E1A1466184

Download as pdf or txt
Download as pdf or txt
You are on page 1of 24

12 11 10 9 8 7 6 5 4 3 2 1

REVISION HISTORY
REV DESCRIPTION DRAWN B CHECKED APPROVED DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G
AAF PART No
GB 00301086
EST. WT = 1834 Kgs

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
1846.5 1000 962.5

gggggggggggggggggggggggggg
PACKAGE HARDWARE
GB00317618
ITEM 279 TO 280

579
E EARTHING E

350
200.4
PACKAGE HARDWARE
GB00317618
PACKAGE HARDWARE ITEM 268 TO 277
GB00317618
ITEM 844
STAGE 1
POSITION GT ENCLOSURE.
STAGE 1A
D LOCATE AND FIX SGT-600 SIGN TO CENTRE CORE ROOF PANEL PORT SIDE. D

962.5 1000 1846.5 STAGE 2


A) REMOVE WEATHER SEAL CAPPING STRIP. REFER TO DRAWING GB00286808, ITEMS 12, 13, 22, 23, 35 - 37.
B) REMOVE CENTRE CORE ROOF PANEL IF ACCESS TO INTERNAL BOLTING INTERFACE IS NOT POSSIBLE.
C) LOCATE AND BOLT COMBUSTION INTAKE SILENCER TO VENT IN ROOF PANEL.
PACKAGE HARDWARE D) REPLACE AND BOLT CENTRE CORE ROOF PANEL IF REMOVED.
579

GB00317618 E) REPLACE AND BOLT ALL REMOVED WEATHER SEAL CAPPING STIPS.
BOLT TIGHTENING TORQUES AT AMBIENT & HIGHT TEMPERATURE ITEM 844
350

NOTE: STAGE 2 ONLY REQUIRED IF COMBUSTION INTAKE SILENCER IS NOT SHIPPED INSTALLED.
TIGHTENING TORQUES FOR GRADE 8.8 BOLT AT AMBIENT TEMPERATURE

STRENGTH DRADE / SIZE GRADE 8.8 M12 M16 M20 M24


C C
200.4

TIGHTENING TORQUES IN N.M 104.0 257.0 502.0 868.0

TIGHTENING TORQUES FOR BOLTS A2 & A4 AT AMBIENT TEMPERATURE

STRENGTH DRADE / SIZE GRADE M8 M10 M12 M16 M20 M24

STAGE 1B
80 25.7 50.6 88.0 214.5 418.4 723.4
LOCATE AND FIX SGT-600 SIGN TO CENTRE CORE ROOF PANEL STARBOARD SIDE.
TIGHTENING TORQUES IN N.M 70 17.6 35.0 61.2 152.0 296.4 512.8

60 14.9 29.5 51.4 127.8 249.7 431.8


B B

TIGHTENING TORQUES FOR BOLTS A2 & A4 AT 500°C - 600°C


NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

STRENGTH DRADE / SIZE GRADE M8 M10 M12 M16 M20 M24 FIRST ANGLE PROJECTION
TITLE
80 17.1 33.7 58.7 143.0 278.9 482.3
SITE ISO BUILD SEQUENCE PORT EXHAUST
TIGHTENING TORQUES IN N.M 70 11.7 23.3 40.8 101.3 197.6 341.9 SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
60 9.9 19.7 34.3 85.2 166.5 287.9 FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
TYPICAL EARTHING CONNECTION STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 40 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 25/04/2016 Sheet 1 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

AAF PART No
GB 00273678-1
AAF PART No
EST. WT = 166 Kgs
GB 00273678-4
EST. WT = 25 Kgs
AAF PART No
GB 00273678-3
AAF PART No
EST. WT = 32 Kgs
GB 00273690-4
EST. WT = 14 Kgs
PIPE WORK SUPPLIED BY SIEMENS AAF PART No
GB 00273690-1
G EST. WT = 210.5 Kgs G

AAF PART No
AAF PART No GB 00273690-3
GB 00273678-2 EST. WT = 43 Kgs
EST. WT = 129 Kgs

AAF PART No
GB 00293783
EST. WT = 56 Kgs

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
PACKAGE HARDWARE
F F
GB00317618
ITEM 850-852
AAF PART No
GB GB00316528
EST. WT = 14 Kgs

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
PACKAGE HARDWARE
GB00317618
ITEM 789 TO 792

gggggggggggggggggggggggggg
E AAF PART No E
GB GB00312734
EST. WT = 18.5 Kgs
PACKAGE HARDWARE
GB00317618
ITEM 772, 774 TO 776 AAF PART No
GB 00273690-2
AAF PART No EST. WT = 66.5 Kgs
GB 00286538
EST. WT = 579 Kgs

C
a3

ALL WELDING TO BE GAS TIGHT. VISUAL


D CONTROL OF WELD ACC TO 281200 (PAGE D
10-14). SECURE THAT ISOLATION WILL BE
PROTECTED DURING WELDING.

