Boqcomparativechart - 2024-11-09T213601.871
Boqcomparativechart - 2024-11-09T213601.871
Boqcomparativechart - 2024-11-09T213601.871
Rate Amount
1.00 Appendix A : - Supply and erection of 750 kva 11KV/3.3KV
Transformer at Kalathinkadavu
1.00 OD96782/2023-2024:Fabrication, Supply and Erection of 3.00 no 497000.00 1491000.00
11 KV 4 pole structure as per standards made out of
1.00 OD96783/2023-2024:Supply of all materials and providing 180.00 sqm 3675.00 661500.00
substation yard fencing using 50 x 50 x 6mm angle iron
1.00 OD96784/2023-2024:Supply of all materials and providing 6.00 no 11500.00 69000.00
2000mm wide 2500mm height weld mesh gate made out of
1.00 OD96785/2023-2024:11KV Metering Unit Supply,erection, 3.00 no 146000.00 438000.00
testing and commissioning of out door type metering unit
1.00 OD96786/2023-2024:TOD Meter Supply,erection, testing 3.00 no 65000.00 195000.00
and commissioning of TOD meter with maximum demand in
1.01 OD96787/2023-2024:11KV Switchgear (Indoor) Supply, 1.00 no 2000000.00 2000000.00
erection, testing and commissioning of 11KV, 400A,
1.01 OD193592/2023-2024:750KVA Transformers (Outdoor 1.00 no 2035000.00 2035000.00
type ) (for RW pumpsets) Supply,erection, testing and
1.01 OD193593/2023-2024:NGR -Neutral grounding resistor 1.00 no 280000.00 280000.00
Design,engineering, supply erection,testing and
1.01 OD193594/2023-2024:PANEL BOARDS - HV Panel board 1.00 no 1820000.00 1820000.00
( for 750 KVA transformer ) 3.3 KV- Supply, erection, testing
1.01 OD193595/2023-2024:Supply,erection, testing and 1.00 no 308000.00 308000.00
commissioning of 100KVA, 11KV/433 V. 3phase, 50Hz.
1.01 OD193596/2023-2024:Supply installation testing and 1.00 no 200000.00 200000.00
commissioning of fully partitioned, dust and vermin proof
2.00 Appendix B - Supply and erection of Transformers at WTP
& Seed Farm
2.00 OD96788/2023-2024:Supply,erection, testing and 1.00 no 1030000.00 1030000.00
commissioning of 315KVA, 11KV/433 V. 3phase, 50Hz.
2.00 OD96789/2023-2024:Supply installation testing and 1.00 no 480000.00 480000.00
commissioning of fully partitioned, dust and vermin proof
2.00 OD96790/2023-2024:Supply,erection, testing and 1.00 no 570000.00 570000.00
commissioning of 200KVA, 11KV/433 V. 3phase, 50Hz.
