CUADRO DE METRADOS DE ACERO

PLANTA DE TRATAMIENTO
LONG LONG N° PIEZAS N° ELEM.
DESCRIPCION f LONG 1/4" 3/8" 1/2" 5/8" 3/4" 1"
PART. Empalme TOTAL IGUALES IGUALES
CAMARA DE REJAS Y DESARENADOR

3/8 7.10 1.20 8.30 3.00 1.00 14.44


3/8 1.95 0.00 1.95 3.00 1.00 3.39
3/8 1.60 0.00 1.60 2.00 2.00 3.71
0.00 21.55 0.00 0.00 0.00 0.00
TOTAL= 21.55

3/8 17.30 3.40 20.70 9.00 1.00 108.05


3/8 1.65 0.00 1.65 88.00 1.00 84.22
192.27 0.00 0.00 0.00 0.00
TOTAL= 192.27

1/2 3.65 0.00 3.65 46.00 1.00 171.26


1/2 3.95 0.00 3.95 42.00 1.00 169.22
0.00 0.00 340.48 0.00 0.00 0.00
TOTAL= 340.48

MUROS DE SEDIMENTADOR
1/2 3.95 0.00 3.95 50.00 1.00 201.45
1/2 6.10 0.00 6.10 16.00 2.00 199.10
0.00 0.00 400.55 0.00 0.00 0.00
199.10 Kg
ZAPATAS
1/2 3.95 0.00 3.95 12.00 2.00 96.70
1/2 3.60 0.00 3.60 14.00 2.00 102.82
1/2 2.50 0.00 2.50 80.00 1.00 204.00
0.00 0.00 403.51 0.00 0.00 0.00
TOTAL= 403.51
LECHO DE SECADO
LOSA DE FONDO PISO
1/2 9.50 0.00 9.50 34.00 1.00 329.46
1/2 9.50 0.00 9.50 34.00 1.00 329.46
0.00 0.00 658.92 0.00 0.00 0.00
TOTAL= 658.92
COLUMNAS Y SALPICADERAS
3/8 1.10 0.00 1.10 4.00 10.00 25.52
1/4 0.72 0.00 0.72 5.00 10.00 9.00
3/8 0.85 0.00 0.85 4.00 10.00 19.72
3/8 0.76 0.00 0.76 5.00 4.00 8.82
3/8 1.50 0.00 1.50 2.00 4.00 6.96
3/8 0.35 0.00 0.35 9.00 4.00 7.31
9.00 68.32 0.00 0.00 0.00 0.00
TOTAL= 77.32