STAGE 3
A) REMOVE SHIPPING WEATHER SEAL, EXHUST ROOF PANEL AND WEATHER SEAL CAPPING STRIPS IF SHIPPED INTALLED
AND ACCESS TO SITE WELD OF HORIZONTAL EXHAUST DUCT IS REQUIRED. STAGE 5
B) REMOVE OR SLACKED THERMAL INSULLATION JACKET IF PRE INSTALLED. LOCATE AND INSTALL ALL GT ENCLOSURE ACCESS.
C) UNBOLT SHIPPING CLAMPS, POSITION CORRECTLY USING LIFTING POINTS IF INSTALLATION HARDWARE CALLED OFF ON BELOW DRAWINGS.
REQUIRED THEN TIGHTEN CLAMPS TO HOLD POSITION TO AID WELDING. (REFER DRAWINGS GB00273678, GB00273690)
C D) WELD PORT SIDE HORIZONTAL EXHAUST STUB DUCT TO ENGINE C
E) IF REQUIRED ADJUST THE POSITION OF THE BLEED PIPE BEFORE ASSEMBLY. PIPE TO BE GAS TIGHT SEAL WELDED
AGAINST DUCT. IF NO LATERAL ADJUSTMENT NEEDED THE ECCENTRIC PLATE SHALL BE REMOVED AND SCRAPPED.
F) REPLACE AND BOLT EXHAUST ROOF PANEL AND WEATHER SEAL CAPPING STRIPS IF REMOVED.

STAGE 4
A) LOCATE AND INSTALL EXHAUST ROOF PANEL.
B) LOCATE AND BOLT WEATHER SEAL CAPPING STRIPS
NOTE:STAGE 4 ONLY REQUIRED IF GT ENCLOSURE EXHAUST ROOF PANEL IS NOT SHIPPED INSTALLED.

STAGE 4a:
B A) LOCATE PIPE SUPPORT ANGLES GB00312734 AND BOLT TO CENTRE CORE ROOF PANEL. 2 LOCATIONS. B

B) LOCATE PIPE SUPPORT FASTENINGS GB00316528 AND BOLT TO PIPE SUPPORT ANGLE GB00312734. 2 LOCATIONS.
C) INSTALL SIEMENS SUPPLIED PIPEWORK.
(REFER TO DRAWING GB00307988)
NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 40 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 25/04/2016 Sheet 2 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

AAF PART No
GB 00311220
EST. WT = 308.8 Kgs

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
&C

gggggggggggggggggggggggggg
OM
B US
T IO
N IN
T AK
E E E
PACKAGE HARDWARE
GB00317618
ITEM 574 TO 577

AAF PART No
GB 00314306
EST. WT = 1411.1Kgs
STAGE 6
LOCATE & BOLT VENT INTLET FAN SUPPORT STRUCTURE ON GT ROOF,
USE SUPPLIED SHIMS IF REQUIRED.

D D
3
45
23

C C

TYP
z10

STAGE 7
A) LOCATE & WELD VENT INLET FILTER HOUSE SUPPORT STRUCTURE IN POSITION ON EMBEDDED STEEL.
USE SUPPLIED SHIMS IF REQUIRED.
B) REFER TO EMBEDED STEEL WELD DETAIL ON FOUNDATION LOAD DIAGRAM GB00309235.
C) REFER TO ASSEMBLY OF VENT INLET FILTER HOUSE SUPPORT STRUCTURE GB00314306.
D) REFER TO VENT INLET STEELWORK PACKAGE HARDWARE GB00314325.

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 26/04/2016 Sheet 3 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

&
CO
M BU
ST
IO

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
PACKAGE HARDWARE
N IN GB00317618
TA ITEM 382 TO 386
K E AAF PART No
GB 00300092-1
EST. WT = 996 Kgs

gggggggggggggggggggggggggg
AAF PART No
GB 00300092-2
E E
0 EST. WT = 762.5 Kgs
60
17

PACKAGE HARDWARE
D GB00317618 D
ITEM 391 TO 392
EARTHING
TYP
z10

STAGE 8
A) LOCATE & WELD COMBUSTION INTAKE SUPPORT STRUCTURE IN POSITION ON EMBEDDED STEEL.
(ONLY VERTICAL COLUMN & LOW LEVEL BEAMS). USE SUPPLIED SHIMS IF REQUIRED.
B) REFER TO EMBEDED STEEL WELD DETAIL ON FOUNDATION LOAD DIAGRAM GB00309235.
C) REFER TO ASSEMBLY OF COMBUSTION INTAKE FILTER HOUSE SUPPORT STRUCTURE GB00314302.
D) REFER TO COMBUSTION INTAKE STEELWORK PACKAGE HARDWARE GB00314324.
C C

STAGE 9
A) LOCATE AND INSTALL VENT INLET HORIZONTAL DUCT WORK ON TO SUPPORTS (SUPPLIED BY OTHERS) ONE AT A TIME.
B) REFER TO SUPPORT POINTS ON FOUNDATION LOAD DIAGRAM GB00309235.

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
TYPICAL EARTHING CONNECTION FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 26/04/2016 Sheet 4 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 24/04/2016
H H

AAF PART No
GB 00300480
EST. WT = 327 Kgs

G G

AAF PART No
GB 00300510
EST. WT = 217 Kgs

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

AAF PART No PACKAGE HARDWARE


GB 00312317

ggggggggggggggggggggggggggggggggggggggggggggg
GB00317618

ggggggggggggggggggggggggggggggggggggggggggggggg
EST. WT = 1200 Kgs ITEM 361 TO 365
PACKAGE HARDWARE
GB00317618
ITEM 322 TO 326

gggggggggggggggggggggggggg
E E

DATUM PACKAGE HARDWARE


Z GB00317618
ITEM 333 TO 334
EARTHING PACKAGE HARDWARE
X Y
CG DATA GB00317618
ITEM 372 TO 373
EARTHING
X Y Z

978 797 834

D D

PACKAGE HARDWARE
GB00317618
C ITEM 340 TO 344 C

SLI
PACKAGE HARDWARE

60° G L E
NG
GB00317618

AN
ITEM 351 TO 352
STAGE 10 EARTHING

A) ASSEMBLE VENT INTAKE FILTER HOUSE, TRANSITION, AT GROUND LEVEL.


