FOOTING SCHEDULE PLINTH BEAM SCHEDULE

DESCRIPTION SIZE DEPTH - D REINFORCEMENT REINFORCEMENT STIRUPPS


S.NO: DESCRIPTION SIZE (ST2)
TOP BOTTOM
F1 4' - 0" x 4' - 0" 12" 10Y @ 6" C/C BOTHWAYS.
1 PB1 9" X 12" 2 OF 12 Y 3 OF 12 Y 8Y ST2@ 6" C/C

F2 5' - 0" x 5' - 0" 15" 10Y @ 5" C/C BOTHWAYS. 2 PB2 9" X 15" 2 OF 12 Y 3 OF 12 Y 8Y ST2@ 6" C/C

F3 3' - 0" x 3' - 0" 12" 10Y @ 6" C/C BOTHWAYS. R C C COLUMN

NATURAL GROUND LEVEL


COLUMN SCHEDULE PLINTH BEAM - PB
DESCRIPTION SIZE REINFORCEMENT SHAPE OF TIES

5'-0"
6" 6"
REINFORCEMENT
6 NOS. OF 12Y MAIN RODS

9"
C1 9" x 12"

DEPTH - D
8Y TIES @ 6" C/C
9"
18"

SC 4" PCC1:4:8
9"

SC - STUB COLUMN 9" x 9" 4 NOS. OF 12Y MAIN RODS


3" SAND FILLING
UPTO PB TOP LVL. 8Y TIES @ 6" C/C
9"
3" SIZE OF FOOTING 3"

TYPICAL FOOTING DETAIL

NOTES:
1) THIS FOUNDATION HAS BEEN DESIGNED
FOR G+1 FLOORS ONLY. ASSUMING THE
STRUCTURAL CONSULTANT:
SBC OF SOIL AS 1.25 KSC.
STL Builder
PLOT NO 15/140 FLAT NO: 7, SHRI GANESH FLATS ,
WITH 53 GRADE CEMENT. 2ND FLOOR, 8TH STREET, VIRUGAMBAKKAM,
CHENNAI - 600092. (AVM AVENUE NEAR
3) USE STEEL H.S.D BARS Fe415
DRAWN : GEORGETOWN, VEMBULI AMMAN KOIL),PH : + 9198840 25365.
(TOR 40) GRADE.
CHENNAI- 6000 001.
4) CLEAR COVER FOR :

5) ALL CENTRE LINE DIMENSIONS ARE TO


S1 DATE : 13-03-24
SCALE : MOBILE: 94447 55600
BE FOLLOWED AS PER ARCH. DRWG.