4HANA Conversion in Finance
4HANA Conversion in Finance
CUSTOMER
Disclaimers
The information in this presentation is confidential and proprietary to SAP and may not be disclosed without the
permission of SAP. Except for your obligation to protect confidential information, this presentation is not subject to your
license agreement or any other service or subscription agreement with SAP. SAP has no obligation to pursue any
course of business outlined in this presentation or any related document, or to develop or release any functionality
mentioned therein.
This presentation, or any related document and SAP's strategy and possible future developments, products and or
platforms directions and functionality are all subject to change and may be changed by SAP at any time for any reason
without notice. The information in this presentation is not a commitment, promise or legal obligation to deliver any
material, code or functionality. This presentation is provided without a warranty of any kind, either express or implied,
including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-
infringement. This presentation is for informational purposes and may not be incorporated into a contract. SAP assumes
no responsibility for errors or omissions in this presentation, except if such damages were caused by SAP’s intentional or
gross negligence.
All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ
materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements,
which speak only as of their dates, and they should not be relied upon in making purchasing decisions.
Session Focus
System Conversion (without downtime optimization techniques)
Session Objective
Create awareness about particularities of Finance Conversion within SAP S/4HANA Conversion
▪ Conversion Approach
▪ Lessons Learned for Finance
▪ Conversion in Detail/Phases, Check Reports, Finance Table Cleanup After Conversion
▪ Finance Conversion: IMG Activities, Migration Monitor and Error Analysis Navigation
Conversion requirements incl. min./max. SP-level on source system: 2620910 - SAP S/4HANA … and SAP BW/4HANA 1.0:
2884313 - SAP S/4HANA 2020: Release Information Note Recommended Application Server Platforms
SAP S/4HANA
*With SAP S/4HANA 2020, FPS02, conversion target 1809 got invalid
© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ CUSTOMER 5
Finance conversion in the context of SAP S/4HANA On-Premise Edition
▪ Conversion Guide for SAP S/4HANA 2020 refers to note 2332030 for Finance Conversion.
▪ KBA 2741967 How to plan and execute the financial data migration during conversion of SAP ERP solution to S/4HANA.
▪ KBA 2804470 Best practices for the SAP S/4HANA Conversion: General Ledger data migration.
▪ SAP conversion programs read data from old tables and transfer them to new structures.
▪ Compatibility views (tables) are created to make old reports / transaction codes work.
▪ Configuration/customizing has to be adapted in some areas (see Simplification List).
▪ For Finance the customizing has to be done during Conversion. It cannot be prepared in the old system.
▪ With a system Conversion it is not possible to activate new functionalities like document split, parallel ledgers etc.
Classic general ledger is transferred technically to new general ledger/ACDOCA without activating new functionalities.
▪ If you are using SD-Revenue Recognition, you need to migrate (implement) to new RAR before your conversion to
S/4HANA. Note 2582784 FAQ's and Guidance RAR
© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ CUSTOMER 6
SAP S/4HANA Universal Journal
Adoption paths
For example:
Simplification List • Data Migration
SAP S/4HANA • IMG Activities after
• Identify and review the relevant Simplification items
Readiness Check Migration
• Run Customizing pre-checks and adapt settings
• Application specific
• Check consistency and reconcile data follow-up activities
Remote Scans with ABAP
• Period end closing activities
Test Cockpit • Material number field
• Document your posting data length extension
Simplification
• Archive data you no longer need
Item Catalog • Testing & Validation
• CVI migration
• Material number field extension
© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ CUSTOMER 8
*)This is not a full list, only some key examples
Agenda
Session Focus
System Conversion (without downtime optimization techniques)
Session Objective
Create awareness about particularities of Finance Conversion within SAP S/4HANA Conversion
▪ Conversion Approach
▪ Lessons Learned for Finance
▪ Conversion in Detail/Phases, Check Reports, Finance Table Cleanup After Conversion
▪ Finance Conversion: IMG Activities, Migration Monitor and Error Analysis Navigation
Most of the projects, are having the following pain points, mostly in the Finance area:
Accurate project planning can be done only after the first test conversion (in Sandbox/Copy of
production) has been finished. Specifically to Finance data migration, this point is relevant because the
amount of data inconsistencies cannot be accurately foreseen. Additionally, the complexity and the duration
of the Finance tasks cannot be fully comprehended.