B) LOCATE AND BOLT HORIZONTAL DUCT TO DUCT GB00300092-2 AND TEMPORALIY SUPPORT FOR NEXT STEP. TYPICAL SLING ANGLE DETAILS
DEVIATION FROM THE INSTALLATION MANUALS & DRAWINGS MUST BE
C) LOCATE AND BOLT VENT IN ASSEMBLY TO SUPPORT STRUCTURE (USE SUPPLIED SHIMS IF REQUIRED) AND TO DUCT GB00312317. APPROVED BY AAF Ltd. HEAD OFFICE, DESIGN DEPARTMENT VIA THE
DEVIATION SYSTEM

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A TYPICAL EARTHING CONNECTION United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 26/04/2016 Sheet 5 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 24/04/2016
H H

G G

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
AAF PART No

gggggggggggggggggggggggggg
DL 4-15 No.050721
EST. WT = 600 Kgs

E E

PACKAGE HARDWARE
GB00317618
ITEM 292 TO 296

D D

PACKAGE HARDWARE PACKAGE HARDWARE


GB00317618 GB00317618
ITEM 302 TO 305 ITEM 312 TO 313
EARTHING

STAGE 11
C LOCATE AND INSTALL INTERAL FILTER HOUSE TO VENT FILTER HOUSE AND VENT INLET SUPPORT STRUCTURE. C

USE SUPPLIED SHIMS IF REQUIRED.

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 26/04/2016 Sheet 6 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

AAF PART No
GB 00301122
EST. WT = 72 Kgs

G G

X
Y DATUM AAF PART No
A123352-10
EST. WT = 119 Kgs

CG DATA

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F X Y Z F

1075 327 -145

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
gggggggggggggggggggggggggg
E E

PACKAGE HARDWARE
GB00317618
ITEM 537 TO 541

PACKAGE HARDWARE
GB00317618
ITEM 548 TO 549
EARTHING

D D

C C

SLI
6 0° N G L E
NG
A
STAGE12
A) REMOVE GUIDE VANE HOUSING BOLTS IF ALREADY INSTALLED. TYPICAL SLING ANGLE DETAILS
IF NOT INSTALLED: DEVIATION FROM THE INSTALLATION MANUALS & DRAWINGS MUST BE
APPROVED BY AAF Ltd. HEAD OFFICE, DESIGN DEPARTMENT VIA THE
B) LOCATE AND PLACE GUIDE VANE HOISING ASSEMBLY ON GT VENT IN ROOF PANEL.
DEVIATION SYSTEM
C) LOCATE AND BOLT VENT INLET DAMPER THROUGH GUIDE VANE HOUSING ASSEMBLY TO GT VENT INLET ROOF PANEL.

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 15 FIRST ORDER NUMBER MF15005
Bassington Lane
TYPICAL EARTHING CONNECTION Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 26/04/2016 Sheet 7 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

AAF PART No
GB 00300425
EST. WT = 215 Kgs

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F PACKAGE HARDWARE F
GB00317618
ITEM 478 TO 482

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
AAF PART No
GB 00300427
EST. WT = 41 Kgs
PACKAGE HARDWARE

gggggggggggggggggggggggggg
GB00317618
ITEM 499 TO 503
PACKAGE HARDWARE
DATUM GB00317618
E ITEM 518 TO 519 PACKAGE HARDWARE E
Z PACKAGE HARDWARE EARTHING GB00317618
GB00317618 ITEM 510 TO 513
ITEM 489 TO 490

X Y EARTHING

CG DATA

X Y Z

1173 442 463.5

D D

C
STAGE 13 C
A) ASSEMBLE SPIGOT PLATE TO 90 DEG BEND AT GROUND LEVEL.
B) LOCATE AND BOLT ASSEMBLY 90 DEGREE BEND TO FAN SUPPORT STRUCTURE & VENT INLET DAMPER.

SLI
60° GLE
NG
AN
TYPICAL SLING ANGLE DETAILS
DEVIATION FROM THE INSTALLATION MANUALS & DRAWINGS MUST BE
APPROVED BY AAF Ltd. HEAD OFFICE, DESIGN DEPARTMENT VIA THE
DEVIATION SYSTEM

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 15 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
TYPICAL EARTHING CONNECTION WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 26/04/2016 Sheet 8 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

AAF PART No
GB 00300426
EST. WT = 612 Kgs
PACKAGE HARDWARE
GB00317618
ITEM 418 TO 422

PACKAGE HARDWARE
GB00317618
ITEM 408 TO 409
EARTHING

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
AAF PART No
GB 00300427
EST. WT = 41 Kgs

gggggggggggggggggggggggggg
PACKAGE HARDWARE
GB00317618
ITEM 427 TO 428
EARTHING
E PACKAGE HARDWARE E
Z DATUM
GB00317618
ITEM 434 TO 437
PACKAGE HARDWARE
GB00317618
X
ITEM 400 TO 404
Y
CG DATA

X Y Z

1081.5 1170 474

D D

C STAGE 14 C
A) ASSEMBLE SPIGGOT PLATE TO VENT INLET SILENCER.
B) LOCATE AND BOLT ASSEMBLY TO VENT INLET HORIZONTAL DUCT AND FAN SUPPORT STRUCTURE.