2.00 OD96791/2023-2024:Supply installation testing and 1.00 no 350000.00 350000.00
commissioning of fully partitioned, dust and vermin proof
2.00 OD96793/2023-2024:Supply, laying, testing and 200.00 metre 2200.00 440000.00
commissioning of the following size PVC/XLPE insulated,
2.01 OD96794/2023-2024:Supply, laying, testing and 65.00 metre 1600.00 104000.00
commissioning of the following size PVC/XLPE insulated,
2.01 OD96795/2023-2024:Supply, laying, testing and 50.00 metre 1740.00 87000.00
commissioning of the following size PVC/XLPE insulated,
2.01 OD96796/2023-2024:Supply, laying, testing and 30.00 metre 1300.00 39000.00
commissioning of the following size PVC/XLPE insulated,
2.01 OD96797/2023-2024:Supply, laying, testing and 50.00 metre 780.00 39000.00
commissioning of the following size PVC/XLPE insulated,
2.01 OD96798/2023-2024:Supply, laying, testing and 100.00 metre 900.00 90000.00
commissioning of the following size PVC/XLPE insulated,
2.01 OD96799/2023-2024:Supply, laying, testing and 30.00 metre 700.00 21000.00
commissioning of the following size PVC/XLPE insulated,
2.01 OD96800/2023-2024:Supply, laying, testing and 50.00 metre 400.00 20000.00
commissioning of the following size PVC/XLPE insulated,
2.01 OD96801/2023-2024:Supply, laying, testing and 50.00 metre 260.00 13000.00
commissioning of the following size PVC/XLPE insulated,
2.01 OD96802/2023-2024:Supply, laying, testing and 50.00 metre 205.00 10250.00
commissioning of the following size PVC/XLPE insulated,
2.02 OD96803/2023-2024:Supply, laying, testing and 50.00 metre 170.00 8500.00
commissioning of the following size PVC/XLPE insulated,
2.02 OD96804/2023-2024:Supply, laying, testing and 50.00 metre 160.00 8000.00
commissioning of the following size PVC/XLPE insulated,
2.02 OD96805/2023-2024:Supply of all materials and providing 6.00 each 15000.00 90000.00
end termination of the following size PVC/XLPE insulated,
2.02 OD96806/2023-2024:Supply of all materials and providing 2.00 no 12500.00 25000.00
end termination of the following size PVC/XLPE insulated,
2.02 OD96807/2023-2024:Supply of all materials and providing 18.00 no 11000.00 198000.00
end termination of the following size PVC/XLPE insulated,
2.02 OD96808/2023-2024:Supply of all materials and providing 2.00 no 8300.00 16600.00
end termination of the following size PVC/XLPE insulated,
2.02 OD96809/2023-2024:Supply of all materials and providing 4.00 no 640.00 2560.00
end termination of the following size PVC/XLPE insulated,
2.02 OD96810/2023-2024:Supply of all materials and providing 8.00 no 575.00 4600.00
end termination of the following size PVC/XLPE insulated,
2.02 OD96811/2023-2024:Supply of all materials and providing 2.00 no 470.00 940.00
end termination of the following size PVC/XLPE insulated,
2.02 OD96812/2023-2024:Supply of all materials and providing 2.00 no 325.00 650.00
end termination of the following size PVC/XLPE insulated,
2.02 OD96813/2023-2024:Supply of all materials and providing 2.00 no 325.00 650.00
end termination of the following size PVC/XLPE insulated,
2.03 OD96814/2023-2024:Supply of all materials and providing 2.00 no 280.00 560.00
end termination of the following size PVC/XLPE insulated,
2.03 OD193808/2023-2024:Supply of all materials and providing 2.00 no 280.00 560.00
end termination of the following size PVC/XLPE insulated,
2.03 OD96815/2023-2024:EARTHING - Supply and providing 21.00 set 15500.00 325500.00
plate earhing as per IS 3043 by using 600mm x 600mm x
2.03 OD96816/2023-2024:Supply, laying and termination of the 50.00 metre 1600.00 80000.00
following sizes of copper strip/wires for earthing of
