.2 Punjab Power Development Board (PPDB) PPDB was created in Punjabs Irrigation Department in 1995 for the promotion of hydel power generation through the development of hydel power stations on canal sites in Punjab. At different canals, about 324 potential sites of medium and low head were identified, with a total estimated capacity of 5895 MW. 1.7.3 Irrigation Power Department Sindh (IPDS) IPDS is responsible for the hydel development and identification of different hydel sites on canals and barrages in the Sindh. It prepares, inter alia, policies, plans, schemes for development of hydel power generation in the Province. 1.7.4 AJK Hydro Electric Board (AJK HEB) and AJK Private Power Cell (AJK PPC) In order to exploit the plentiful hydel resources of AJK, the Government of AJK established the AJK HEB in 1989. Public sector projects are implemented by AJK HEB, the AJK HEB successfully completed the 1.6 MW Kathai, 2 MW Kundel Shahi, 2 MW Leepa and 30.4 MW Jagran hydel power projects. Subsequently, with the intention of providing a onewindow facility and to encourage the development of hydel potential in the private sector, the GOAJK created the AJK Private Power Cell in 1995. The first private sector project namely, 1 MW Jari Kas Hydropoower Project has been recently brought into operation. Besides, two other projects 79 MW New Bong Escape Hydropower Project on upper Jhelum canal and 132 MW Rajdhani Hydropower Project on Poonch River are at various stages of implementation. 1.7.5 Northern Areas Public Works Department (NAPWD) In order to provide electric power to the isolated network of the Northern Areas, the NAPWD was established, which is responsible for the generation and distribution of electricity. NAPWD has constructed various mini hydel power stations in the region, and has built 11 KV lines for the transmission of electric power to consumers. Currently, approximately 40 % of the local population of Northern Area has been provided electricity. The addresses of the above institutions are at Appendix-II.
12
Blank
CHAPTER
Pakistan is endowed with a hydel potential of approximately 41722 MW, most of which lies in the North West Frontier Province, Northern Areas, Azad Jammu and Kashmir and Punjab. However, an abundant hydel potential is still untapped which needs to be harnessed. The total installed capacity of the hydropower stations in the country is about 6595 MW, out of which 3767 MW is in NWFP, 1698 MW in Punjab, 1036 MW in AJK and 93 MW in the Northern Areas. Table-2-1 depicts a comparative summary of the hydel projects in various stages of implementation in various regions of Pakistan. Table-2-2 shows a list of existing hydropower plants ranging from 1 MW to 3478 MW, while Figure-2-1 shows the graphical representation of Province/ area wise hydel power generation in Pakistan. On the basis of data available in PPIB and information obtained from various organizations, details of the projects of the following categories in the aforesaid regions of the country are given in the proceeding chapters. Projects in Operation Projects under implementation in the public sector Projects under implementation in the private sector Projects with Feasibility Study completed Projects with Pre-Feasibility Study completed / Raw Sites
15
Table-2-1 COMPARATIVE SUMMARY OF THE HYDEL PROJECTS IN VARIOUS STAGES OF IMPLEMENTATION IN VARIOUS REGIONS OF PAKISTAN Name of Province Projects Public in sector Operation Projects (MW) (MW) 3767.2 1698 1036.1 93.732 Nil Nil 6595.032 635 96 973.8 18 Nil Nil 1722.8 Private sector Projects (MW) 84 Nil 828.7 Nil Nil Nil 912.7 Projects with Projects with Feasibility Study Pre-Feasibility Study/ (MW) Raw Sites (MW) Above Below Above Below 50 MW 50 MW 50 MW 50 MW 58 143 13584 426 3720 32.17 NIL 349.65 420 48.2 1152 177 505 71.5 10905 814 Nil 49.5 80 48.55 Nil 0.5 Nil Nil 4703 344.87 25721 1815.2
Table-2-2 EXISTING HYDEL POWER STATIONS IN PAKISTAN S.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Name of Project Tarbela Ghazi Barotha Mangla Warsak Chashma Malakand Dargai Rasul Shadiwal Chichoki Malian Nandipur Kurram Gari Reshun Renala Chitral Jagran-I Kathai Kundel Shahi Leepa Northern Area Small / Micro Hydel Stations TOTAL Installed Capacity (MW) 3478 1450 1000 240 184 19.6 20 22 13.5 13.2 13.8 4 2.8 1.1 1 30.4 1.6 2 1.6 94 3 6595.032
16
Figure 2-1
NWFP, 3767.2
PUNJAB, 1698
17
Blank
Blank
CHAPTER
21
TABLE-3.1 PROJECTS IN OPERATION IN NWFP S. No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Name of Power Station Tarbela Warsak Dargai Power Station Kurram Garhi Malakand Power Station Reshun Shishi Garam Chashma Kalam Ashuran Karora Damori Thall Kaghan Duber Keyal Jalkot Location Tarbela (Reservoir) Warsak (Reservoir) Swat River Kurram Garhi (canal) Swat River Chitral Lower Chitral Chitral Swat Swat Shangla Shangla Dir Mansehra Kohistan Kohistan Kohistan Total Capacity (MW) 3478 240 20 4 20 2.8 0.30 0.10 0.2 0.4 0.2 0.1 0.4 0.2 0.15 0.2 0.15 3767.2 Status C C C C C C C C LO LO PLO LO PLO PLO PLO PLO PLO
22
23
TABLE-3.2 PROJECTS IMPLEMETATION BY PUBLIC SECTOR S. No 1 2 3 4 5 6 Name of Project Malakand-III Allai Khwar Duber Khwar Golen Gol Khan Khwar Kayal Khwar Total River/Location Swat River Malakand Agency Indus River Distt.Mansehra Indus River Distt. Kohistan Golen/Mastuj Distt Chitral Indus River Distt Kohistan Swat River near Bahrain Capacity (MW) 81 121 130 106 72 125 635 Status A B B B B C
A. Project under construction by SHYDO, GONWFP. B. Project approved by ECNEC for implementation by WAPDA. C. It is yet to be decided as to whether the project will be implemented by WAPDA or SHYDO
TABLE-3.3 PROJECTS UNDER IMPLEMETATION BY PRIVATE SECTOR S. No 1 Name of Project Matiltan River/Location Ushu River, District Swat Capacity (MW) 84 Status Tariff negotiations with WAPDA not yet finalized.