SLI
60° N G L E
NG
A
TYPICAL SLING ANGLE DETAILS
DEVIATION FROM THE INSTALLATION MANUALS & DRAWINGS MUST BE
APPROVED BY AAF Ltd. HEAD OFFICE, DESIGN DEPARTMENT VIA THE
DEVIATION SYSTEM
B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
TYPICAL EARTHING CONNECTION ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 26/04/2016 Sheet 9 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

PACKAGE HARDWARE
GB00317618
ITEM 461 TO 465

AAF PART No
028S-29484
EST. WT = 647 Kgs

G G

PACKAGE HARDWARE
GB00317618
ITEM 470 TO 471

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
EARTHING
F F

PACKAGE HARDWARE NO FIXING REQUIRED AT THIS LOCATION.


PACKAGE HARDWARE GB00317618 FOOT CAN BE REMOVED IF REQUIRED.
GB00317618 ITEM 450 TO 451

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
ITEM 442 TO 446
EARTHING

FAN FOOT FIXED TO STRUCTURE


AT THIS LOCATION.
PACKAGE HARDWARE
GB00317618

gggggggggggggggggggggggggg
ITEM 523 TO 526

E E

PACKAGE HARDWARE
GB00317618
ITEM 877

D D

STAGE 15
LOCATE & BOLT VENTILATION FANS TO SPIGOT PLATES AND FAN SUPPORT STRUCTURE.

C C

STAGE 16
A) LOCATE AND BOLT ACCESS PLATFORM TO VENT SUPPORT STRUCTURE.
B) REFER TO LADDER FIXING DETAIL ON FOUNDATION LOAD DIAGRAM GB00309235.
C) REFER TO ASSEMBLY OF VENT INLET FILTER HOUSE ACCESS GB00314308.
B
D) REFER TO VENT INLET STEELWORK PACKAGE HARDWARE GB00314325. B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
TYPICAL EARTHING CONNECTION STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 26/04/2016 Sheet 10 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

PACKAGE HARDWARE
GB00317618
ITEM 562 TO 563
EARTHING
PACKAGE HARDWARE
GB00317618
ITEM 555 TO 559
AAF PART No
028S-29450
EST. WT = 130 Kgs

G G

4No. FAN FEET FIXED TO STRUCTURE


PACKAGE HARDWARE
GB00317618
ITEM 567 TO 570

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
gggggggggggggggggggggggggg
E E

D D

STAGE 17
LOCATE AND BOLT INERTIAL FAN TO INTERIAL FILTER HOUSE AND VENT SUPPORT STRUCTURE.
USE SUPPLIED SHIMS IF REQUIRED.
C C

STAGE 18
A) LOCATE AND BOLT COMBUSTION SUPPORT STRUCTURE TOP LEVEL BEAMS.
B) REFER TO ASSEMBLY OF COMBUSTION INTAKE FILTER HOUSE SUPPORT STRUCTURE GB00314302.
C) REFER TO COMBUSTION INTAKE STEELWORK PACKAGE HARDWARE GB00314324.

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
TYPICAL EARTHING CONNECTION STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 26/04/2016 Sheet 11 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

AAF PART No
GB 00301889
EST. WT = 305 Kgs
PACKAGE HARDWARE

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
GB00317618
ITEM 871

gggggggggggggggggggggggggg
AAF PART No
GB 00301983

E E

PACKAGE HARDWARE
GB00317618
ITEM 262 TO 263
EARTHING

PACKAGE HARDWARE
GB00317618
ITEM 251 TO 255
D D

PACKAGE HARDWARE
GB00317618
ITEM 241 TO 244

STAGE 19a
A)LOCATE & BOLT COMBUSTION INTAKE VERTICAL DUCT TO COMBUSTION INTAKE SILENCER.
C C
STAGE 19b
A) LOCATE AND BOLT ACCESS PLATFORM TO COMBUSTION IN SUPPORT STRUCTURE.
B) REFER TO LADDER FIXING DETAIL ON FOUNDATION LOAD DIAGRAM GB00309235. STAGE 20
C) REFER TO ASSEMBLY OF VENT INLET FILTER HOUSE ACCESS GB00314304. LOCATE & BOLT COMBUSTION FLEXIBLE TO COMBUSTION INTAKE VERTICAL DUCT
D) REFER TO VENT INLET STEELWORK PACKAGE HARDWARE GB00314325.