2.03 OD96817/2023-2024:Supply, laying and termination of the 100.00 metre 290.00 29000.00
following sizes of GI strip/wires for earthing of substation,
2.03 OD97885/2023-2024:Supply, laying and termination of the 100.00 metre 1000.00 100000.00
following sizes of copper strip/wires for earthing of
2.03 OD96818/2023-2024:Supply, laying and termination of the 100.00 metre 230.00 23000.00
following sizes of copper strip/wires for earthing of
2.03 OD96819/2023-2024:Supply, laying and termination of the 100.00 metre 120.00 12000.00
following sizes of copper strip/wires for earthing of
2.03 OD96820/2023-2024:Supply, laying and termination of the 100.00 metre 165.00 16500.00
following sizes of copper strip/wires for earthing of
2.04 OD96821/2023-2024:Supply and fixing of 6mm thick .50 set 122000.00 61000.00
chequered plate with required M.S. angle/plate supports over
2.04 OD96822/2023-2024:Supply and fixing of M.S. angle cable .50 set 122000.00 61000.00
tray for clamping the various sizes of cables in trenches,
2.04 OD96823/2023-2024:Supplying, fixing, testing and 2.00 set 63000.00 126000.00
commissioning of Lead acid cell battery suitable voltage and
2.04 OD96824/2023-2024:Supplying, fixing, testing and 2.00 set 50000.00 100000.00
commissioning of automatic twin battery charger with
2.04 OD96825/2023-2024:Supply and providing the following 3.00 set 85000.00 255000.00
safety items approved by Kerala Electrical Inspectorate and
2.04 OD96826/2023-2024:Internal and External Lighting 1.00 set 535000.00 535000.00
provisions including MCB distribution boards, modular switch
2.04 OD96827/2023-2024:Provision for soil resistivity 1.00 set 150000.00 150000.00
measurement , earthing design, making electrical scheme
3.00 Appendix C - Supply and erection of Raw water pumpset
from intake ar Kalathinkadavu to WTP at Arakkumpoyilkunnu
3.00 OD96829/2023-2024:Design,Supply erection testing and 720.00 HP (Horse 23800.00 17136000.0
commissioning of reputed make best quality Vertical Turbine power) 0
3.00 OD96830/2023-2024:MMotor: Supply , erection , testing and 3.00 each 450000.00 1350000.00
commissioning of KWA pre-qualified reputed make vertical
3.00 OD96831/2023-2024:Supply, erection, testing and 3.00 each 1140000.00 3420000.00
commissioning a complete integrated FCMA/soft starter
3.00 OD231946/2023-2024:Design, supply, erection,testing and 1.00 L.S 2000000.00 2000000.00
commissioning of earthing with copper strip/wire, suitable
3.00 OD96832/2023-2024:Design,supply, erection, testing and 3.00 no 185000.00 555000.00
commissioning of Suitable 3.30Kv Capacitor with 6%
4.00 Appendix D - Supply and erection of Clear water pumpset
from WTP at Arakkumpoyilkunnu to Proposed 22.00 LL
4.00 OD96833/2023-2024:Pump-Supply, erection ,testing and 140.00 HP (Horse 24300.00 3402000.00
commissioning of KWA pre-qualified reputed make power)
4.00 OD96834/2023-2024:Motor: Supply , erection , testing and 2.00 each 170000.00 340000.00
commissioning of KWA pre-qualified reputed make
4.00 OD96835/2023-2024:Supply, erection, testing and 2.00 each 120000.00 240000.00
commissioning a complete integrated FCMA/soft starter
4.00 OD231948/2023-2024:Design, supply, erection,testing and 1.00 L.S 550000.00 550000.00
commissioning of LT panel board, suitable for operating 2
4.00 OD96836/2023-2024:Design,supply, erection, testing and 1.00 each 85000.00 85000.00
commissioning of APFC capacitior panel having suitable
4.01 OD97445/2023-2024:Supplying an electro-magnetic flow 1.00 set 210000.00 210000.00
meter conforming to protection level of IP-68 for FLow
5.00 Appendix E - Supply and erection of Clear water pumpset
from sump at WTP to 37 LL OHSR at WTP Site