Total
84
24
25
TABLE-3.4 RAW SITES INDENTIFIED IN NWFP (ABOVE 50 MW) S. No 1* 2 3 4 5** 6*** 7 8 9 10 11 12 13**** 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28**** 29 30 31 Project Name Dasu Chor nullah system Patan High Thakot Terbala 4th extension Munda Dam Kunar river (2nd stage Suki Kinari) Spat Gah (Middle) Kandiah (Kaigh Scheme) Spat Gah (Lower) Kandiah (Karang Scheme) Swat Scheme B1 (Kedam) Gahriat-Swir Lasht Korag-Parait Kunar river (ist stage naran) Spat Gah(Upper) Madyan Swat Scheme C Laspur-Muri Gram Patrind Shogo-Sin Sharmi Mirkani-Khazana Gabral-Kalam Swat Scheme A1 (Kalam) Neckherdim-Paur Uchhatur-Andakht Loo Nissar-Lawi Istaru-Buni Koto Mujigram-Shogo Total Location Indus river Dist. Kohistan Indus river Indus river Indus river Swat river Dist. Mansehra Dassu Kohistan Dassu Kohistan Kalam, Swat River Chitral Chitral Dist. Mansehra Dassu Swat river Kalam, Swat River Chitral Kunhar Chitral Dist. Dir Panjkura Dir Swat River Kalam, Swat River Chitral Chitral Chitral Chitral Dist. Dir Chitral Capacity (MW) 2712.00 1500.00 1172.00 1043.00 960.00 740.00 652.00 550.00 548.00 500.00 454.00 410.00 334.00 223.00 219.00 200.00 150.00 147.00 133.00 133.00 127.00 115.00 110.00 105.00 101.00 80.00 79.00 65.00 52.00 52.00 51.00 13584.00
* ** *** ****
Carrying out a detailed feasibility study has been approved in Public Sector. Project will be implemented in Public Sector. Project is being processed in PPIB for implementation in the Private Sector. WAPDA has submitted PC-II for carrying out detailed feasibility study for processing of approval.
26
27
TABLE-3.5 RAW SITES INDENTIFIED IN NWFP (BELOW 50 MW) S. No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Project Name DongaiGah Tirich Gol, Alt 3A Machi Branch Arkari Gol (Alt 2) Tirich Gol, Alt 1 A Arkari Gol (Alt 1) Tirich Gol, Alt 2 A Damtour Bimbal Serai, Karora Y.I.A Golen Chokel Khwar Barum Gol Turkho River, Alt 2 Turkho River, Alt 1 Baral Darra Mastuj River 2 Bhimbal Jabori Karora Rish Gol, Alt 2 Karora New Kedam Khwar Lutkho River Rish Gol, Alt 1 Ushiri Balkanai Gande Gar Ayun Garbral River Khghan (Alt 1) Dadar Gandegah Laspur River Bela Owir Gol Naran Location Spat-Indus River Upper Chitral Mardan Lower Chitral Upper Chitral Lower Chitral Upper Chitral Dor/hazara Mansehra Indus Swat / Mansehra West Lower Chitral Swat River near Bahrain Upper Chitral Upper Chitral Upper Chitral Swat Valley (Garni) Upper Chitral Dist. Mansehra Dist. Mansehra Basham Upper Chitral Indus Swat / Mansehra West Kedam Khwar-Swat Lower Chitral Upper Chitral Ushiri River Dir Indus Swat / Mansehra West Dir Distt. (Ushri Khwar) Lower Chitral Swat Valley (Kalam) Kaghan Valley Siran/Hazara Panjkoora River Dir Upper Chitral Dir Distt (Ghaldai sin) Upper Chitral Kaghan Valley Capacity (MW) 32.00 29.70 28.00 26.40 25.70 24.00 22.60 15.00 14.00 13.50 11.30 10.50 10.00 9.90 9.40 9.00 8.90 8.10 8.00 8.00 7.70 7.50 7.00 6.40 6.20 6.00 5.30 5.20 5.06 4.75 4.10 4.00 4.00 3.25 2.95 2.90 2.80
28
38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78
Jashil Gah, G1 Ritch Gol Khelian Khwar Chaudwan Swat River Kaghozi Gol (Alt 2) Bhimbal Kaghozi Gol (Alt 1) Kao Gol, Alt 1 Bumburet Biar Ushiri (Alt 1) Murdan Bangroan Khwar, Barigo Alt 2 Jashil Gah, Badakk Thal Kaghan (Alt 2) Soyal Khwar (Alt 2) Patrak Chitral Chakosh Gol, Alt 1 Harban Gah, Harban Ushiri (Alt 2) Chokel Khwawar Rehmat Shah Sind Lower Thal Anakar gol Dongai Gah, Jalkot Nallah Kapar Banda Gah Seo Khwar Sheringal Soyal Khwar (Alt 1) Kumrat Birzin Dir Alt No.1 Dardabahm Gol, Alt 3 Baraul Bandai Kolandai Sundraul Dir Alt. No.2 Booni Total
Indus Kohistan Upper Chitral Indus Kohistan Chaudwan/DI Khan Swat Valley (Asrit) Lower Chitral Kaghan Valley Lower Chitral Upper Chitral Lower Chitral Dir Distt (Panjkora River) Dir Distt (Ushiri Khwar) Lower Chitral Indus Kohistan Indus Kohistan Dir Distt (Kumnrat Sin) Kaghan Valley Indus Kohistan Dir Distt (Ghaldai sin) Chitral Upper Chitral Indus Kohistan Dir Distt (Uushri Khwar) Swat Valley (Ghundoputai) Swat Valley (Garral) Dir Distt (Ghaldai sin) Swat Valley (Anaker) Indus Kohistan Indus Kohistan Indus Kohistan Dir Distt. (Dok Darra Khwar) Indus Kohistan Dir Distt. (Kumrat Sin) Lower Chitral Dir Distt. (Dir Khwar) Upper Chitral Dir Distt. (Shingara Khwar) Dir Distt. (Dir Khwar) Dir Distt. (Landai Khwar) Dir Distt. (Dir Khwar) Chitral
2.77 2.75 2.60 2.50 2.40 2.27 2.25 1.98 1.90 1.80 1.72 1.65 1.60 1.48 1.39 1.35 1.28 1.14 1.09 1.00 0.93 0.90 0.90 0.89 0.86 0.80 0.76 0.76 0.74 0.71 0.71 0.66 0.59 0.50 0.45 0.40 0.24 0.24 0.21 0.12 0.02 426.41
29
30
TABLE-3.6 SOLICITED SITES INDENTIFIED IN NWFP (ABOVE 50 MW) S. No 1 Project Name Kurram Tangi dam Location Kurram North, Wazirstan Agency Total Capacity (MW) 58 58
SOLICITED SITES INDENTIFIED IN NWFP (BELOW 50 MW) S. No 1 2 3 4 5 6 7 Project Name Daral Khwar Summer Gah Ranolia Batal Khwar Pehur Tank Zam Gomal Zam Total Kohistan Kohistan Kohistan Swat Swabi Tank Zam/ DI Khan Gomal/Waziristan Location Capacity (MW) 35 28 12 8 18 25.5 17.4 143.90
31
Figure 3.5 PROJECTS ABOVE & LESS THAN 50 MW (SOLICITED SITES) IN NWFP
32
Blank
CHAPTER
35
TABLE-4.1 PROJECTS IN OPERATION S. No 1 2 3 4 5 6 7 Project Name Ghazi Barotha Rasul Shadiwal Nandipur Chichoki Hydel Renala Chashma Total CCommissioned Location Ghazi Barotha, Disst. Attock Rasul Distt. Mandi Bahuddin Shadiwal near Gujrat Nandipur near Gujranwala Upper Chenab Canal, Renala-Khurd,-Distt. Okara Chashma Capacity (MW) 1450 22 14 14 13 1 184 1698 Status C C C C C C C
TABLE-4.2 PROJECTS UNDER IMPLEMENTATION BY PUBLIC SECTOR S. No 1 Project Name Jinnah Total Location Jinnah Barrage Capacity (MW) 96 96 Status B
36
37