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
TYPICAL EARTHING CONNECTION UNLESS OTHERWISE STATED PART AND DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
PROJECT: SGT 600/700
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 26/04/2016 Sheet 12 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

AAF PART No PRIMARY SPREADER BEAM


GB 00298825
AAF PART No
EST. WT = 1800 Kgs
GB 00315427
EST. WT = 448 Kgs

SECONDARY SPREADER BEAM


AAF PART No PACKAGE HARDWARE
GB 00277851 GB00317618
AAF PART No EST. WT = 347 Kgs ITEM 132 TO 136
GB 00298827
G EST. WT = 1672 Kgs G
PACKAGE HARDWARE
GB00317618
ITEM 144 TO 145
EARTHING

AAF PART No
GB 00298823
EST. WT = 5200 Kgs

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

PACKAGE HARDWARE
GB00317618
ITEM 89 TO 93

ggggggggggggggggggggggggggggggggggggggggggggg
AAF PART No

ggggggggggggggggggggggggggggggggggggggggggggggg
GB 00298828
EST. WT = 330 Kgs

DATUM

gggggggggggggggggggggggggg
PACKAGE HARDWARE PACKAGE HARDWARE
GB00317618 PACKAGE HARDWARE GB00317618
ITEM 110 TO 114 GB00317618 PACKAGE HARDWARE
ITEM 100 TO 101
ITEM 122 TO 123 GB00317618
Z EARTHING ITEM 161 TO 164
EARTHING
E GB00298823 FIXED WITH M16 E
PACKAGE HARDWARE
X GB00317618
Y CG DATA ITEM 165 TO 168
GB00298825 FIXED WITH M20
X Y Z

1782 4719.5 1721.5

PACKAGE HARDWARE
D GB00317618 D
ITEM 154 TO 158

C C

AAF PART No
028S-29451
EST. WT = 434 Kgs

STAGE 21
A) LOCATE PRIMARY SPREADER BEAM GB00315427.
B) LOCATE SECONDARY SPREADER BEAMS GB00277851.
C) ASSEMBLE PULSE CROSSFLOW FILTER HOUSE, HEPA FILTER HOUSE, TRANSITION AT GROUND LEVEL.
B D) LIFT USING SPREADER BEAMS. LOCATE AND BOLT DUST HOPPER TO CROSSFLOW FILTER HOUSE AT GROUND LEVEL. B
C) LIFT, LOCATE AND BOLT FAN TO DUST HOPPER AT GROUND LEVEL.
E) LOCATE AND BOLT ASSEMBLY TO COMBUSTION INTAKE FILTER HOUSE SUPPORT. USE SUPPLIED SHIMS IF REQUIRED.
(REFER TO DRAWING GB00324463 FOR SHIM PACK SETTING OUT)
NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SLI
6 0° G L E
N GA

SIEMENS DOC No.: E1A1466184


N

TOLERANCES CLIENT: SIEMENS


UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane

TYPICAL EARTHING CONNECTION Cramlington DRAWN BY DATE


TYPICAL SLING ANGLE DETAILS WEIGHTS STATED ON THIS Northumberland
CYLIN 28/03/2016 DRAWING NUMBER
A DEVIATION FROM THE INSTALLATION MANUALS & DRAWINGS MUST BE DRAWING ARE FOR AAF-LTD United Kingdom A
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
APPROVED BY AAF Ltd. HEAD OFFICE, DESIGN DEPARTMENT VIA THE
DEVIATION SYSTEM
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 26/04/2016 Sheet 13 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

AAF PART No
GB 00300406
EST. WT = 2400 Kgs

AAF PART No
GB 00311979

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
EST. WT = 1900 Kgs
F F

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
PACKAGE HARDWARE
GB00317618 AAF PART No

gggggggggggggggggggggggggg
ITEM 172 TO 176 GB 00299814
EST. WT = 1066 Kgs

PACKAGE HARDWARE
GB00317618
E ITEM 193 TO 197 E

PACKAGE HARDWARE
GB00317618
PACKAGE HARDWARE
ITEM 183 TO 184
GB00317618
ITEM 204 TO 205 EARTHING
PACKAGE HARDWARE
EARTHING GB00317618
ITEM 213 TO 217

PACKAGE HARDWARE
GB00317618
ITEM 221 TO 222
EARTHING
D D

PACKAGE HARDWARE
GB00317618
C ITEM 231 TO 234 C

STAGE 22
A) LOCATE AND INSTALLCOMBUSTION INTAKE HORIZONTAL DUCT WORK ON TO SUPPORTS
(SUPPLIED BY OTHERS) ONE AT A TIME.
B) REFER TO SUPPORT POINTS ON FOUNDATION LOAD DIAGRAM GB00309235.

STAGE 23
LOCATE AND BOLT COMBUSTION INTAKE 90 DEGREE CASCADE BEND TO COMBUSTION INTAKE HORIZONTAL DUCT AND FLEXIBLE CONNECTION.

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
TYPICAL EARTHING CONNECTION STANDARD ENGR0030
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 26/04/2016 Sheet 14 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK P FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

BRACKETS
AAF PART No
GB 00309095
EST. WT = 16 Kgs

BRACKETS TO FLANGE
PACKAGE HARDWARE
GB00317618
ITEM 857 TO 860

G G
JIB TO BRACKETS
PACKAGE HARDWARE
GB00317618
ITEM 863 TO 866

SWING JIB
AAF PART No
GB 00007083
EST. WT = 200 Kgs

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
gggggggggggggggggggggggggg
E E

D D

C C

STAGE 24
A) LOCATE AND BOLT JIB MOUNTING BRACKETS TO HEPA & TRANSITION FLANGE.
EXISTING BOLTS IN THE FLANGE WILL NEED TO BE REMOVED TO ALLOW NEW HARDWARE.
(REFER TO DRAWING GB00309095).
B) LOCATE AND BOLT SWING JIB TO MOUNTING BRACKETS.