5.00 OD118113/2023-2024:Pump-Supply, erection ,testing and 70.00 HP (Horse 26000.00 1820000.00
commissioning of KWA pre-qualified reputed make power)
5.00 OD118112/2023-2024:Motor: Supply , erection , testing and 2.00 each 100000.00 200000.00
commissioning of KWA pre-qualified reputed make
5.00 OD118114/2023-2024:Supply, erection, testing and 2.00 each 67500.00 135000.00
commissioning a complete integrated soft starter panel
5.00 OD231955/2023-2024:Design, supply, erection,testing and 1.00 L.S 295000.00 295000.00
commissioning of LT panel board, suitable for operating 2
5.00 OD118116/2023-2024:Design,supply, erection, testing and 2.00 each 21000.00 42000.00
commissioning of APP capacitior having suitable capacity
5.01 OD118111/2023-2024:Supplying an electro-magnetic flow 1.00 set 210000.00 210000.00
meter conforming to protection level of IP-68 for FLow
6.00 Appendix E - Supply and erection of Clear water pumpset
from sump at Vengaparatha to 50 KL OHSR at Pattakarimbu
6.00 OD97123/2023-2024:Pump-Supply, erection ,testing and 30.00 HP (Horse 30500.00 915000.00
commissioning of KWA pre-qualified reputed make power)
6.00 OD97124/2023-2024:Motor: Supply , erection , testing and 2.00 each 53000.00 106000.00
commissioning of KWA pre-qualified reputed make
6.00 OD97125/2023-2024:Supply, erection, testing and 2.00 each 34000.00 68000.00
commissioning a complete fully automatic star delta starter
6.00 OD231959/2023-2024:Design, supply, erection,testing and 1.00 L.S 155000.00 155000.00
commissioning of LT panel board, suitable for operating 2
6.00 OD97126/2023-2024:Design,supply, erection, testing and 2.00 each 8000.00 16000.00
commissioning of suitable capacity capacitior for the above
7.00 Appendix F - Supply and erection of Clear water pumpset
from Sump at Vengaparatha to 15 KL sump at Assumption
7.00 OD97181/2023-2024:Pump-Supply, erection ,testing and 50.00 HP (Horse 27200.00 1360000.00
commissioning of KWA pre-qualified reputed make power)
7.00 OD97182/2023-2024:Motor: Supply , erection , testing and 2.00 each 70000.00 140000.00
commissioning of KWA pre-qualified reputed make
7.00 OD97183/2023-2024:Supply, erection, testing and 2.00 each 19000.00 38000.00
commissioning a complete fully automatic star delta starter
7.00 OD231962/2023-2024:Design, supply, erection,testing and 1.00 L.S 220000.00 220000.00
commissioning of LT panel board, suitable for operating 2
7.00 OD97184/2023-2024:Design,supply, erection, testing and 2.00 each 9500.00 19000.00
commissioning of suitable capacity heavy duty APF
8.00 Appendix G - Supply and erection of Clear water pumpset
from Sump at Assumption School to 1.15 LL GLSR at TK
8.00 OD97255/2023-2024:Pump-Supply, erection ,testing and 60.00 HP (Horse 29000.00 1740000.00
commissioning of KWA pre-qualified reputed make power)
8.00 OD97256/2023-2024:Motor: Supply , erection , testing and 2.00 each 100000.00 200000.00
commissioning of KWA pre-qualified reputed make
8.00 OD97257/2023-2024:Supply, erection, testing and 2.00 each 43000.00 86000.00
commissioning a complete integrated soft starter panel
8.00 OD231972/2023-2024:Design, supply, erection,testing and 1.00 L.S 262000.00 262000.00
commissioning of LT panel board, suitable for operating 2
8.01 OD97258/2023-2024:Design,supply, erection, testing and 2.00 each 14000.00 28000.00
commissioning of suitable capacity heavy duty APF
9.00 Appendix H - Supply and erection of Clear water pumpset
from Sump at Seed Farm to 21 LL OHSR at PH Centre
9.00 OD97272/2023-2024:Pump-Supply, erection ,testing and 140.00 HP (Horse 26500.00 3710000.00
commissioning of KWA pre-qualified reputed make power)