TABLE-4.3 RAW SITES IDENTIFIED IN PUNJAB (BELOW 50 MW) S. No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Project Name Indus/Chasma Indus/Chasma Indus/Chasma Indus/Chasma Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Jinnah Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Location Chasma Jhelum Link Canal Chasma Jhelum Link Canal Chasma Right Bank Canal Chasma Right Bank Canal Thal Canal Thal Canal Thal Canal Thal Canal Thal Canal Thal Canal Thal Main Line Lower Canal Thal Main Line Lower Canal Thal Main Line Lower Canal Thal Main Line Lower Canal Thal Main Line Lower Canal Thal Main Line Lower Canal Thal Main Line Lower Canal Thal Main Line Lower Canal Thal Main Line Lower Canal Thal Main Line Lower Canal Thal Main Line Lower Canal Thal Main Line Lower Canal Thal Main Line Lower Canal Thal Main Line Upper Canal T.P Link Canal T.P Link Canal T.P Link Canal T.P Link Canal Lower Chenab Canal Lower Chenab Canal Lower Chenab Canal Lower Chenab Canal Lower Chenab Canal Lower Chenab Canal DISTANCE RD (Feet) 0+000 34+387 98+000 188+000 0+000 22+000 0+000 87+200 0+000 29+000 0+000 27+000 68+500 131+000 172+000 212+500 237+000 261+500 304+000 317+500 373+000 419+000 448+500 2+300 60+000 131+500 182+000 184+500 0+000 36+670 54+4086 75+011 0+000 40+200 Capacity (MW) 13.85 0.806 0.261 0.784 0.091 0.053 0.143 0.071 0.246 0.298 1.418 1.165 0.845 0.786 0.758 0.482 1.115 0.722 0.453 0.953 0.853 0.363 0.342 0.835 4.235 4.042 6.157 3.789 0.0768 0.0155 0.0308 0.028 4.9538 1.6498
38
S. No 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
Project Name Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki
Location Lower Chenab Canal Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch
DISTANCE RD (Feet) 76+380 0 47+900 0+000 77+000 101+400 109+500 145+450 163+333 181+050 204+987 229+200 249+000 282+700 296+100 320+189 322+000 322+492 410+200 439+300 448+530 449+719 0+000 27+000 65+000 103+927 120+000 171+000 218+000 265+000 269+000 294+300 324+000 0+000 21+900 54+879
Capacity (MW) 1.9399 0.1737 0.2076 0.2828 0.2855 0.2982 0.1104 0.0436 0.7275 0.0212 0.2732 0.0966 0.0875 0.0458 0.0476 0.0558 0.0429 0.0687 0.1173 0.0347 0.0665 0.0276 0.356 0.59 0.374 0.238 0.257 0.189 0.654 0.125 0.217 0.045 0.13 1.327 0.232 0.128
39
Project Name Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Khanki Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala
Location Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Upper Gogera Branch Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) Lower Chenab Canal (Lower) B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal
DISTANCE RD (Feet) 101+400 214+000 219+000 251+000 0+000 37+025 68+830 178+250 184+612 216+852 260+000 277+500 140+050 161+287 182+950 0+000 25+020 38+585 49+898 61+288 86+105 137+073 170+500 192+936 229+520 246+080 0 +000 68+600 91+400 337+144 400+000 433+958 465+300 481+760 509+712 513+550
Capacity (MW) 0.269 1.695 0.888 0.481 0.872 1.328 0.828 0.325 0.0249 0.689 0.401 0.285 0.209 0.816 0.524 0.262 0.174 0.429 0.116 0.067 0.166 0.316 0.242 0.114 0.057 0.07 1.981 0.536 0.559 0.224 0.587 0.926 0.705 1.1208 3.1414 0.3894
40
S. No 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136
Project Name Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Panjnad Chenab/Panjnad Chenab/Panjnad Chenab/Panjnad Chenab/Panjnad Chenab/Panjnad Chenab/Panjnad Chenab/Qadirabad Chenab/Qadirabad Chenab/Qadirabad Chenab/Qadirabad Chenab/Qadirabad Chenab/Qadirabad
Location B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal Chenab / Upper Chenab Canal Chenab / Upper Chenab Canal (Lower) Chenab / Upper Chenab Canal (Lower) Chenab / Upper Chenab Canal (Lower) Chenab / Upper Chenab Canal (Lower) Chenab / Upper Chenab Canal (Lower) Chenab / Upper Chenab Canal (Lower) Chenab / Upper Chenab Canal (Lower) Abbasian Canal Panjnad Canal Panjnad Canal Panjnad Canal Panjnad Canal Panjnad Canal Panjnad Canal Lower Chenab Canal Feeder Qadirabad Balloki Link Canal Qadirabad Balloki Link Canal Qadirabad Balloki Link Canal Qadirabad Balloki Link Canal Qadirabad Balloki Link Canal
DISTANCE RD (Feet) 271+000 304+000 375+000 445+000 218+500 240+250 265+128 281+000 304+000 0+000 0+000 128+000 164+400 221+000 225+508 266+000 283+100 0+000 0+000 150+000 203+966 229+000 0+000 62+486 0+000 0+000 81+274 182+102 271+665 304+985
Capacity (MW) 0.344 0.33 0.213 0.0912 0.187 0.92 0.065 0.064 0.022 4.789 10.52 4.679 3.455 5.975 2.761 1.153 4.671 4.671 6.309 1.952 0.517 1.307 0.353 0.223 2.143 2.1432 2.116 0.639 3.602 4.107
41
S. No 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172
Project Name Chenab/Qadirabad Chenab/Trimmu Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Mangla Jhelum/Rasul Jhelum/Rasul Jhelum/Rasul Jhelum/Rasul Jhelum/Rasul Jhelum/Rasul Jhelum/Rasul Jhelum/Rasul Jhelum/Rasul Jhelum/Rasul Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki
Location Qadirabad Balloki Link Canal Trimmu-Sidhuni Link Canal Gujrat Branch Canal Gujrat Branch Canal Gujrat Branch Canal Gujrat Branch Canal Gujrat Branch Canal Gujrat Branch Canal Gujrat Branch Canal Gujrat Branch Canal Gujrat Branch Canal Upper Jhelum Canal Upper Jhelum Canal Upper Jhelum Canal Upper Jhelum Canal Upper Jhelum Canal Upper Jhelum Canal Upper Jhelum Canal Upper Jhelum Canal Upper Jhelum Canal Lower Jhelum Canal Lower Jhelum Canal Lower Jhelum Canal Lower Jhelum Canal Lower Jhelum Canal Lower Jhelum Canal Lower Jhelum Canal Feeder Lower Jhelum Canal Feeder Rasul Qadirabad Link Rasul Qadirabad Link B.S.Link I B.S.Link I B.S. Main Link B.S. Link I Lower Bari Doab Canal Lower Bari Doab Canal
DISTANCE RD (Feet) 379+265 0+019 0+600 1+350 2+000 21+000 35+065 63+000 75+000 113+000 142+500 27+500 34+750 36+860 63+000 78+695 89+149 107+000 225+080 348+000 223+350 276+850 317+800 0+000 53+300 83+900 0+000 8+626 0+000 145+255 0+000 73+201 0+000 1+410 0+000 27+173
