36th Street corner 11th Avenue, Uptown Bonifacio, Fort Bonifacio

Date Created: 10/24/2024 11:

Barcode: M20241024-105

RFA No: RFA-PL-MPL3-1010

Subject: For approval of Water Meter, 20mm diameter Brand: I-JET Model: LXDG-13-25, Single Jet, Dry Dial

Trade: PLUMBING

Project Code : MPL3

Project : Manhattan Plaza Tower 3 (Laurent Park) (Manhattan Plaza - Tower 3)

Location:

Submittal Type: New Submittal

Receiver: MEPF INC.

Thru:

Sender:

Vendor: SGX BUILDING SOLUTIONS, INC.

Submittal Requirements: Brochure/Catalog

Date Needed: 11/4/2024 12:00:00AM

RFA No Description Action Taken Remarks


RFA-PL-MPL3-1010 For approval of Water Meter, 20mm
diameter Brand: I-JET Model:
LXDG-13-25, Single Jet, Dry Dial

Prepared By: SGX BUILDING SOLUTIONS, INC.Checked By: ENGR. EDEN GRACE JALEA Noted By: ALVIN ROS
Sigmature over printed name Sigmature over printed name Sigmature over printed name
Request For Approval
Manhattan Plaza Tower 3 (Laurent Park) Contract Package: Plumbing & Sanitary Works
Araneta Center, Cubao Ref. No.: SGX-MPL3-PL-RFA-010
Quezon City, Philippines Company: SGX BUILDING SOLUTIONS, INC.
To: From:
MEGAWORLD - CMD SGX BUILDING SOLUTIONS, INC.
Summary for Request of Approval
Specification Section: Paragraph: Drawing reference: Detail:
Pls see attached Catalog Pls see attached file

For approval of Water Meter, 20mm diameter


Brand: I-JET
Model: LXDG-13-25, Single Jet, Dry Dial

Prepared & Requested by: Received by : Date Transmitted by CMD: Received by Consultant:

ENGR EDEN JALEA


(Quality Manager, CE) MEPF INC
Noted by: Date Received: Date Required By Consultant: Date Received by Consultant:

ALVIN ROS
(Operations' Manager)

Response
To: From: MEPF INC
Construction Management Team Consultant

Attachments:

Responded by: Received by: Date Transmitted to CMD: Received by:

CONTRACTOR

MEPF INC
Consultant Construction Management Team
Date Received by Contractor:

10/16/2024
X

13 Oct.2021
c NOTED
c NOTED WITH COMMENT/S
c FOR RESUBMISSION
Checking done by EDD is to provide additional
comment/s and/or recommendation/s only. Design
consultant shall still be responsible for the submittal final
approval.

MJVillanueva DATE:_____________
CHECKED BY:___________________ 18 Oct 21

EDD:
Technically approved.
Use one brand only.
c NOTED
X c NOTED WITH COMMENT/S
c FOR RESUBMISSION
Checking done by EDD is to provide additional
comment/s and/or recommendation/s only. Design
consultant shall still be responsible for the submittal final
approval.
13 Oct.2021 18 Oct 21
MJVillanueva DATE:_____________
CHECKED BY:___________________

EDD:
Technically approved.
Use one brand only.
X

13 Oct.2021