AWM 21 CIC CIC Matrix Request
AWM 21 CIC CIC Matrix Request
Project Name: Artwork Agility Suite Application Work Type: Requirement information
Use Story ID: AWM-21 User Story Name: CIC/CIC Matrix Request
Description: This user story defines the details about CIC/CIC matrix Request
Post-conditions: o Task Owner should be able to Request the CICs/CIC Matrix to BVE
o Request for CICs should sent to BVE
When ‘CIC Needed’ marked as ‘Yes’ during CIC mapping in the dependency mapping page, system dynamically generates a CIC Request
task and assign it to same design delivery (who is doing the CIC Mapping). [first placeholder task is replaced with this actual CIC request
task]
If Design Delivery mark the ‘CIC Needed’ as ‘NO’ (from yes), dynamically delete that particular CIC Request task.
If Design Delivery group 5 CICs to a CIC Matrix after selecting them ‘CIC Needed’= Yes and mark them as “CIC matrix only “using the toggle
button:
Here during ‘CIC Needed’=yes selection, initially 5 CIC request tasks get generated.
Now when 5 CICs are put on a CIC Matrix all those 5 individual CIC request tasks should be removed.
A new Request CIC Matrix task generated and linked with a placeholder CIC request task.
If user wants to add a new CIC to an existing CIC matrix (Request not yet sent) – user select the CIC using checkbox and from action menu
selects ‘CIC Matrix’ option and provide the existing CIC Matrix name. The selected CIC becomes part of the CIC Matrix.
In this scenario the individual CIC Request task for that particular CIC is removed. Old ‘Request CIC Matrix’ Task is removed. A new CIC
Matrix task is generated with the newly added CIC.
(If CiC is requested, then don’t allow)
If user remove 1 or multiple CIC from a CIC Matrix: Delete the ‘Request CIC matrix’ task first. Generate a new CIC matrix task (for
remaining CICs part of the CIC Matrix)
Generate individual CIC Request task for the removed CICs (from the matrix)
Depending on the toggle button selected for CIC Matrix (CIC Matrix only or CIC Matrix & CIC) , generate the individual CIC Request tasks
appropriately after CIC Matrixes are uploaded and approved as mentioned in above scenarios.
D_DesignJobForAWMTaskID[DesignJobID:Param.ArtworkJobID].pxResults
How to remove a CIC from a Matrix: (Only when CIC Request not sent)
Note: To remove a CIC from a CIC Matrix a bin icon should be provided in the column ‘CIC Matrix (optional), using which user can remove a
AWM System
User Story: CIC/CIC Matrix Request
CIC from a CIC Matrix. When removed the column should be blank
The naming convention for the Request CIC/CIC Matrix task should be as follows (it should change dynamically)
CIC Request: Request CIC_ [PMP No.] _ [POA No.] _ [POA Description]
Request CIC_90377912_00383537_Gain_NA_Ultra_LZ-19_4oz_LABEL_FRONT
Once PMPs are identified as CIC needed, denoted by (Yes/No/NA) in CIC needed column, there could be few scenarios by which the CIC/CIC matrix
Request can happen.
In an event there is a CIC matrix, or when user identifies or group a number of CICs in a CIC Matrix there should be a Request CIC/Request CIC Matrix
button like above shown in CIC mapping table
The Request CIC/CIC Matrix button should only appear when user enters or identifies CIC/CIC Matrix for a PMP.
By Default, the button should be at “Request CIC” for CIC. “Request CIC Matrix” for CIC Matrix.
Successful Submission of CIC/CIC Matrix Request – User gets a popup with a message – “CIC/CIC Matrix request have been
submitted”
User can select single of multiple PMPs from checkbox and request CIC from Action Button – Request CIC/CIC Matrix
AWM System
User Story: CIC/CIC Matrix Request
A pop up should be shown with selected PMP, PMP Description and CIC Matrix Name. Once submitted the corresponding
upload/approval tasks should be generated.
If User is selecting PMP which is not a CIC – Pop up with an error message should be displayed “The PMPs you have selected is not a CIC.
Please verify your selection”.
CIC request should not be sent.
If User is selecting PMPs for which Fullkit is not ready – Pop up with an error message should be displayed “Fullkit for all/part of PMPs you
have selected is not ready. Please verify your selection”.
CIC request should not be sent.
User is selecting PMPs for which CIC request already sent- > Pop up with an error message should be displayed “CIC request for all/part of
the PMPs already sent. Please verify your selection”.
CIC request should not be sent.
AWM System
User Story: CIC/CIC Matrix Request
If User is not selecting all the PMPs which are part of a single CIC Matrix (Pre condition -Fullkit for all the CIC is ready)-> Though user did
not select all the PMPs which are part of the CIC Matrix, Pop up should display all PMPs which are of the same CIC Matrix.
A message “Please confirm you want to request CIC Matrix for following CICs?” displayed along with all the CIC/PMP ID list.
Once the CIC/CIC Matrix is requested upload/approval tasks should be generated (Please refer the CIC Upload/Approval user story for
this)
Rework button is enabled when – a) CIC/CIC Matrix is requested b) CIC/CIC Matrix requested but Fullkit changed.
Rework Button -enables user to request for a new CIC upload/approve task and old tasks are cancelled (no matter what
state they are).
After rework is clicked, ‘Request CIC’/’Request CIC Matrix’ button is either enabled(green)/grayed out (Fullkit not ready)
based on Fullkit availability for the CIC.
cancelled tasks are hidden from users (PM + task owners) view.
Technical Notes
Volume or High Frequency
Frequency:
Associated Use
Case Visio
diagrams:
Data Elements:
Associated Rules:
Service Level NA
Agreements:
Assumptions: Request for CIC/CIC Matrixes should be sent to BVE along with BVE XML feed.
Full Kit should be ready for the CICs
Exception
Criteria
AWM System
User Story: CIC/CIC Matrix Request
Document History
Created By
Role Name Dept. Signature Date
Business Analyst Capgemini
Review
Role Name Dept. Date
Subject Matter Expert
AWM System
User Story: CIC/CIC Matrix Request
Product Owner
Approval
Role Name Dept. Date
Product Owner