Capacity (MW) 1.111 2.222 0.666 0.677 0.407 0.309 0.205 0.152 0.152 0.87 0.017 2.125 2.5 2.43 1.845 0.662 1.086 1.509 1.443 1.117 0.234 0.714 0.014 0.209 0.148 0.17 1.23 1.0727 2.602 2.117 1.114 1.086 3.178 0.059 1.095 0.758
42
S. No 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208
Project Name Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Balloki Ravi/ Sidhuni Ravi/ Sidhuni Ravi/ Sidhuni Ravi/ Sidhuni Ravi/ Sidhuni Ravi/ Sidhuni Ravi/ Sidhuni Ravi/ Sidhuni Ravi/ Sidhuni Ravi/ Sidhuni Ravi/ Sidhuni Ravi/ Sidhuni Ravi/ Sidhuni Ravi/ Sidhuni Sutlej/Islam Sutlej/Islam Sutlej/Islam
Location Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal Lower Bari Doab Canal S.M.B Link Sidhnai Canal Sidhnai Canal Sidhnai Canal Sidhnai Canal Sidhnai Canal Sidhnai Canal Sidhnai Canal Sidhnai Canal Sidhnai Canal Sidhnai Canal Sidhnai Canal Sidhnai Canal Sidhnai Canal Bahawal Canal Upper Bahawal Canal Upper Bahawal Canal Upper
DISTANCE RD (Feet) 62+713 108+954 196+954 227+454 258+654 285+454 329+058 340+850 391+454 430+500 450+500 461+550 493+890 527+216 542+168 571+200 589+000 601+200 640+200 0+014 0+000 19+500 41+000 54+100 62+000 163+800 197+755 0+000 44+077 61+077 78+050 117+117 140+000 0+000 43+500 81+000
Capacity (MW) 0.604 1.118 1.374 2.781 3.149 2.634 3.514 0.311 0.978 0.241 1.185 2.082 0.318 1.2 0.147 0.342 1.074 0.34 1.076 4.479 0.159 0.374 0.51 0.323 0.542 0.201 0.293 0.46 0.28 0.126 0.259 0.209 0.171 0.965 1.554 1.468
43
S. No 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244
Project Name Sutlej/Islam Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala
Location Bahawal Canal Upper Eastern Saddiqia Canal Eastern Saddiqia Canal Eastern Saddiqia Canal Eastern Saddiqia Canal Eastern Saddiqia Canal P.I Link P.I.Link Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Pak Pattan Canal Marala Ravi Link Canal Marala Ravi Link Canal Marala Ravi Link Canal Marala Ravi Link Canal Marala Ravi Link Canal Marala Ravi Link Canal Marala Ravi Link Canal
DISTANCE RD (Feet) 86+100 0+000 0+000 22+900 38+900 95+900 0+000 113+600 0+000 52+000 112+350 124+950 191+642 218+272 241+500 266+400 304+340 322+843 353+726 354+172 406+828 469+310 476+730 498+872 548+310 406+828 607+000 631+000 647+000 0+000 220+122 237+230 249+850 265+998 302+496 313+500
Capacity (MW) 0.74 0.981 0.505 0.191 0.199 0.232 0.357 0.116 1.287 0.923 4.347 0.561 0.689 0.226 0.205 0.289 0.935 0.388 0.389 0.536 0.483 0.092 0.456 0.156 0.082 0.107 0.152 0.028 0.039 0.612 2.046 6.854 10.519 13.661 7.105 14.396
44
S. No 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280
Project Name Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Marala Chenab/Trimmu Chenab/Trimmu Chenab/Trimmu Chenab/Trimmu Chenab/Trimmu Chenab/Trimmu Chenab/Trimmu Chenab/Trimmu Chenab/Trimmu Chenab/Trimmu Chenab/Trimmu Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Indus/Taunsa Jhelum/Rasul Jhelum/Rasul Jhelum/Rasul
Location B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal B.R.B.D Link Canal Haveli Canal Rangpur Canal Rangpur Canal Rangpur Canal Rangpur Canal Rangpur Canal Rangpur Canal Rangpur Canal Rangpur Canal Rangpur Canal Rangpur Canal D.G. Khan Canal D.G. Khan Canal D.G. Khan Canal D.G. Khan Canal D.G. Khan Canal D.G. Khan Canal D.G. Khan Canal D.G. Khan Canal D.G. Khan Canal Muzaffargrah Canal Muzaffargrah Canal Muzaffargrah Canal Muzaffargrah Canal Muzaffargrah Canal Muzaffargrah Canal Muzaffargrah Canal Muzaffargrah Canal Muzaffargrah Canal Lower Jhelum Canal Lower Jhelum Canal Lower Jhelum Canal
DISTANCE RD (Feet) 0+000 92+000 113+412 157+390 0+000 0+000 49+000 70+000 100+500 138+180 170+000 189+500 218+000 249+500 281+500 0+000 0+000 3+500 8+000 14+000 23+000 58+078 168+600 142+100 0+000 164+357 127+300 147+500 177+093 206+700 246+800 290+300 329+112 0+000 11+790 22+000
Capacity (MW) 0.302 1.8 1.833 0.676 2.448 0.767 0.375 0.352 0.562 0.395 0.360 0.196 0.284 0.240 0.258 1.083 1.076 2.268 2.272 2.062 1.23 0.605 0.423 0.3 1.166 1.293 1.699 0.954 0.326 0.417 0.753 0.629 0.671 0.281 0.159 0.398
45
S. No 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306
Project Name Jhelum/Rasul Jhelum/Rasul Jhelum/Rasul Jhelum/Rasul Ravi/Balloki Ravi/Balloki Ravi/Balloki Ravi/Balloki Ravi/Balloki Ravi/Balloki Ravi/Balloki Ravi/Balloki Ravi/Balloki Sutlej/Islam Sutlej/Islam Sutlej/Islam Sutlej/Islam Sutlej/Islam Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki Sutlej/Sulemanki TOTAL
Location Lower Jhelum Canal Lower Jhelum Canal Lower Jhelum Canal Lower Jhelum Canal B.S. Link II B.S. Link II B.S. Link II Depalpur Canal Lower Depalpur Canal Lower Depalpur Canal Lower Depalpur Canal Lower Depalpur Canal Lower Depalpur Canal Lower Mailsi Canal Mailsi Canal Mailsi Canal Qaimpur Canal Qaimpur Canal Fordhwah Canal Pakpattan Canal Pakpattan Canal Pakpattan Canal Pakpattan Canal Pakpattan Canal Pakpattan Canal Pakpattan Canal
DISTANCE RD (Feet) 28+200 49+950 75+500 83+985 0+000 33+430 193+339 0+000 8+430 78+224 85+074 99+979 137+410 0+000 11+500 40+500 0+000 12+635 0+000 57+340 68+170 82+370 114+000 143+000 176+500 201+860 349.6559
Capacity (MW) 0.405 0.295 0.167 0.233 0.573 8.21 0.694 0.409 0.16 0.115 0.136 0.283 0.076 3.143 0.678 0.956 0.017 0.025 0.104 0.250 0.293 0.206 0.364 0.369 0.421 0.404
46
TABLE -4.4 Location Indus River. Distt Mianwali Indus River 3720 SOLICITED SITES IDENTIFIED IN PUNJAB Location Bambanwala Sialkot RD 133298 Deg Fall Sheikhupura RD 283100 Pakpattan RD 112350 LBDC Sahiwal RD 285454 Upper Gugera Canal SKP. RD 214000 Main Line UCC Sheikupura RD 128000 Main Line UCC Sheikupura RD 164400 Sahiwal RD 329058 Capacity MW 6.29 6.29 3.26 2.43 2.34 3.5 3.5 4.56 32.17 (BELOW 50 120 3600 Capacity (MW)
S.No.