9.00 OD97273/2023-2024:Motor: Supply , erection , testing and 2.00 each 170000.00 340000.00
commissioning of KWA pre-qualified reputed make
9.00 OD97274/2023-2024:Supply, erection, testing and 2.00 each 35000.00 70000.00
commissioning a complete integrated soft starter panel
9.00 OD231978/2023-2024:Design, supply, erection,testing and 1.00 L.S 625000.00 625000.00
commissioning of LT panel board, suitable for operating 2
9.01 OD97275/2023-2024:Design,supply, erection, testing and 1.00 each 92000.00 92000.00
commissioning of APFC capacitior panel having suitable
10.00 Appendix I - Supply and erection of Clear water pumpset
from Sump at Seed farm to 50 KL OHSR at Cheenkakallu
10.00 OD97295/2023-2024:Pump-Supply, erection ,testing and 20.00 HP (Horse 29000.00 580000.00
commissioning of KWA pre-qualified reputed make power)
10.00 OD97296/2023-2024:Motor: Supply , erection , testing and 2.00 each 25700.00 51400.00
commissioning of KWA pre-qualified reputed make
10.00 OD97297/2023-2024:Supply, erection, testing and 2.00 each 16850.00 33700.00
commissioning a fully automatic star delta starter pf meter
10.00 OD231984/2023-2024:Design, supply, erection,testing and 1.00 L.S 100000.00 100000.00
commissioning of LT panel board, suitable for operating 2
10.01 OD97298/2023-2024:Design,supply, erection, testing and 2.00 each 6800.00 13600.00
commissioning of suitable capacity heavy duty APF
11.00 Appendix J - Electrification / wiring works of pump houses
11.00 OD97306/2023-2024: Wiring for light point/fan point/ 80.00 each 1260.00 100800.00
exhaust fan point with 1.5 square mm FRLS PVC insulated
11.00 OD97307/2023-2024: Supplying and drawing following 60.00 each 70.00 4200.00
size of FRLS PVC insulated copper conductor, single core
11.00 OD96706/2023-2024: Supplying and drawing following 85.00 each 95.00 8075.00
sizes of FRLSPVC insulated copper conductor, single core
11.00 OD96707/2023-2024: Supplying and fixing of following 60.00 each 115.00 6900.00
sizes of medium class PVC conduit along with accessories
11.01 OD96708/2023-2024: Supplying and fixing of following 60.00 each 120.00 7200.00
sizes of medium class PVC conduit along with accessories
11.01 OD96709/2023-2024: Supplying and fixing following 40.00 each 110.00 4400.00
modular switch/ socket on the existing modular plate &
11.01 OD96710/2023-2024: Supplying and fixing following 30.00 each 145.00 4350.00
modular switch/ socket on the existing modular plate &
11.01 OD96711/2023-2024: Supplying and fixing modular 20.00 each 40.00 800.00
blanking plate on the existing modular plate & switch
11.01 OD96712/2023-2024: Supplying and fixing following 36.00 each 170.00 6120.00
modular switch/ socket on the existing modular plate &
11.01 OD96713/2023-2024: 1.24.1 Supplying and fixing 36.00 each 225.00 8100.00
following modular switch/ socket on the existing modular
11.01 OD96714/2023-2024: Supplying and fixing 20 amps, 10.00 each 1600.00 16000.00
240 volts, SPN industrial type, socket outlet, with 2 pole and
11.01 OD96715/2023-2024: Supplying and fixing 32 amps, 10.00 each 3650.00 36500.00
240 volts, SPN industrial typed fixing 3, socket outlet, with 2
11.01 OD96716/2023-2024: Supplying and fixing following 10.00 each 315.00 3150.00
size/modules,GI box along with modular base & cover
11.01 OD96717/2023-2024: Supplying and fixing following 20.00 each 370.00 7400.00
size/ modules, GI box alongwith modular base & cover
11.02 OD96718/2023-2024: 1.27.4 Supplying and fixing 20.00 each 430.00 8600.00
following size/ modules, GI box alongwith modular base
11.02 OD96719/2023-2024: Wiring for powerplug with 2x4 80.00 each 340.00 27200.00
1x4 sq. mm earth wire 1.7.3 Industrial plug
