Install Pipescchecklis 3

Uploaded by

SANG CHEMEI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

©2024 TVET CDACC

073203T4PLM
PLUMBER LEVEL 3
CON/OS/PL/CR/01/3
INSTALL PIPES IN BUILDINGS
July/August 2024

TVET CURRICULUM DEVELOPMENT, ASSESSMENT AND CERTIFICATION


COUNCIL (TVET CDACC)

ASSESSOR PRACTICAL CHECKLIST

INSTRUCTIONS TO ASSESSOR

1. Assess the candidate as the practical progresses observing the critical areas.
2. You are required to mark the practical as the candidate perform the tasks.
3. You are required to take video clips/photos at critical points.
4. Ensure the candidate has a name tag and registration code at the back and front.

Page 1 of 5
©2024 TVET CDACC

Candidate’s name & Registration No.

Assessor’s name & Reg. code

Unit(s) of Competency Install Pipes in Building.

Venue of Assessment

Date of assessment

Items to be evaluated: Please award marks as


Marks Marks
appropriate. Give a brief comment on your Comments
available obtained
observation.

OBSERVATION CHECKLIST

1. Adhered to prescribed safety as per workplace


procedures and OSHA
Student wore PPE
 Overall/Dust coat
 Safety boots
2
(Award 1 mark for each ×2=2)
2. Observed occupational safety
 Safe use of tools and equipment
2
 Proper arrangement
(Award 1 marks for each observation × 2= 2)
3. Assembled all the required tools and 3
equipment for the practical.
 Measuring tool
 Cutting tool
 Holding tools
(Award 1 mark for each x 3= 3)
4. Used all the required tools and equipment 3
appropriately.

Page 2 of 5
©2024 TVET CDACC

 Die stock
 Pipe wrench
 Heat fusion machine.
(Award 1 mark for each x 3= 3)
5. Identified symbols in the pipework. 2
 Adaptor
 Union
(Award 1 mark for each x 2= 2)
6. Assembled all materials required for the 2
practical.
 PVC pipe
 GI pipes
 Ppr pipes
 Necessary fittings
(Award 0.5 mark for each material × 4=2)
7. Measured and cut the pipes accurately: 5
 600 mm x 4
(Award 0.5 mark for each ×4=2)
 300 mm x 4
(Award 0.5 mark for each ×4=2)
 200 mm x 2
(Award 0.5 mark for each × 2=1)

8. Bended appropriately using Machine. 2


(Award 1 mark ×2 bends =2)
9. Bended appropriately using Heat. 4
(Award 2 marks for each bend ×2=4)
10. Threaded accurately on all required ends. 3
(Award 0.5 marks for each×6=3)
2-3 threads to remain

Page 3 of 5
©2024 TVET CDACC

11. Fitted fittings properly according to the 3


drawing.
(Award 0.5 mark ×6=3)
12. Cleaned and cleared workspace based on 1
SOPs
(Award 1 marks or 0)

13. Stored tools and equipment based on 1


manufacturer’s instruction.
(Award 1 marks for proper storage of equipment)

PRODUCT CHECKLIST

14. Connected fittings properly to the pipes 5


(Award 0.5 mark for each joint ×10=5)
15. Smooth bends 8
(Award 2 mark for each bend ×4=8)
16. Complete work 4
(Award 4 marks for completion, 2 for 75%
completion or zero)
TOTAL 50

The candidate was found to be: Competent Not yet competent

(Please tick as appropriate)

(The candidate is competent if the candidate obtains at least 50%)

Feedback from candidate:

Page 4 of 5
©2024 TVET CDACC

Feedback to candidate:

Candidate’s signature: Date:

Assessor’s signature: Date:

THIS IS THE LAST PRINTED PAGE.