Project Name
Kalabagh
Taunsa
Total
S.No.
Project Name
Total
47
48
Figure 4.2 PROJECTS ABOVE & LESS THAN 50 MW (SOLICITED SITES) IN PUNJAB
Blank
CHAPTER
51
52
TABLE -5.1 PROJECTS IN OPERATION Location Jhelum River Jagran River Jagran River Qazi Nag Nullah Jhelum River Naril Nullah Kathi Nullah Neelum River 0.10 0.20 1036.10 0.20 1.60 1.60 2.00 30.40 C C C C C C C 1000.00 C Capacity (MW) Project Status
S. No
Project Name
Mangla
Leepa HEP
Kathai HEP
Keel HEP
Chinari HEP
Pattika/Phittka HEP
Total
53
54
TABLE -5.2 PROJECTS UNDER IMPLEMENTATION BY PUBLIC SECTOR Location Muzaffarabad Punch River, Haveli, Distt, Bagh 973.8 4.80 B 969.00 A Capacity (MW) Status
S. No
Project Name
Neelum Jhelum
Battar
Total
A. Project approved by ECNEC for implementation by WAPDA, construction not yet started. B. Project approved by ECNEC but construction not yet started by AJK HEB, GOAJK.
TABLE -5.3 PROJECTS IN PRIVATE SECTOR Location Mirpur Kotli Muzaffarabad Muzaffarabad Muzaffarabad Mirpur Muzaffarabad Capacity (MW) 79 132 10.2 1.6 600 1 4.9 828.7 Project Status LOS LOS LOS LOS LOI Completed LOI
S. No
Project Name
Rajdhani
Madar Butdara
Riali-I
Kohala
Jari
Riali-II
Total
55
TABLE -5.4. RAW SITES IDENTIFIED IN AJK S.No. 1 2 3 4 5* 6 7 8 Project Name Mahl Karot Azad Patan Chakothi-Seri Kotli Jagran-III Serha Hari-Ghal Total
(ABOVE 50 MW) Capacity (MW) 245.00 240.00 222.00 139.00 97.00 90.00 65.00 54.00 1152.00
56
57
TABLE -5.5 RAW SITES IDENTIFIED IN AJK S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Project Name Gumot Nar Dudainal Luat Shontar Doarian Naghdar Taobat Jana Wai Jing Dakhari Chamm Fall Hotreri Hajira Sharda Samani Riali-I Dghanwan Sarhota Rerah Pothi Kotli Ban Barar Sarswah Patni Total
(BELOW 50 MW) Capacity (MW) 40.00 30.00 24.10 20.00 14.10 11.20 5.00 5.00 3.70 3.20 3.20 2.50 2.40 2.00 1.60 1.60 1.50 1.00 1.00 1.00 1.00 1.00 0.70 0.20 177.00
Location Muzaffarabad Muzaffarabad Muzaffarabad Muzaffarabad Muzaffarabad Muzaffarabad Muzaffarabad Muzaffarabad Muzaffarabad Kotli Muzaffarabad Muzaffarabad Poonch Muzaffarabad Mirpur Muzaffarabad Kotli Kotli Kotli Kotli Kotli Bagh Kotli Bhimber
58
59
TABLE -5.6 SOLICITED SITES IDENTIFIED IN AJK (ABOVE 50 MW) S.No. 1* 2** Project Name Abbasian Gulpur Total Location Muzaffarabad Kotli Capacity (MW) 360.00 60.00 420.00
TABLE -5.6 SOLICITED SITES IDENTIFIED IN AJK (BELOW 50 MW) S.No. E1*** 2 Project Name Jagran-II Shahrian Total Location Muzaffarabad Muzaffarabad Capacity (MW) 45.00 3.20 48.20
* ** ***
The feasibility study previously carried by private sector but found deficient. The feasibility study is being updated by the GOAJK. Pre-liminary report available.
60
61
Blank
Blank
CHAPTER
Northern Region
The Northern Region comprises of Gilgit (River Gilgit, Naltar and its tributaries), Hunza (River Boladas, Hunza and other tributaries), Ishkuma (River Ishkuman and Ghizar and their tributaries), Khunjerab (River Khunjarab, River Kilik and its tributaries) and Yasin (River Yasin, River Gilgit and their tributaries).
Eastern Region
The Eastern Region comprises the Kharmang (River Kharmang and it tributaries), Shyok (River Shyok and it tributaries), Skardu (River Braldu, River Bashu, River Shigar and River Indus) and Rondu/ Haramosh (River Indus and its regional tributaries)
Southern Region
The Southern Region comprises the Chilas (River Indus and its tribuaries) and Astore (River Astore and its tributaries) Numerous promising hydel potential sites have been identified in the Northern Areas, but, due to the absence of high power transmission lines, these sites have not been developed so far. On account of difficult mountainous terrain and the non-availability of high power transmission line system, the Northern Areas are not connected to the National Grid and no projects have been undertaken by private investors. In order to provide electricity to the isolated network of the Northern Areas, the Northern Areas Public Works Department (NAPWD) was established, which is responsible for the generation and distribution of electricity. NAPWD has constructed various mini hydel power stations in the region and has built 11 KV lines for the transmission of power to consumers. Currently, approximately 40 % of the local population has been provided electricity. About 241 potential sites with a total capacity of 12314 MW were identified with high, medium and small head. Out of these, 93 projects are in operation and no project either is under implementation nor being processed/undertaken by the private sector. Mainly, these sites are runof-river , with some as daily storage projects. Table-6.1 indicates the details of the projects in operation with the total capacity of 94 MW, while Figure-6.1 shows the details of these projects. Tables-6.2 shows the list of project under implemention in the public sector. Tables 6.3 & 6.4 illustrate the details of raw site projects above and below 50 MW with the total capacity of 10905 MW and 814 MW respectively, while Figures-6.2 & 6.3 shows the location of these projects. Table6.5 indicates the list of solicited sites of above and below 50 MW with the total capacity of 505 MW and 72 MW respectively, while Figure-6.4 shows the location of these projects.