Plan sufficient time for testing including roles and changes in authorizations
It is recommended to identify items which can be adressed as a preparation within the start release
and consider setting up “pre-projects “, for example:
– Clean-up of FI data inconsistencies
– Clean up of custom code and replace custom code with standard functionality where possible
– Clean-up of vendor/customer master data and activation of CVI
– Check if (consistent) archiving can be done to reduce the data volume to be converted.
– New Depreciation engine activation/ new asset accounting implementation
– Customizing adaptation to meet prerequisites in FI-AA, FI etc
The conversion to SAP S/4HANA requires application consultants with in-depth FI, CO, and Asset
Accounting knowledge, to be already involved in the preparation phase.
Plan a dedicated authorization expert role as well as an SAP Fiori expert role as part of the project team to
work with the busines (functional and basis).
Maintain a detailed ‘run book’ with as much as possible details, all the steps performed, the sequence, the
errors and the resolution and also the time required for each activity, if applicable to be repeated.
Finance Conversion has to be finished. There is no possibility of a general roll-back to the old system. So,
Finance Conversion must be Set to Completed.
Finance Conversion is run per client – No exclusion of Company Codes is possible once
FINS_MIG_STATUS has started
Run and analyze all recommended pre-checks in order to identify show-stoppers like inconsistencies in
currency settings, compatibility of add-ons (especially from 3rd-party vendors), customer specific programs
that use standard tables/fields. Check if BW extractors still work in SAP S/4HANA (see SAP Note 2500202).
Create small Business Blueprint for Finance Conversion to clarify additional customizing settings for
target release (and which items are postponed to later).
▪ SAP Fiori and embedded analytics should be considered to leverage the full potential of SAP S/4HANA
▪ Consider migrating from SAPscript forms to Adobe Document Services
Business might have to clarify some topics with auditors (e.g. which check reports to run before/after
Conversion, which errors / warnings are acceptable). Consider to involve them as early as possible.
© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ CUSTOMER 12
Finance Conversion
Key takeaways / Lessons learned
Practice shows that there could be a lot of inconsistency in the Asset Accounting area - start checks and pre-
checks as soon as possible (before conversion project).
Pay special attention to Asset Accounting Conversion: Year-end closing and month-end closing for the
previous month must be run. It will no longer be possible to post into the old structures once the Conversion has
been done. Adjustment postings only to the new tables with the new settings (no reversals with impact on other
modules or sub-ledgers like AA, AP/AR, SD, MM).
In order to improve performance, during finance data migration you can increase the number of parallel jobs in the
Mass Data Framework. At this point in time the whole hardware will be available for Finance Conversion (HANA
and Logistics Conversion are finished).
The SAP S/4HANA conversion might not decrease the database footprint initially, because all the obsolete data is
kept in the system. It is recommended to do a clean up of data after conversion- execute:
▪ Clean up obsolete tables in Finance: report FINS_MIG_OBSOLETE_DB_DEL from SAP Note 2190137
▪ Remove content from obsolete tables in MM-IM: see SAP Note 2569435
▪ Use the obsolete data handling tool in SAP S/4HANA: see SAP Note 2661837
▪ HANA sizing report: see SAP Note 1872170 and refer to FAQ document attached for additional steps.
Application consultant , technical consultants and business people have to work on the data
inconsistencies.
If you consider to accept data inconsistency, consider to also involve auditors in this process.
