Bill of Quantities
Bill of Quantities
P-KWD-SRiver-SW59-2024-25
Re-Excavation of Shoyaijani River from Km. 0.00 to Km. 11.760= 11.76 Km.at Upazila-Nikli, Dist- Kishoreganj in C/W
River Bank Protection Works, Wave Protection and Re-Excavation of Khal in Ten Upazilas of Kishoreganj District
Project under Kishoregonj WD Division, BWDB, Kishoregonj during the Financial Year 2023-24.
Table
Bill of Quantities
Name :
Unit Total Total
Item Unit Price Price Price Price
Item Code Measurement
Group Description of Item Quantity
no. (if Unit In In In
In figures (BDT)
any) Words Figures Words
(BDT) (BDT) (BDT)
1 16- 16- Erection of bamboo Each 235
100- 100- profile with full
00 00 bamboo posts and
pegs not less than 60
mm in diameter and
coir strings etc.
complete as per
direction of Engineer
in charge.
2 90- 90- Dredging work by Cum 389746.176
100- 100- operating dredger of
30 30 different diameter with
necessary
arrangement by Tug
boat/Work boat
disposing dredged
earth up to 1.5 km,
positioning the cutter
of dredger at
designed level by
maintaining
bathymetric pre work
and post work survey;
constructing,
dismantling and
shifting from one line
to another line of
temporary/permanent
Shore pipe line at
ground level laying on
the ground or on 50
kg gunny bag where
|necessary or on
staging made by
bullah of local wood
(100 mm dia), lifting
manually/by tripod
stand with chain
pulley, fitting/fixing
shore pipe with nut-
bolt & rubber gasket,
levelling & dressing
uneven ground below
the shore pipe where
necessary; lifting
shore pipe sunk into
the mud below the
ground level using
tripod stand & chain
hoist and cleaning with
water, including the
cost of mobilization
and demobilization of
dredger with
houseboat by Tug
boat/Work boat,
fitting/fixing &
maintenance of all
necessary equipment,
supplying of
necessary fuels &
lubricants, shore pipes
& floating pipes,
ancillary dredging
materials and charges
etc. complete as per
direction of engineer
in charge. Dredging
work by 18'' dredger.
3 16- 16- Earth work by manual Cum 1900.875
450- 450- labour with clayey soil
00 00 (minimum 30% clay,
0-40% silt and 0-30%
sand) in construction
of cross bundh/ ring
bundh as per design
and specification with
all leads and lifts,
throwing the earth in
layers not exceeding
150mm in thickness,
including breaking
clods, rough dressing,
clearing the jungle,
removing stumps, dug
bailing and 75mm
cambering etc.
complete as per
direction of Engineer
in charge.
4 12- 12- Bailing out of water Cum 59455
310- 310- with all leads and lifts
20 20 by manual labour or
pump, with all
arrangements for
protection of ring bund
and side slopes of
foundation pit against
erosion or washout
etc, complete actual
volume of work will be
measured by sounding
method before
starting the work) as
per direction of
Engineer in charge. by
pump
5 16- 16- Earth work by Cum 194873.088
410- 410- Mechanical Excavator
00 00 (Long Boom ) in all
kinds of soil in
excavation / re-
excavation of
channel/canal/khal
etc. Including disposal
of spoil-soil upto 30m
away from the point
of excavation with
rough dressing and
levelling etc. complete
as per direction of
Engineer-in-Charge.
6 16- 16- Earth work by manual Cum 64957.696
400- 400- labour in all kinds of
00 00 soil in excavation or
reexcavation of
channels with the
initial lead of 30m and
lift of 1.5m luding
levelling, dressing and
throwing the spoils to
profile with breaking
clods, rough dressing,
clearing jungles
including cutting trees
upto 200mm girth, dug
bailing etc. omplete as
per direction of
Engineer in charge.
7 16- 16- Extra Rate for every pspc 29230.963
420- 420- additional shift of
00 00 Dredged/Excavated
earth or shifting of
earth by Mechanical
Excavator ( Long
Boom ) of 30m or
part thereof beyond
the initial shift of 30m
upto a maximum of 9
shift for all kind of
earthwork shift. (Unit:
per shift per cum) ( 1
No. Shift)
8 MR MR Supplying, fitting & Nos 2
fixing of sign board
made with MS sheet,
angle etc (size : 2m x
1m) with post
complete as per
direction of Engineer
in charge.
9 MR MR Video & Steel Photo Km 23.52
(Pre and Post work).
10 10- 10- River Morphological Each 470.4
100- 100- Data
30 30 Collection/Bathymetric
and river bank
topography Survey for
river/khal Section
(Section width upto 50
m), Including cost of
all necessary
equipments (Level
Machine, Hand GPS,
DGPS, survey vessel
etc.), Necessary
Personnel (River
Morphology Expert
for data consistency
checking,
Engineer/Survey
Specialist for data
processing with
survey software and
prepare necessary
Table, Graph and
Morphological
Parameter
Calculations, Surveyor
& Unskilled Labour for
field data collection),
Accommodation,
Transportation from
Headquarter to site
andsite movement and
shaded boat for
bathymetric survey for
field Survey Team
including necessary
fuels and Lubricant,
Other necessary
auxiliary items such as
survey flags, pegs
with provision for
submission of report
in hard binded copies
(at least 6 copies
required), soft copies
and raw survey data
with provision of 10%
random re- survey for
data consistency
checking as per
direction of Engineer
in charge. Section
Interval: 41 m to 60m
Grand
Total :
P-KWD-SRiver-SW59-2024-25
Table
.
Name :
Table
Unconditional Discount
Name :
Discount in Percentage (%)[In figure] Discount in Percentage (%) [In word]