65
TABLE -6.1 PROJECTS IN OPERATION S.No. Project Name Location Capacity (MW) 10.63 6.96 5.62 5.13 4.85 4.00 3.11 3.00 2.00 2.00 2.00 1.89 Distt Ghizar Chilas, Distt. Diamer Gha, Distt. Ghanche Gha, Dstt. Ghanche Gilgit Astore Chilas Chilas Gilgit Gilgit Hunza Hunza Ishkuman Yasin Gaglot/Gilgit Nagar Valley/Gilgit Hunza/Gilgit Skardu 1.61 1.52 1.50 1.50 1.50 1.38 1.20 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Status
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Gilgit Skardu-I Chilas-I Hunza Shyok Kar Gah Phase VI Astore Kachura Phase II Ghizar Thak Phandar Kharmang Yasin Rondu Bunnar Chilas Dumsum Balagond Ishkuman-I Kar Gah Phase V Parishing/ Lous Darel Phase II Bunner Tangir Kar Gah Phase VII Jalalabad Hassanabad Phase V Hisper Phase I Ishkuman-II Naz Bar Jaglot Phase-II Chalt Khyber-II Shigar
Gilgit Skardu Chilas Hunza Shyok Gilgit Astore Skardu Ghizar Chilas Distt. Ghizar
C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
66
34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
Shirting Skardu Phase III Pion Basho Phase I Tormic Phase I Skardu Phase II Bubind Kar Gah Phase III Kar Gah Phase IV Boladas Phase I Khunjerab Gol Harpo Phase I Harchu Hassanabad Phase II Hassanabad Phase IV Kar Gah Phase I Dainyor Gurikot Kayo Dango Das Manthoka Astore Gulmit Tolti Phase I Khaplu Phase II Kachura Phase I Darel Phase I Hassanabad Phase III Khaibar Phase-I Khaibar Phase-II Parishing/Mushke Rattu Misgar Ghandus Kiris Phase I Thally Phase I
Skardu Skardu Distt. Ghanche/Gha Skardu Rondu Skardu Astore Gilgit Gilgit Hunza Gujrab river Skardu Rondu Astore Hunza Hunza Gilgit Gilgit Astore Skardu Astore Khamang Astore Ishkuman Kharmang Shyok Skardu Chilas Hunza Khunjerab Khunjerab Astore Astore Khunjerab Kharmang Shyok Shyok
1.00 1.00 1.00 0.80 0.80 0.64 0.64 0.60 0.60 0.60 0.59 0.40 0.40 0.40 0.40 0.40 0.32 0.32 0.25 0.24 0.22 0.22 0.22 0.22 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.19 0.19 0.19 0.16 0.16 0.16
C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
67
71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93
Mendi Stak Tangir Phase I Chilas-II Hassanabad Phase-I Hayul Khaplu Phase-I Sumayar Phase I Mehdabad Nomal Pari Jaglot Sai Sher Qila Sermik Phase-I Olding Phase I Thore Minapin Phase-I Naltar Singal Ahmadabad Phase I Ahmadabad Phase II Chalt Phase-I Sosat Total
Rondu Rondu Chilas Chilas Hunza Ishkuman Shyok Hunza Kharmang Gilgit Gilgit Gilgit Gilgit Kharmang Kharmang Chilas Hunza Gilgit Gilgit Hunza Hunza Hunza Yasin
0.16 0.16 0.16 0.16 0.16 0.16 0.13 0.13 0.11 0.11 0.11 0.11 1.11 0.10 0.10 0.10 0.10 0.08 0.08 0.05 0.05 0.04 0.01 93.732
C C C C C C C C C C C C C C C C C C C C C C C
CCommissioned
TABLE -6.2 PROJECTS UNDER IMPLEMENTATION BY PUBLIC SECTOR S.No. Project Name River/Location Capacity (MW) 18 18 Status
Naltar-III Total
Naltar Gah
68
TABLE -6.3 RAW SITES IDENTIFIED IN NORTHERN AREA (ABOVE 50 MW) S.No. 1* 2** 3 4 5 6 7 Project Name Skardu Basha Dam Bunji Yulbo Rakhiot Tangus Altit Total * ** Pre-feasibility study for the project is being carried out in the Public sector Detailed feasibility study for the Project is being carried out in Public Sector Location Shiger river/near Skardu Indus/Chilas Indus river/near Gilgit Indus River Indus river Indus River Hunza River Capacity (MW) 4000 3360 1290 710 670 625 250 10905.00
69
70
71
TABLE -6.4 IDENTIFIED HYDEL POTENTIAL IN NORTHERN AREA (BELOW 50 MW) (RAW SITES) S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Project Name Darel Phase-IV Tangir Phase-III Darel Phase-III Chilas Phase-III Darel Phase-IV Chilas Phase-IV Tangir Phase-IV Doyian Parishing Phase-III Parishing Phase-IV Dichil Bulashbar Chhichi Bubind Phase-II Dango Das Harchu Aspai Alt-II Aspai Alt-I Rama Phase-II Gurikot Rattu Phase-II Gozer/Gulo Amni Jaglot Alt-I Naltar Phase-III Sai Phase-I Naltar Phase-V Nomal Kar Gah Phase-X Naltar Phase-IV Kar Gah Phase-VIII Location Chilas Chilas Chilas Chilas Chilas Chilas Chilas Astore Astore Astore Astore Astore Astore Astore Astore Astore Astore Astore Astore Astore Astore Astore Astore Gilgit Gilgit Gilgit Gilgit Gilgit Gilgit Gilgit Gilgit Capacity (MW) 1.8 3.7 1.5 0.7 1.1 0.6 12.2 362.3 5.5 3.1 4.1 0.5 1.1 1.1 0.5 0.4 0.6 0.33 0.26 0.14 0.15 0.12 0.14 3.9 5.4 10.5 17.3 2.6 1.4 2.2 1.4
72