There is an increased risk of inconsistencies after data conversion projects (for example new GL migration),
New Asset Accounting implementation, SLO projects for additional currencies introduction.
Certain financial transactions, mainly relating to Asset Accounting, if not completely processed, may result in subsequent
errors during the later SI checks and cause SUM execution to stop - resulting in project delays.
Consider blocking asset accounting users and/or transactions after SUM begins its preparation phase to insure success
of all subsequent SUM initiated SI checks.
During the initial SUM SI checks (during the SUM Configuration phase), some discrepancies may be identified as
warnings, and these same issues will cause a hard error when the second SI check (during the SUM Preprocessing
phase) is performed. Care must be taken during this interval to recognize the need for issue resolution before the
second SUM phase. In addition, since this timeframe is occurring during Business Uptime, any new transactions should
also be analyzed to make sure complete processing has occurred to prevent a project stopping error during the second
SUM SI check. See blog for details: https://blogs.sap.com/2018/03/26/sap-s4hana-simplification-item-check-how-to-do-it-right./
Immediately after user lockout, an additional manual SI check may be considered to confirm all FI postings have been
finalized. This additional SI check will proactively identify problems if AA users are allowed to continue performing
transactions during the SUM uptime phase. If the SI check is long running and therefore may impact project timeline,
executing report RAPERB2000 will identify any incomplete depreciation postings. (Note: Depreciation postings must be
completed prior to SUM execution because the depreciation calculation process changes in S/4HANA. Any converted
incomplete postings cannot be easily corrected after moving to a S/4HANA environment).
© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ CUSTOMER 16
Lessons Learned
Project planning aspects: High-level example project plan
DEV: Development System QA: Quality Assurance System PRD: Productive System
Session Focus
System Conversion (without downtime optimization techniques)
Session Objective
Create awareness about particularities of Finance Conversion within SAP S/4HANA Conversion
▪ Conversion Approach
▪ Lessons Learned for Finance
▪ Conversion in Detail/Phases, Check Reports, Finance Table Cleanup After Conversion
▪ Finance Conversion: IMG Activities, Migration Monitor and Error Analysis Navigation
Conversion to SAP S/4 HANA follows a defined process. The following graph gives an overview on
the tools, phases and activities involved in this process.
Prepare Phase Realize Phase
t1,2 t3 t4 t5 t6 t7
Application specific
SUM prepare phase SUM realize phase
follow-on phase SAP S/4HANA
Target Release
Start Release time
Conversion of Accounting
Preparation Phase Preparation Data Activities After
and Migration
Migration Migration
of Customizing
SAP ERP
6.0x Review the relevant Simplification items
Run detailed (manual) Simplification Item (SI) Check General Ledger migration
Prepare Asset Accounting and Material Ledger Asset Accounting migration
Reconcile subledgers with general ledger and standard Controlling migration
consistency checks Material Ledger migration
Period end closing activities
Migration of house bank accounts
Document your posting data
Migration of financial documents to trade finance
Credit management migration
© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ CUSTOMER
Migration of accrual engine data 20
Consistency Checks
Preparation Phase
Start Release
Preparation Phase
Uptime Downtime
Customizing Consistency Checks
Data Quality Check of Customer-Vendor-Integration
Consistency checks of Transactional Data & Totals
manually via SAP ERP standard reports, list of proposed reports (See SAP Note 2332030 for Conversion Guide)
ERP 6.0x
Customizing Consistency Checks Data Quality Check of Customer-Vendor- Consistency checks of Transactional Data
Integration
▪ SAPF190 / TFC_COMPARE_VZ
▪ SimpIifcation Item (SI) check: Report ▪ Pre-conversion check for business
▪ RAABST02 / RAABST01 (SAP Note 2390881)
/SDF/RC_START_CHECK partners is part of the SI check since 1709