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - P
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL Sheet 15 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK P FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

AAF PART No
GB 00307987
EST. WT = 632 Kgs

AAF PART No
GB 00298822
G G
EST. WT = 1890 Kgs
PACKAGE HARDWARE
GB00317618
ITEM 68 TO 72

PACKAGE HARDWARE
GB00317618
ITEM 62 TO 63
EARTHING
HOODS TO CROSSFLOW 3 LOCS

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F PACKAGE HARDWARE F
GB00317618
ITEM 83 TO 84
EARTHING
BLEED HOUSE TO CROSSFLOW 1 LOC

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
PACKAGE HARDWARE
GB00317618
PACKAGE HARDWARE ITEM 75 TO 78
GB00317618

gggggggggggggggggggggggggg
Z DATUM ITEM 53 TO 56 BLEED HOUSE TO SUPPORT STRUCTURE
CG DATA

X
X Y Z
E Y E
3659 619 1895

D D

PACKAGE HARDWARE
AAF PART No GB00317618
GB 00311034 ITEM 43 TO 46
EST. WT = 2185 Kgs

C C

SLI
60 ° N G L E
NG
A
TYPICAL SLING ANGLE DETAILS
STAGE 25 DEVIATION FROM THE INSTALLATION MANUALS & DRAWINGS MUST BE
A) ASSEMBLE WEATHER HOODS TO BLEED HOUSE AT GROUND LEVEL. APPROVED BY AAF Ltd. HEAD OFFICE, DESIGN DEPARTMENT VIA THE
DEVIATION SYSTEM
B) LOCATE AND INSTALL BUG SCREENS TO WEATHER HOODS AT GROUND LEVEL.
B B
C) LOCATE AND BOLT ASSEMBLY TO CROSS FLOW FILTER HOUSE AND COMBUSTION SUPPORT STRUCTURE.

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - P
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A TYPICAL EARTHING CONNECTION United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL Sheet 16 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

AAF PART No
AI-23352-11

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
EST. WT = 162 Kgs

PACKAGE HARDWARE
GB00317618
ITEM 594 TO 595
EARTHING

gggggggggggggggggggggggggg
PACKAGE HARDWARE
E GB00317618 E
ITEM 585 TO 589

AAF PART No
GB 00309579
EST. WT = 33 Kgs

D D

STAGE 27
C C
A) LOCATE AND PLACE VENT OUTLET DAMPER IN LOCATION ON TOP OF THROTTLE PLATE.
B) BOLT VENT OUTLET DAMPER THROUGH THROTTLE PLATE TO GT CENTRE CORE ROOF PANEL.

STAGE 26
LOCATE AND PLACE VENT OUTLET THROTTLE PLATE ONTO CENTRE CORE ROOF PANEL VENT OUTLET OPENING.

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
TYPICAL EARTHING CONNECTION STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 27/04/2016 Sheet 17 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G
AAF PART No
GB 00297296
PACKAGE HARDWARE EST. WT = 322 Kgs
GB00317618
ITEM 649 TO 653 PACKAGE HARDWARE
GB00317618
ITEM 660 TO 661
EARTHING

AAF PART No
GB 00301729
EST. WT = 444 Kgs

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

PACKAGE HARDWARE
PACKAGE HARDWARE
GB00317618
GB00317618
ITEM 639 TO 640

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
ITEM 625 TO 629
EARTHING

gggggggggggggggggggggggggg
AAF PART No
GB 00301984
EST. WT = 57 Kgs
DATUM
PACKAGE HARDWARE
E E
GB00317618
ITEM 615 TO 616
EARTHING

CG DATA

X Y
X Y Z

1046 475 1218.5

PACKAGE HARDWARE
GB00317618
ITEM 604 TO 608
D D

C C
STAGE 28
A) ASSEMBLE VENT OUTLET TRANSITION , SILENCER & 90° BEND AT GROUND LEVEL.
B) LOCATE AND BOLT ASSEMBLY TO VENT OUTLET DAMPER.

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT
SLI

FIRST ANGLE PROJECTION


TITLE
60° NGLE
NG

SITE ISO BUILD SEQUENCE PORT EXHAUST


A

SIEMENS DOC No.: E1A1466184


TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
TYPICAL EARTHING CONNECTION TYPICAL SLING ANGLE DETAILS FABRICATION TOLERANCES TO BE IN
DEVIATION FROM THE INSTALLATION MANUALS & DRAWINGS MUST BE ACCORDANCE WITH AAF-LTD'S
AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
STANDARD ENGR0030
APPROVED BY AAF Ltd. HEAD OFFICE, DESIGN DEPARTMENT VIA THE Bassington Lane
Cramlington DRAWN BY DATE
DEVIATION SYSTEM WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 27/04/2016 Sheet 18 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK P FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
PACKAGE HARDWARE
GB00317618
ITEM 681 TO 685

gggggggggggggggggggggggggg
AAF PART No
GB 00312548-3
E EST. WT = 391 Kgs E

AAF PART No
GB 00312548-2
PACKAGE HARDWARE
EST. WT = 733 Kgs
GB00317618
ITEM 670 TO 674

AAF PART No
PACKAGE HARDWARE
GB 00312942
GB00317618
EST. WT = 110 Kgs
ITEM 692 TO 696

AAF PART No
D GB 00312548-1 D
PACKAGE HARDWARE
EST. WT = 1423 Kgs GB00317618
ITEM 715 TO 719

PACKAGE HARDWARE
GB00317618
ITEM 726 TO 727
EARTHING

STAGE 30
A) LOCATE AND BOLT VENT OUTLET COWL TO VENT HOUTLET HORIZONTAL DUCT.
C B) ENSURE WIRE MESH IS PLACED BETWEEN COWL AND DUCT BEFORE BOLTING. C