32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
Sher Qila Phase-II Singal Phase-II Damot Kar Gah Phase-XI Sai Phase-II Hamuchal HPP Kar Gah Phase-IX Henzal HPP Naltar Phase-II Daintar Boldas Phase-II Hassanabad Phase-VI Hispar Phase-II Altit HPP Chalt Phase-III Nasirabad HPP Hassanabad Phase-VII Sumayar Phase-II Minapin Phase-III Baru Ishkuman Asambar Chhantir Gulmiti Gulmiti Alt-I Birgal Gulmiti Alt-II Hasis Hayul (Chatorkhand) Phakor Ghakuch Darmodar-I Nolti (NAPWD) Balti-2 Roshan Alt.2
Gilgit Gilgit Gilgit Gilgit Gilgit Gilgit Gilgit Gilgit Gilgit Hunza Hunza Hunza Hunza Hunza Hunza Hunza Hunza Hunza Hunza Ishkuman Ishkuman Ishkuman Ishkuman Ishkuman Ishkuman Ishkuman Ishkuman Ishkuman Ishkuman Ishkuman Ishkuman Shyok Shyok Ghizar river Ghizar river
1.02 1.4 0.7 3.9 0.97 14 1.7 15 0.75 4.2 2.9 1.8 2.6 36 0.51 15.3 0.4 0.38 0.23 7.6 1.8 1.3 9.6 1.6 1.3 0.8 0.5 0.4 0.3 0.21 0.13 1.8 3.7 1.4 1.1
73
67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101
Dahimal Naz Bar Darmodar-2 Sosat Gupis Roshan Alt.1 Darmodar (HEPO) Balti-1 Muduli Skardu Phase-IV, Alt.II Basho Phase-II Skardu Phase-IV, Alt.I Basho Phase-III Kachura Phase-V Hashopi Phase-II Shigar Phase-III Narh Niaslo Ghoro Hoh Doko Kiris Alt.2- Phase-II Mngio HPP Thagas Kustang Daltar HPP Brodas Mian HPP Tormic Phase-II Harpo Phase-II Talu Gainji Sermik Phase-II Sermik Phase-III Tolti
Shyok Shyok Shyok Ghizar river Ghizar river Ghizar river Shyok Ghizar river Shyok Skardu Skardu Skardu Skardu Skardu Skardu Skardu Skardu Skardu Skardu Skardu Skardu Shyok Shyok Shyok Shyok Shyok Shyok Shyok Rondu/Haramosh Rondu/Haramosh Rondu/Haramosh Rondu/Haramosh Kharmang Kharmang Kharmang
3.1 1.3 1.1 0.49 0.51 0.61 0.6 0.44 0.32 9.4 3.2 4.8 4.3 18 0.64 0.82 0.41 0.34 0.44 0.39 0.13 0.57 0.44 0.57 0.57 0.74 0.79 0.31 15.3 14.9 8.6 2.4 2.1 2 1.7
74
102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136
Rumboka Manthoka (Upgrade) Shirting Phase-II Gavis Gidiaksdo Olding Phase-II Sermik Phase-III Mehdiabad Shushkati Derdi Kilik Lupghari Khaiber Phase-II Abgarch Phandar-Chhashi Alt-II Phandar-Chhashi Alt-I Masholan Gol Bahach Handrap HPP Chumar Khan Phase-I Bahushtaro Gol Serbal Gol Chumar Khan Phase-II Zhojat Gol Phultukish Karapchu Thali Alt-I Thali Alt-ii Thang Nero Phase-II Buniyal Burzil Alt-II Burzil Alt-I Nero Phase-I Franshat Rathok Total
Kharmang Kharmang Kharmang Kharmang Kharmang Kharmang Kharmang Kharmang Khunjerab Khunjerab Khunjerab Khunjerab Khunjerab Khunjerab Ghizar Ghizar Ghizar Ghizar Ghizar Ghizar Ghizar Ghizar Ghizar Gultari& Minimarg Gultari& Minimarg Gultari& Minimarg Gultari& Minimarg Gultari& Minimarg Gultari& Minimarg Gultari& Minimarg Gultari& Minimarg Gultari& Minimarg Gultari& Minimarg Gultari& Minimarg Gultari& Minimarg
1.6 0.75 0.63 0.68 0.75 0.4 0.91 0.46 0.69 0.85 0.37 0.63 0.17 0.14 12.2 12.1 11.4 2.7 0.94 0.99 0.51 0.37 0.46 0.99 0.99 34 38.9 0.56 0.41 0.32 0.39 0.14 0.17 0.15 0.16 814.15
75
76
TABLE -6.5 SOLICITED SITES IDENTIFIED IN NORTHERN AREA (ABOVE 50 MW) S.No. 1 2 Project Name Doyian Phandar Total Location Astore River Ghizar River Capacity (MW) 425 80 505
TABLE -6.5 SOLICITED SITES IDENTIFIED IN NORTHERN AREA (BELOW 50 MW) S.No. S 1 2 3 Project Name Harpo Phase II Bashu Sai Phase I Total Location Harpo Lungma Ishkuman River Gilgit River Capacity (MW) 33.00 28.00 10.50 71.50
77
78
Figure 6.4 PROJECTS ABOVE & BELOW 50 MW (SOLICATED SITES) IN NORTHERN AREA
Blank
CHAPTER
81
TABLE -7.1 RAW SITES IDENTIFIED IN SINDH (ABOVE 50 MW) S.No. 1 Project Name Nai Gaj Fall Total TABLE -7.1 RAW SITES IDENTIFIED IN SINDH (BELOW 50 MW) S.No. 1 2 3 Project Name Sukkur Sukkur Sukkur Total Location Indus/Nara canal Indus/Nara canal Indus/Nara canal Capacity (MW) 22.51 18.15 7.89 48.55 Location Gaj river in Kisthar mountain range Capacity (MW) 80 80.00
TABLE -7.2 SOLICITED SITES IDENTIFIED IN SINDH (BELOW 50 MW) S.No. 1 2 Project Name Guddu barrage Rohri Total Location Guddu barrage Rohri canal RD 15+000 Capacity (MW) 33.5 16 49.5
82
83
Blank
Blank
CHAPTER
87
88
Blank
CHAPTER
9.2
9.2.1
In March 1994, the GOP announced the POLICY FRAMEWORK AND PACKAGE OF INCENTIVES FOR PRIVATE SECTOR POWER GENERATION PROJECTS IN PAKISTAN. This Policy attracted an enthusiastic response, mainly in thermal power plants, and resulted in direct foreign investment of US $ 4 billion.
