DETAILS TRADE PACKAGE The Malabar Process and Reliability/ FACTORS PROJECT LOCATION: Renewal (PARR) Improvement Project The scope of the Malabar PARR Project Malabar, NSW will provide Malabar Waste treatment includes the supply and installation and Plant with the appropriate process commissioning of electrical and control COMMENCEMENT DATE: capability, reliability and operability to for plant and equipment. March 2015 ensure its compliance with current EPA licence requirements to 2031, and The Screenings & Grit Outloading Area COMPLETION DATE: ensure the continued protection of and The Biosolids Dewatering & March 2016 beach water quality and improve Outloading Area. operational conditions. TYPE OF CONTRACT: Complete electrical installation of ALL electrical, instrumentation, control and Low Voltage related equipment, consisting of Sydney Water granted Star Group the contract to implement the entirety of the • Supply and installation of Cable CONTRACT VALUE: Electrical Installation Works for: Supports – Aluminium NEMA 2 $1 Million + Cable ladder The Screenings & Grit Outloading Area and • Installation and termination of PROJECT MANAGER: The Biosolids Dewatering & electrical, instrumentation and Kevin Raffler Outloading Area. controls cables between the Main Electrical Centre and the Washpress E&I MANAGER: Room, Vehicle Tunnel 3, Conveyor Phil Tilden Portal Building, Screenings Bin Area, Grit Washer Area and Grit Bin Area, Biosolids Bins, Conveyors and Outloading. PROJECT PROJECT CHALLENGES SPECIFICS • Installation and termination of • Interaction with an operational • Installation of over 500m of NEMA earthing and equipotential bonding Waste Water facility. 2 Aluminium Cable Ladder conductors • Contact daily with Waste • Over 1,500 terminations • Installation of General Light & Products • Installation of over 15,000 m of Power • Program Delays (Construction power, instrument and control • Installation of Flow & Pressure Activities) cabling Switches, Level Sensors, Limits & • Environmentally sensitive flora • Installation of over 250 warning devices. and fauna Instruments, motors and devices. • Supply and installation of field • Material Long Lead Times handstations • Hazardous Area Equipment, Terminations & Inspections • Point-to-point testing of all control system signals • Installation of new switchboards including: Biosolids Motor Control Centre PLC Control Panel PLC Power Supply Panel Communications Panel Four (4) new free-standing variable speed drives Two (2) centrifuge control panels One (1) weight controller