11.02 OD96720/2023-2024: Supplying and fixing following 4.00 each 560.00 2240.00
size/ modules, GI box alongwith modular base & cover
11.02 OD96721/2023-2024: 1.58 Supplying and fixing PVC 36.00 each 115.00 4140.00
batten/ angle holder including connection etc. as
11.02 OD96722/2023-2024:Charges for cutting holes suitable for 10.00 each 550.00 5500.00
accomadating Exhaust fan above 305mm Sweep and up to
11.02 OD96723/2023-2024: 90.4.10 Conveyance, 10.00 each 520.00 5200.00
installation , testing and commissioning of exhaust fans of
11.02 OD96724/2023-2024: supply of 450 mm sweep, 900 10.00 each 4900.00 49000.00
rpm Heavy Duty Exhaust fan working on 230 V
11.02 OD96725/2023-2024: 300/305 mm sweep Light Duty 6.00 each 4150.00 24900.00
Exhaust fan in metal frame working on 230 V
11.02 OD96726/2023-2024: Conveyance, installation, 6.00 each 125.00 750.00
testing and commissioning of wall mounting fans of all types
11.02 OD96727/2023-2024: Supply of 300 mm sweep Wall 6.00 each 4150.00 24900.00
Mounting fan
11.03 OD96728/2023-2024:Supplying and fixing two module 10.00 each 440.00 4400.00
stepped type electronic fan regulator on the existing modular
11.03 OD96729/2023-2024:Supply, conveyance, installation, 10.00 each 1900.00 19000.00
testing and commissioning of ceiling fans of the following
11.03 OD96730/2023-2024:Supply, fabrication, conveyance and 50.00 each 460.00 23000.00
fixing the following sizes of B class GI pipe bent to shape /
11.03 OD96731/2023-2024:Supply and fixing of 36/40 W, 4000 30.00 each 4600.00 138000.00
lumen LED, IP 66 street light fitting , RoHS compliant, LED
11.03 OD96732/2023-2024: 90.3.19.3 Supply conveyance, 46.00 each 1400.00 64400.00
installation, testing and commissioning the light fittings of
11.03 OD96733/2023-2024: Supply, Installation with light 6.00 each 1380.00 8280.00
fittring of approved brand aesthetic look 20/18 W LED ceiling
11.03 OD96734/2023-2024: Supply and installation of sheet 6.00 each 7425.00 44550.00
steel, phosphatised and painted, dust and vermin proof
11.03 OD96735/2023-2024: Supplying and fixing following 6.00 each 2300.00 13800.00
way, single pole and neutral, sheet steel, MCB distribution
11.03 OD96736/2023-2024: Supply and installation of 63A 6.00 each 7000.00 42000.00
100 mA 4P RCCB in the existing DB complete with
11.03 OD96737/2023-2024: Supply and installation of 25A 6.00 each 2530.00 15180.00
30 mA 2P RCCB in the existing DB complete with
11.04 OD96738/2023-2024: Supplying and fixing 5 amps to 36.00 each 260.00 9360.00
32 amps rating, 240/415 volts, "C" curve,
11.04 OD96739/2023-2024: Supplying and fixing 5 amps to 12.00 each 1050.00 12600.00
32 amps rating, 240/415 volts, "C" curve,
11.04 OD96740/2023-2024:Supplying and fixing following rating, 6.00 each 445.00 2670.00
double pole, 240 volts, isolator in the existing MCB DB
11.04 OD96741/2023-2024:Supplying and fixing following rating, 6.00 each 1100.00 6600.00
four pole, 415 volts, isolator in the existing MCB DB
11.04 OD96742/2023-2024:Supply erction testing and 6.00 each 10350.00 62100.00
commissioning of 100W LED steet light output >
11.04 OD97874/2023-2024:Supplying, erection and testing steel 6.00 each 24500.00 147000.00
tubular swaged poles as per IS 2713 (Part II) - 1980 of
1491000.00 Electric
Project
661500.00 Electric
Project
69000.00 Electric
Project
438000.00 Electric
Project
195000.00 Electric
Project
2000000.00 Electric
Project
2035000.00 Electric
Project
280000.00 Electric
Project
1820000.00 Electric
Project
308000.00 Electric
Project
200000.00 Electric
Project
1030000.00 Electric
Project
480000.00 Electric
Project
570000.00 Electric
Project
350000.00 Electric
