Siddharth 21bme1004 SCM Assignment 1

Uploaded by

mehul.rudra15
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SIDDHARTH S 21BME1004 Capacitated Plant Lo

Inputs- Costs,Capacities,Demand
Demand Region
Production and Transportation cost for 10,00,000 Units
Supply Region N.America S. America Europe Asia Africa Fixed Cost ($)
N. America 81 92 101 130 115 6000
S. America 117 77 108 98 100 4500
Europe 102 105 95 119 111 6500
Asia 115 125 90 59 74 4100
Africa 142 100 103 105 71 4000
Demand 12 8 14 16 7

Decision Variables
Demand Region-Production and Transportation(1000 Units) L Plants
Supply Region N.America S. America Europe Asia Africa (1=open)
N. America 1.33227E-15 0 0 0 0 0
S. America 12 8 0 0 0 0
Europe 0 0 0 0 0 0
Asia 0 0 4 16 0 0
Africa 0 0 10 0 7 0

Constraints
Supply RegionExcess Capacity
N. America -1.3323E-15
S. America 0
Europe 0
Asia 0
Africa 3
N.America S. America Europe Asia Africa
Unmet Demand 0 0 0 0 0

OBJECTIVE FUNCTION
Cost= 23571
apacitated Plant Location Model Solution

Low Capacity Fixed Cost ($) High Capacity


10 9000 20
10 6570 20
10 9750 20
10 6150 20
10 6000 20

H Plants
(1=open) Total
0 0
1 1
0 0
1 1
1 1