PACKAGE HARDWARE
GB00317618
ITEM 705 TO 706
EARTHING

STAGE 29
A) LOCATE AND INSTALL VENT OUTLET HORIZONTAL DUCT WORK ON TO SUPPORTS (SUPPLIED BY OTHERS) ONE AT A TIME.
B) CONNECT VENT OUTLET HORIZONTAL DUCT TO 90° BEND.
C) REFER TO SUPPORT POINTS ON FOUNDATION LOAD DIAGRAM GB00309235.

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - P
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
TYPICAL EARTHING CONNECTION STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL Sheet 19 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK P FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
gggggggggggggggggggggggggg
E E

D D

AAF PART No
GB 00300445
EST. WT = 3794 Kgs

C C

EN
GI
NE
CE
N TR PACKAGE HARDWARE
EL GB00317618
8 4 IN
38 E ITEM 761 TO 764

STAGE 32
LOCATE AND BOLT EXHAUST SILENCER TO SUPPORT STEELWORK.
PACKAGE HARDWARE
B
STAGE 31 GB00317618 B
A) LOCATE AND INSTALL EXHAUST SILENCER SUPPORT STRUCTURE. ITEM 880
B) REFER TO ASSEMBLY AND DETAILS OF EXHAUST SILENCER STEELWORK GB00301992.
C) REFER TO EXHAUST SILENCER SUPPORT STEELWORK FIXING ON FOUNDATION LOAD DIAGRAM GB00302935.
NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - P
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 70 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL Sheet 20 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
gggggggggggggggggggggggggg
E E

AAF PART No
ISL 7446 - 4

PACKAGE HARDWARE
GB00317618
ITEM 742 TO 744

AAF PART No
GB 00300451
D EST. WT = 727 Kgs D

STAGE 33
A) LOCATE AND TEMPORAILRY BOLT EXHAUST TRANSITION DUCT TO SILENCER. PACKAGE HARDWARE
B) INTERNALLY FULLY WELD EXHAUST TRANSITION DUCT TO SILENCER. GB00317618
ITEM 753 TO 756
z3

C C

INTERNALLY STAGE 34
z3
z3
INTERNALLY A) LOCATE AND WELD EXHAUST FLEXIBLE CONNECTION TO EXHAUST TRANSITION DUCT.
ALL WELDING TO BE GAS TIGHT.
VISUAL CONTROL OF WELD ACC TO B) LOCATE AND WELD EXHAUST FLEXIBLE TO EXHAUST HORIZONTAL STUB DUCT.
281200 (PAGE 10-14). SECURE THAT C) INSTALL WEATHER SEAL FROM FLEXIBLE CONNECTION TO GT ENCLOSURE USING
ISOLATION WILL BE PROTECTED
DURING WELDING. SUPPLIED BACKING FLATS.
D) INSTALL PERSONELL GUARD.

B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
INTERNALLY
SITE ISO BUILD SEQUENCE PORT EXHAUST
z3

SIEMENS DOC No.: E1A1466184


TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 :80 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 27/04/2016 Sheet 21 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

PACKAGE HARDWARE
GB00317618
ITEM 772,774 TO 776

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F PACKAGE HARDWARE F
PACKAGE HARDWARE PACKAGE HARDWARE
GB00317618
GB00317618 GB00317618
ITEM 771,774 TO 776
ITEM 789 TO 792 ITEM 789 TO 792

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
PACKAGE HARDWARE
GB00317618
ITEM 771,774 TO 776

gggggggggggggggggggggggggg
PACKAGE HARDWARE
GB00317618
ITEM 789 TO 792

E E

PACKAGE HARDWARE
D GB00317618 D
ITEM 771,774 TO 776

PACKAGE HARDWARE
GB00317618
ITEM 789 TO 792

PACKAGE HARDWARE
GB00317618 PACKAGE HARDWARE
ITEM 772,774 TO 777 GB00317618
ITEM 771,774 TO 776

STAGE 35
C FOR EXHAUST STACK, ACCESS, DUCT AND FLEXIBLE CONNECTION REFER TO PACKAGE HARDWARE
C
INSTALLATION SEQUENCE AND GUIDE SC2948-EPR-001 GB00317618
ITEM 771,774 TO 776

