09a 26 00 A3 Sheet 02
09a 26 00 A3 Sheet 02
09a 26 00 A3 Sheet 02
5PF BRS
0. ALL DRAWINGS ARE IN METRIC MEASUREMENTS 28 108 64 50 1-02.2 1-02.3 1-02.2
8 5 9 4
1. ALL ENGINEERING PRACTICES SHALL BE APPLIED WITH REGARDS R12.5 R 12 . DOWEL
5
14
TO HOLE AND SHAFT TOLERANCES.
1.5
15
4
2. WHERE SCREWS OR BOLTS ARE USED THE CLEARANCE HOLES 7 14 3 5 1-02.3 1-02.1
SHALL BE APPROXIMATELY 5% TO 8% LARGER THAN THE SPF SPF 0
R1 2 REQD
26
MATCHING TAPPED HOLE. 9 16 16 9 1-02.2 4 REQD
25
R5 SCALE 1:1.5
14
3. PREFERABLY ALL TAPPED HOLES AND MATCHING SCREWS 25 25 SPF
AND/OR BOLTS TO BE METRIC FINE (MF) SPF 35.5 B 35.5 1-02.1 MS/ALU
7 60 7
4. MATERIALS SPECIFIED ON THE DRAWINGS ARE INDICATIVE ONLY. R3 3 1
16
2mm DEEP
45
45
11
THE BUILDER CAN MAKE HIS/HER OWN MATERIAL CHOICE.
16 3
CYLINDER CL
34
32
30
7.5
5. ALL CONNECTIONS/JOINTS WHICH HAVE STEAM PRESSURE
22
2
15
ENGINE CL R6
16
APPLIED TO IT SHALL BE SILVER/HARD SOLDERED.
6. COMPRESSION SPRINGS ARE DRAWN IN COMPRESSED STATE (CP), R6
UNCOMPRESSED STATE IS APPROX 40% TO 60% LONGER THEN R4
16
A 23 12 12 23 A
22
COMPRESSED STATE.
30
32
34
7. WHERE PREFERRED SCREW OR RIVETED CONNECTIONS CAN BE R3 R3 R4
4
45
45
11
OMITTED AND PARTS CAN BE BONDED TOGETHER BY USING EITHER 4
16
2
104
HIGH STRENGTH GLUE, EPOXY RESIN, OR SOLDER. R5 2 2
2
75
10
71
8. PARTS WHICH ARE DIRECTLY EXPOSED TO STEAM AND/OR R3 25 13
14
10
25
WATER SHOULD BE CONSTRUCTED USING NON-FERROUS OR NON 1-06.4 10 3
57
26
CORROSIVE MATERIAL SUCH AS BRASS, BRONZE, GUNMETAL, SPF SPF 2
13LPF
STAINLESS STEEL, COPPER OR MONEL.
18
9
9. THE ORDER IN WHICH THE PARTS/COMPONENTS ARE 16 16 10 18 R4
2.5
1.5
2
2
MANUFACTURED AND THE MODEL IS ASSEMBLED IS ENTIRELY LEFT R 1 31 2
TO THE BUILDER/MODEL MAKER. 33 75 6 37 55 8
10
10. A COLOUR SCHEME FOR THIS PROJECT IS ENTIRELY LEFT UP TO
1
THE MODEL MAKER. 24 21 21 24 BACK
4-4PL-AS 4 24
11. THE MANNER IN WHICH THE PARTS/COMPONENTS ARE 26 B 26
4 18
MANUFACTURED IS ENTIRELY LEFT UP TO THE BUILDER. 6-2PL FRONT
20PCD
SOLDER
12PF
12. USE LOCTITE, ON SCREW OR PRESS FIT CONNECTIONS OR
28
7
SURFACES, WERE DEEMED NECESSARY TO PREVENT PARTS FROM SCALE 1:2
LOOSENING.
20
6
13. WASHERS AND/OR SPRINGWASHERS SHALL BE USED WHERE
DEEMED NECESSARY.
10
XX. ERRORS AND/OR OMISSIONS MAY OCCUR IN THE DRAWINGS, DO 1-01 BRS 2REQD SCALE 1:1.15
NOT HESITATE TO CONTACT ME SO THAT THE ERRORS/OMISSIONS 6 MS/BRS/ALU/CI SECTION A-A 6 4 6 6 13 68 13
CAN BE RECTIFIED. SCALE 1 : 2 SCALE 1:2 1-06.2 1-06.3 SOLDER 48 16 2
OTHER ABBREVIATIONS
5-2PL
8
1-06.3 SECTION B-B
6
AS = AS SHOWN 1-06.4 SOLDER SCALE 1 : 2
8
DP = DEEP
14
DAA= DRILL AFTER ASSEMBLY 9 22 22 9
D&TAA= DRILL AND TAP AFTER ASSEMBLY
5x45-2PL
6
CF = CLOSE FIT (SIZE FOR SIZE)
PF = PRESS FIT 16 16
7
PFAA= PRESS FIT AFTER ASSEMBLY
14
46PCD 1-06.1 1-07 23PCD
9
PCD = PITCH CIRCLE DIAMETER 6 4 6 22
RM = REAM 1-05.2 R4 4-3PL
3 13 13 3 G R4
HEX = HEXACON, 6SIDED .5
4-3PL
R2
8
3-4PL-AS
KNL = KNURLED
8
8
CSK = COUNTERSINK
2 5 5 2 R2
8
PL = PLACES 3x45-2PL 1-03.3 .5
R2
°
1 20
8
28F
120
DWL= DOWEL
7 6 3
°
SPF= SPOTFACE 9 22 22 9
46PCD
5 16 16 5
34
(T)HESOP=(TAPPED)HOLES EQUALLY SPACED ON BRZ
10
15 16 16 15
7
21
R4
PCD
30°
11 10 10 11
30°
(T)HESOC=(TAPPED)HOLES EQUALLY SPACED ON 10 3 16 3 10
5.5
SCALE 1:1.5 6 3 6 5 5
CIRCUMFERENCE
8
11 5
OD = OUTSIDE DIAMETER 6 6 20 20
8
21
SA-xxx = SUB ASSEMBLY-xxx
8
15 CHANNELS 3 3
G
5
8
3mm DEEP
9 6
MATERIAL ABBREVIATIONS: 5 16 16 5 1-04.2
ALU = ALUMINIUM SCALE 1:1.5 =5=
8.5 8.5
5 16 16 5 26
13
SCALE 1:1.5
R1 3
5
D
6 43
1.5
CI = CAST IRON
21
21
8
1-02
5
CU = COPPER 12
14
22RM
2.5 7.5 7.5 2.5 SECTION F-F
12
GRA = GRAPHITE 4
34
30
1-04.3 1-05 1-07
11
4
SPS = SPRING STEEL 4 8 8 4 3x45-2PL 4 BRZ 1-05.2
3
1-06
PEEK= POLYETHER ETHER KETONE
R1
C E
28PF
SYN = SYNTHETIC MATERIAL SUCH AS VETON, NYLON, SECTION E-E
16
31
12RM
TEFLON OR RUBBER
24
24