Winter Question Paper
Winter Question Paper
14115
MARKS
c) The plinth area of a proposed building is 390 sq. m. The known cost of
construction for similar structure is Rs. 19,35,000 having plinth area
215 sq. m. Calculate approximate cost of proposed building.
P.T.O.
17501 -2- *17501*
MARKS
c) The formation level of a road at starting point is 470.00 m. The road surface
shall be falling gradient line of 1 to 60. Formation width of the road is 12 m,
side slope 1 : 2 in embankment and 1 : 1.5 in cutting :
C h a i n a g e i n m 0 3 0 6 0 9 0 1 2 0 1 5 0
R . C . o f G . L . i n m 4 6 6 . 5 0 4 6 7 . 2 0 4 6 8 . 1 0 4 6 8 . 2 0 4 6 9 . 7 0 4 6 9 . 0 0
Calculate the quantity of earth work for road using mean sectional area method.
*17501* -3- 17501
MARKS
c) Define :
i) Task work
i) Sand
ii) 12 mm steel
4. A) Workout quantities of following any three items of work from Fig. No. 1 : 12
c) Internal plastering.
MARKS
Fig. No. 1
Q. No. 4A
*17501* -5- 17501
MARKS
a) A R.C.C. beam 300 mm wide and 450 mm deep and length 5000 mm is
reinforced with 4 number of 12 mm
bar placed in one row, out of 4,
2 bars are straight and 2 bars are bent up respectively. In addition to this,
2 anchor bars of 10 mm diameter are provided at top. 6 mm
stirrups are
provided at 150 mm C/C. The overall cover provided to the beam is
25 mm. Calculate the total quantity of steel and also prepare bar bending
schedule.
c) Workout the quantity of following items for septic tank having internal size
1.8 m × 4.2 m and height 1.6 m. The top of slab of septic tank is 20 cm above G.L.
MARKS
b) Describe long wall and short wall method for calculating quantities of items
of work.
_______________