▪ RM07MBST/ RM07MMFI
(SAP Note 2399707) release
▪ RGUCOMP4
New in ERP 6.0x ▪ Optional: FAGL_MM_RECON / RFINDEX / RCOPCA44
▪ Please refer to SAP Note 2245333 and 2618023
for error messages and possible solution SAP Note 2755360 - Reconciliation prior (See SAP Blog Post: Consistency checks in Finance)
to S/4HANA Conversion New in ERP 6.0x
▪ Pre-Check Report for migrating to New Asset ▪ FIN_CORR_RECONCILE SAP Note 2896400 - Reconciliation of Asset Accounting
Accounting is part of the SI check since 1809 ▪ FIN_CORR_DISPLAY Inconsistencies in ECC prior to S/4HANA Conversion
release (check the results for element 'Asset New in ERP 6.0x ▪ FIN_AA_CORR_RECONCILE
Accounting' (ID SI2: FIN_AA) ) ▪ FIN_AA_CORR_DISPLAY
SAP Note 2887318 - Analysis and
Correction prior to S/4HANA Conversion
▪ FIN_CORR_MONITOR
© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ CUSTOMER (SAP Note 2956096 for correctable errors) 21
Consistency Checks
During Conversion of Accounting to S/4HANA
Customizing Checks
▪ Check Customizing Settings prior to migration: ▪ Analyze Transactional data ▪ Data Migration checks
Report FINS_MIG_PRECHECK_CUST_SETTNGS ✓ Report FINS_MASS_DATA_MASTER ✓ Executed during migration as a part of Start and Monitor
(SAP Note 2129306) ✓ Executed before start of data migration Data Migration activity (Transaction FINS_MIG_STATUS)
▪ Consistency Check of General Ledger Settings ✓ Can be skipped during productive run
Report FINS_CUST_CONSISTENCY_CHECK ✓ Input for automatic correction of certain New 1909
▪ Check the prerequisites for activating new Asset inconsistencies in the source system
Accounting. Report report FIN_CORR_MIG_ERROR_SFIN SAP KBA 2714344 - Financial data
RACHECK_ACTIVATION_PARVAL (SAP Note 2225322) migration to SAP S/4HANA: Most
frequent Error Messages – Information
and Recommendations
Technical Check of Transaction Data Analyze Transactional Data Check whether all FI documents are
complete and correct
Technical Check of Transaction Data Reconcile Transactional Data BSEG vs. FAGLFLEXA; BSEG bal. Zero;
etc.; find missing BKPF
Enrichment of Data Check of Migrated Documents Cross-check of fields replicated from
BKPF to BSEG, COBK to COEP,
Application Index to BSEG_ADD
Migration of Line Items Check Migration of Accounting E.g. BSEG vs. ACDOCA; compatibility
Documents to Universal Journal Entry views are compared with original values
Migration of Balances Check Migration of Balances View vs. Backup table, e.g. view of
FAGLFLEXT vs.
FAGLFLEXT_BCK
Start Release
Preparation Phase
Uptime
Simplification Item (SI) Check
Pre-check of customizing for FI-AA
Downtime
=
Consistency checks of Transactional Data & Totals –
ERP 6.0x manually via SAP ERP standard reports, list of proposed reports (See SAP Note 2332030 for Conversion Guide)
▪ Start manually
▪ No framework for parallelization
▪ Includes difficult to understand expert reports
= ▪ HANA optimized consistency checks
▪ Checking whole database with all fiscal years
▪ Checks are focused to detect SAP S/4HANA
conversion relevant issues
Impact
▪ In the preparation phase SAP ERP consistency checks are not able to identify all inconsistencies
→ Data correction in SAP S/4HANA conversion is an iterative process
→ Use the S/4HANA checks during a test conversion to clean up your data in the source system
→ There are now available new programs to check and correct data inconsistencies in the area of General Ledger and
Asset Accounting (only checks) . These programs are recommended and they are more comprehensive than the previous
available correction program one based on the input from Analyze transactional data check during test conversion (report
FIN_CORR_MIG_ERROR_SFIN, SAP Note 2225322)
Transaction FIN_CORR_RECONCILE
Transaction FIN_CORR_DISPLAY
Transaction FIN_CORR_MONITOR
© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ CUSTOMER 26
Finance Migration Preparation Phase
Check and correct your finance data prior to conversion – Asset Accounting
Transaction FIN_AA_CORR_RECON
Transaction FIN_AA_CORR_DISPLAY
Describes how customer can reduce the database memory footprint caused by obsolete tables of
several financials application components after data migration to SAP S/4HANA Finance or
conversion to SAP S/4HANA.