PACKAGE HARDWARE
GB00317618
ITEM 780 TO 783

STAGE 36
A) LOCATE, MATCH & DRILL AND BOLT 3RD STAGE BLEED PIPE SUPPORT BRACKET ON COMBUSTION INTAKE CROSSFLOW
FILTER HOUSE AND BOLT BRACKETS TO COMBUSTION INTAKE FILTER HOUSE SUPPORT STEELWORK.
B) LOCATE AND BOLT 3RD STAGE BLEED PIPE SUPPORTS TO COMBUSTION INTAKE FILTER HOUSE SUPPORT STEELWORK.
C) LOCATE, MATCH & DRILL AND BOLT 3RD STAGE BLEED PIPE SUPPORT BRACKETS ON COMBUSTION INTAKE HORIZONTAL DUCT WORK.
B D) LOCATE, MATCH & DRILL AND BOLT 3RD STAGE BLEED PIPE SUPPORT ON COMBUSTION INTAKE 90⁰ CASCADE BEND. B
E) LOCATED AND BOLT 3RD STAGE BLEED PIPE SUPPORT ON GT CENTRE CORE ROOF PANEL.
F) REFER TO ASSEMBLY OF 3RD STAGE BLEED PIPEWORK GB00307988.
NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 :80 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
01/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 27/04/2016 Sheet 22 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F F
PACKAGE HARDWARE
GB00317618
ITEM 799 TO 800

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
PACKAGE HARDWARE
GB00317618
ITEM 799 TO 800

gggggggggggggggggggggggggg
PACKAGE HARDWARE
E GB00317618 E
ITEM 803 TO 804
PACKAGE HARDWARE
GB00317618
ITEM 809 TO 813

D D

PACKAGE HARDWARE
GB00317618
ITEM 799 TO 800

C C

STAGE 37
A) LOCATE AND INSTALL 3RD STAGE BLEED PIEPWORK.
B B
B) REFER TO ASSEMBLY OF 3RD STAGE BLEED PIPEWORK GB00307988.
C) REFER TO DETAIL OF 3RD STAGE BLEED PIPEWORK-2 GB00315013.

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 80 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
29/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 29/04/2016 Sheet 23 of 24
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DRAWN BY CHECKED BY APPROVED BY DATE
NOT TO BE SCALED IF IN DOUBT ASK 1 FIRST ISSUE CYLIN Y.Z RD 26/04/2016
H H

G G

PACKAGE HARDWARE
GB00317618
PACKAGE HARDWARE
ITEM 830 TO 835
GB00317618

gggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggggg
F ITEM 840 TO 841 F
PACKAGE HARDWARE
GB00317618
ITEM 830 TO 835

ggggggggggggggggggggggggggggggggggggggggggggg
ggggggggggggggggggggggggggggggggggggggggggggggg
PACKAGE HARDWARE
GB00317618 PACKAGE HARDWARE
ITEM 840 TO 841 GB00317618
ITEM 840 TO 841

gggggggggggggggggggggggggg
E E

PACKAGE HARDWARE
GB00317618
ITEM 837

PACKAGE HARDWARE
GB00317618
D ITEM 830 TO 835 D

PACKAGE HARDWARE
GB00317618
ITEM 840 TO 841
PACKAGE HARDWARE
GB00317618
ITEM 830 TO 835

PACKAGE HARDWARE
C GB00317618 C
ITEM 830 TO 833

STAGE 38
A) LOCATE, MATCH & DRILL AND BOLT BREATHER PIPEWORK SUPPORT TO COMBUSTION INTAKE HEPA & TRANSITION.
B) LOCATE, MATCH & DRILL AND BOLT BREATHER PIPEWORK SUPPORTS TO COMBUSTION INTAKE HORIZONTAL DUCT WORK.
C)LOCATE AND INSTALL BREATHER PIPEWORK.
D) REFER TO ARRANGEMENT OF BREATHER PIPEWORK GB00316054.
E) REFER TO ASSEMBLY & DETAILS OF BREATHER PIPE GB00316055.
B B

NOTICE : THIS DRAWING IS THE PROPERTY OF AAF LTD AND IS LOANED SUBJECT TO THE CONDITION THAT IT SHALL NOT BE COPIED, LOANED OR SUBMITTED TO OUTSIDE PARTIES FOR EXAMINATION WITHOUT WRITTEN CONSENT

FIRST ANGLE PROJECTION


TITLE
SITE ISO BUILD SEQUENCE PORT EXHAUST
SIEMENS DOC No.: E1A1466184
TOLERANCES CLIENT: SIEMENS
UNLESS OTHERWISE STATED PART AND
PROJECT: SGT 600/700 DRAWING SIZE - A1 DRAWING REV - 1
FABRICATION TOLERANCES TO BE IN
ACCORDANCE WITH AAF-LTD'S
STANDARD ENGR0030 AAF-Ltd. SCALE 1 : 80 FIRST ORDER NUMBER MF15005
Bassington Lane
Cramlington DRAWN BY DATE
WEIGHTS STATED ON THIS Northumberland
28/03/2016 DRAWING NUMBER
A United Kingdom
CYLIN A
DRAWING ARE FOR AAF-LTD
NE23 8AF CHECKED BY DATE
GUIDANCE AND DO NOT FORM THE
BASIS OF A CONTRACT BETWEEN
AAF-LTD. AND THE
Tel.: 01670 713477
Fax.: 01670 714370
Y.Z
APPROVED BY
29/04/2016
DATE
GB00317616
SUB-CONTRACTOR POWER & INDUSTRIAL RD 29/04/2016 Sheet 24 of 24
12 11 10 9 8 7 6 5 4 3 2 1

You might also like