91
9.2.2
In May 1995, the GOP announced the POLICY FRAMEWORK AND PACKAGE OF INCENTIVES FOR PRIVATE SECTOR HYDEL POWER GENERATION PROJECTS IN PAKISTAN, with an emphasis on promotion of hydel power generation. Like the 1994 Power Policy, the Hydeil Policy 1995 also elicited an encouraging response. Forty one Letters of Interest and thirteen Letters of Support were issued under its provisions. 9.2.3 1998 Power Policy
In July 1998, the GOP announced its POLICY FOR NEW PRIVATE INDEPENDENT POWER PROJECTS. This Policy was based on the concept of minimum levelized tariff through International Competitive Bidding. However, the response from the private sector was not encouraging. 9.2.4 2002 Power Policy
In October 2002, the GOP announced its POLICY FOR POWER GENERATION PROJECTS YEAR 2002. The Policy 2002 envisages implementation of both solicited and unsolicited proposals. Response to the Policy 2002 is encouraging and twenty three (23) proposals have been received so far, out of which five (5) are for the hydel projects with an estimated capacity of 1074 MW. The salient features of the Policy for Power Generation Projects 2002 that has been devised to accelerate the development of generation capacity through Private Sector resource mobilization are as follows: General / Administrative: The basis for selection of private power project is a minimum levelized tariff Detailed feasibility studies for a particular site-specific hydel or indigenous coal based projects to be prepared before bids were invited Hydel projects to be implemented on a Built-Operate-Transfer (BOOT) or BOO model and thermal projects on a Build-Own-Operate (BOO) basis The GOP guaranteed the terms of executed agreements, including payment terms Companies to be operated according to the applicable laws of Pakistan Institutional arrangements/roles arranged for the implementation of the Policy Implementation of projects through both solicited and unsolicited proposals For hydel and indigenous fuels and renewable projects, unsolicited proposals to be permitted from sponsors in the absence of feasibility studies for the projects Availability of standardized security agreements For Solicited proposal tariff will be determined through ICB and for proposals on raw sites
92
tariff will be determined through negotiations For indigenous coal and gas based projects, integrated power generation proposals can be furnished One-window facility will be provided at federal level by PPIB for all projects above 50 MW capacity However, provinces can manage the investment for projects upto 50 MW capacity. For projects above 50 MW, the provinces would be the main drivers and catalysts for marketing and coordinating projects with PPIB Financial Regime:
Permission for power generation companies to issue corporate registered bonds. Permission to issue shares at discounted prices to enable venture capitalists to be provided higher rates of return proportionate to the risk. Permission for foreign banks to underwrite the issue of shares and bonds by the private power companies to the extent allowed under the laws of Pakistan. Non-residents are allowed to purchase securities issued by Pakistani companies without the State Bank of Pakistan's permissions and subject to the prescribed rules and regulations. Abolition of 5% limit on investment of equity in associated undertakings. Independent rating agencies are operating in Pakistan to facilitate investors in making informed decisions about the risk and profitability of the project companys Bonds/TFCs. Fiscal Regime
Customs duty at the rate of 5% on the import of plant and equipment not manufactured locally. No levy of sales tax on such plant, machinery and equipment, as the same will be used in production of taxable electricity. Exemption from income tax including turnover tax and withholding tax on imports; provided that no exemption from these taxes will be available in the case of oil-fired power projects. Exemption from Provincial and local taxes and duties. Repatriation of equity along with dividends is freely allowed, subject to the prescribed rules and regulations. Parties may raise local and foreign finance in accordance with regulations applicable to industry in general. GOP approval may be required in accordance with such regulations Maximum indigenization shall be promoted in accordance with GOP policy. Non-Muslims and Non-residents shall be exempted from payment of Zakat on dividends paid by the company.
Transfer of Complex: The ownership of hydel projects would be transferred to the GOP at the end of concession period
93
Hydrological Risk: For projects with a capacity above 50 MW power purchaser will bear the risk of availability of water Environmental Guidelines Environmental guidelines have to be met as per the requirements of the Pakistan Environmental Protection Agency (PEPA) Act 1997, Security Package (Standard Agreements) The security package (standard agreements) for projects above 50 MW provides the following salient features:(a) Model (standard) Implementation Agreement, Power purchase Agreement and Water Use License have been prepared for private/public-private partnership power projects to eliminate the need for protracted negotiations and are available upfront to any investor who wishes to invest in Power Sector in Pakistan. (b) The GOP will: (i) Guarantee the contractual obligations of its entities, namely WAPDA/KESC, etc. and Provincial/AJK governments even though some or all of the utilities may be privatized during the term of various agreements. Provide protection against specified "political" risks.
(ii)
Provide protection against changes in the taxes and duties regime. Ensure convertibility of Pakistan Rupees into US Dollars at the then-prevailing exchange rates and the remittability of foreign exchange to cover necessary payments related to the projects, including debt servicing and payment of dividends. Tariff components, however, will be adjusted and indexed as per this Policy, against exchange rate variation, inflation, etc. 9.3 Merits Of Hydel Power Projects Renewable resource Fuel saver Flexible to meet load Efficient Reliable and durable Low operation and maintenance Costs Proven technology Improvement in Communications No atmospheric pollutants
94
Improved living Standard Environmental benefits Tourism Educational Benefits Substitution of more expensive imported liquid fuels with consequent improvement in balance of payment Relief to the hard-pressed infrastructure of ports, roads and railways used in movement of imported liquid petroleum Shift towards gas-driven environment friendly energy economies Reduction in the cost of electricity generation Significant direct and indirect economic benefits during the construction and over the life of the project through employment , transit fees, availability of clean fuel, economic and industrial growth Creation of new business and investment opportunities Strengthening regional cooperation and provide a foundation for future economic growth throughout the region Hydropower is the most important source of renewable energy in the world Hydropower has furnished electricity to the world for over a century, making it a proven, reliable technology Some of the oldest hydropower projects have supplied electricity for more than 100 years and are still going strong Hydroelectric power still represents one of the most inexpensive ways to generate power Most importantly, all hydropower projects are clean, renewable sources of energy
95
Blank
APPENDICES
Blank
Appendix-I
S.No.
Province/(Area)
Projects in operation MW MW MW MW MW
Projects where no feasibilty Projects where feasibilty Study established Study established
MW
NWFP
3767.2
81
PUNJAB
1698
AJK
1036.1
Northern Area
93.732
SINDH
N.A.
BALUCHISTAN
N.A.
6595.032
99
101
To assist the regulatory authority (NEPRA) in determining and approving the tariff for new private power projects. To prepare, conduct and monitor litigation and international arbitration for and on behalf of GOP. To provide support to formulate, review and update policies and procedures relating to private sector investments in power generation and allied infrastructure, with the prior approval of the GOP. To act as a secretariat for consolidating feedback on various policy issues and assist the Ministry of Water & Power in evolving and refining private power policies.
PPIBs Activities Over The Years Over the past eight years since its establishment, PPIB has been an interface between the GOP and IPPs, and has remained instrumental in resolving various matters concerning GOP agencies and the IPPs in the context of the power policies. Until now, PPIB has issued thirty four (34) Letters of Support (LOS) totaling 8,340 MW of net capacity. Out of these nineteen (19) IPPs totaling 3,158 MW of net capacity have achieved Financial Close. Fifteen (15) of them have been commissioned, while the rest are at various stages of implementation. Even against the odds of our politico-economic system, PPIB remained successful in attracting foreign investment through these IPPs. The private power projects, both in their implementation and operational phases, have frequently faced multifarious problems, ranging from technical and financial to commercial and legal issues. In almost all these situations, PPIB examined contentious issues and strove for their settlement to the best satisfaction of the stakeholders. Close coordination and liaison with the concerned ministries/organizations has been maintained all along. This process/responsibility is of continual nature and will be sustained with requisite zest and spirit. Below is a summary of PPIBs multiple tasks undertaken thus far: Successfully and transparently implemented the 1994 Power Policy resulting in Foreign Direct Investment of about US$ 4 billion within three years. Helped in overcoming load shedding in the country. Provided an effective and efficient interface between IPPs and the GOP. Resolved various contentious IPP issues such as those pertaining to withholding tax, foreign exchange availability, sales tax, duties and taxes on spare parts, etc. Successfully negotiated, executed, and administered agreements with IPPs. Provided full support to the Ministry of Water & Power on matters relating to the power sector. Successfully handled arbitration and litigation cases with a number of non-performing companies. Provided support to GOP in finalizing various power generation policies.
102