Project
440000.00 Electric
Project
104000.00 Electric
Project
87000.00 Electric
Project
39000.00 Electric
Project
39000.00 Electric
Project
90000.00 Electric
Project
21000.00 Electric
Project
20000.00 Electric
Project
13000.00 Electric
Project
10250.00 Electric
Project
8500.00 Electric
Project
8000.00 Electric
Project
90000.00 Electric
Project
25000.00 Electric
Project
198000.00 Electric
Project
16600.00 Electric
Project
2560.00 Electric
Project
4600.00 Electric
Project
940.00 Electric
Project
650.00 Electric
Project
650.00 Electric
Project
560.00 Electric
Project
560.00 Electric
Project
325500.00 Electric
Project
80000.00 Electric
Project
29000.00 Electric
Project
100000.00 Electric
Project
23000.00 Electric
Project
12000.00 Electric
Project
16500.00 Electric
Project
61000.00 Electric
Project
61000.00 Electric
Project
126000.00 Electric
Project
100000.00 Electric
Project
255000.00 Electric
Project
535000.00 Electric
Project
150000.00 Electric
Project
17136000.0 Electric
0 Project
1350000.00 Electric
Project
3420000.00 Electric
Project
2000000.00 Electric
Project
555000.00 Electric
Project
3402000.00 Electric
Project
340000.00 Electric
Project
240000.00 Electric
Project
550000.00 Electric
Project
85000.00 Electric
Project
210000.00 Electric
Project
1820000.00 Electric
Project
200000.00 Electric
Project
135000.00 Electric
Project
295000.00 Electric
Project
42000.00 Electric
Project
210000.00 Electric
Project
915000.00 Electric
Project
106000.00 Electric
Project
68000.00 Electric
Project
155000.00 Electric
Project
16000.00 Electric
Project
1360000.00 Electric
Project
140000.00 Electric
Project
38000.00 Electric
Project
220000.00 Electric
Project
19000.00 Electric
Project
1740000.00 Electric
Project
200000.00 Electric
Project
86000.00 Electric
Project
262000.00 Electric
Project
28000.00 Electric
Project
3710000.00 Electric
Project
340000.00 Electric
Project
70000.00 Electric
Project
625000.00 Electric
Project
92000.00 Electric
Project
580000.00 Electric
Project
51400.00 Electric
Project
33700.00 Electric
Project
100000.00 Electric
Project
13600.00 Electric
Project
100800.00 Electric
Project
4200.00 Electric
Project
8075.00 Electric
Project
6900.00 Electric
Project
7200.00 Electric
Project
4400.00 Electric
Project
4350.00 Electric
Project
800.00 Electric
Project
6120.00 Electric
Project
8100.00 Electric
Project
16000.00 Electric
Project
36500.00 Electric
Project
3150.00 Electric
Project
7400.00 Electric
Project
8600.00 Electric
Project
27200.00 Electric
Project
2240.00 Electric
Project
4140.00 Electric
Project
5500.00 Electric
Project
5200.00 Electric
Project
49000.00 Electric
Project
24900.00 Electric
Project
750.00 Electric
Project
24900.00 Electric
Project
4400.00 Electric
Project
19000.00 Electric
Project
23000.00 Electric
Project
138000.00 Electric
Project
64400.00 Electric
Project
8280.00 Electric
Project
44550.00 Electric
Project
13800.00 Electric
Project
42000.00 Electric
Project
15180.00 Electric
Project
9360.00 Electric
Project
12600.00 Electric
Project
2670.00 Electric
Project
6600.00 Electric
Project
62100.00 Electric
Project
147000.00 Electric
Project
BOQ Summary Details
Tender Title: JJM-CWSS to Karulai, Amarambalam, Moothedam and Chokkad Package XII - Supply and erection of Raw
water , Clear water Pumpsets, Transformers, , interconnection ,wiring works , Power line extension and Power connection
charges,General Electrical Work
Tender ID: 2024_KWA_670589_1
BoQ Defects
BoQ1-DT Mismatch-Cell-BA13,BoQ1-DT Mismatch-Cell-BB13,BoQ1-DT Mismatch-Cell-BA25,BoQ1-DT Mismatch-Cell-
BB25,BoQ1-DT Mismatch-Cell-BA67,BoQ1-DT Mismatch-Cell-BB67,BoQ1-DT Mismatch-Cell-BA73,BoQ1-DT Mismatch-