0% found this document useful (0 votes)
21 views

SEMI-FINAL EXAM (Managerial Accounting)

exam

Uploaded by

dbnatoc18
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

SEMI-FINAL EXAM (Managerial Accounting)

exam

Uploaded by

dbnatoc18
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MYSTICAL ROSE COLLEGE OF SCIENCE AND TECHNOLOGY

POGONLOMBOY, MANGATAREM, PANGASINAN


COLLEGE OF BUSINESS ADMINISTRATION MAJOR IN HUMAN RESOURCE MANAGEMENT
BSBA-3B MANAGERIAL ACCOUNTING
MIDTERM EXAMINATION

NAME:__________________________ SCORE:______________

STRICTLY NO ERASURES
I- True or False (2PTS EACH)
________1. Manufacturing costs are generally incurred in one period and recorded in a subsequent period.
________2. A job order cost system and a process cost system are the two alternative methods for valuing
inventories.
________3. Manufacturing Overhead is the only product cost that can be assigned to jobs as soon as the costs are
incurred.
________4. Requisitions for direct materials are posted daily to the individual job cost sheets.
________5. There should be a separate job cost sheet for each job.
________6. A process cost accounting system is appropriate for similar products that are continuously mass
produced.
________7. A company may use either a job-order cost system or a process cost system, but not both.
________8. A job order cost system identifies cost with a particular job rather than with asset time period.
________9. The perpetual inventory method cannot be used in a job order cost system.
________10.A job order cost system is most appropriate when large volume of similar product are produced.
II- ESSAY (30 POINTS)
1. What is the difference between Job order costing and Process Costing in terms of:
a. Job Size (5PTS)
b. Cost Accumulation (5PTS)
2. Give10 Examples of Process Costing. (10PTS)
3. A company can or cannot use both job-order costing and process costing.
Explain the statement briefly. (10PTS)

PREPARED BY: DAISY B. NATOC, LPT, MBA

You might also like