Session Focus
System Conversion (without downtime optimization techniques)
Session Objective
Create awareness about particularities of Finance Conversion within SAP S/4HANA Conversion
▪ Conversion Approach
▪ Lessons Learned for Finance
▪ Conversion in Detail/Phases, Check Reports, Finance Table Cleanup After Conversion
▪ Finance Conversion: IMG Activities, Migration Monitor and Error Analysis Navigation
Downtime Uptime
No postings allowed
Migration completed
Data Migration
▪ Required to be done in each system
▪ No postings allowed during these steps
Downtime Uptime
No postings allowed
Migration completed
Conversion of Accounting to SAP S/4HANA
▪ All the migration activities and documentation are in the IMG
▪ Perform activities in the right sequence
▪ Do not skip any customizing activities
▪ Finance migration has to be executed per client
▪ All company codes are migrated
– Mark company codes as template to disable checks with
FINSC_CO_CD_TEMPLATE: SAP Note 2159452
▪ SAP Note 2522155 for Company Code Specific Conversion with SAP LT
▪ Conversion from start release SAP Simple Finance, SAP S/4HANA Finance or
SAP S/4HANA 1511: SAP Note 2450377
© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ CUSTOMER 33
Conversion to S/4HANA on SAP Help
https://help.sap.com/viewer/p/SAP_S4HANA_ON-PREMISE
Application-Specific Preparations
and Follow-On Activities :
Converting Accounting Components
to S/4HANA Guide attached to note
2332030 for FI Conversion.
Overview
▪ Start and monitor migration
– Transactional data is transformed into the new data model of the
universal journal (SAP Note 2408083 - FAQ: Data Model of S/4HANA
Finance Data Migration)
– Secondary cost elements are merged into the G/L account master data
▪ As of S/4HANA 1909 FPS01, IMG activity "Transport Accepted Error
Messages" is available
▪ Migrate SD-FT Financial documents to Letters of Credit in TRM
– Financial document master data
– Assignment of sales orders to financial documents
– Risk Check Decisions for the blocked sales documents
▪ Migrate SD Credit management (FI-AR) to S/4HANA Credit
Start
management (FIN-FSCM-CR) Enhanced
1909
– Credit control customer master data(risk category, limit) FPS01
Transaction FINS_MIG_STATUS
Double-click at any conversion
step (e.g. R21)
Monitor Migration
New 1909
Monitor Migration
Migration completion
Overview
Transports Transports
DEV QAS PRD Corrections
System Copy
3
Knowing how to interpret the results of
Consistency Check Reports
2
Knowing how to correctly
execute Consistency Check Reports
1
Having a list of Consistency Check
Reports
Conclusion
• Test cycles should be done at high SPS with the corresponding HANA Revision
• You should check SAP KBA 2714344 - Financial data migration to SAP S/4HANA: Most
frequent Error Messages – Information and Recommendations
Application Component
FI-GL FI-GL-GL-X
FI-AA FI-AA-AA
MM MM-IM-GF-INC
CO CO-OM
FIN Migration FIN-MIG
FIN Migration FI-AA FIN-MIG-AA
FIN Migration CO FIN-MIG-CO
FIN Migration FI-GL FIN-MIG-GL
FIN Migration ML FIN-MIG-ML