0% found this document useful (0 votes)
27 views8 pages

Winter Question Paper

Uploaded by

ARTI KARNUKE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views8 pages

Winter Question Paper

Uploaded by

ARTI KARNUKE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

*17501* 17501

14115

4 Hours/100 Marks Seat No.

Instructions : (1) All questions are compulsory.


(2) Answer each next main question on a new page.
(3) Illustrate your answers with neat sketches wherever
necessary.
(4) Figures to the right indicate full marks.
(5) Assume suitable data, if necessary.

MARKS

1. A) Attempt any three of the following : 12

a) State any four purposes of detailed estimate.

b) Enlist the types of approximate estimate. Explain service unit method of


approximate estimate.

c) The plinth area of a proposed building is 390 sq. m. The known cost of
construction for similar structure is Rs. 19,35,000 having plinth area
215 sq. m. Calculate approximate cost of proposed building.

d) State modes of measurement for following items of work :


i) Iron gate
ii) Wood work for door frame
iii) Pointing
iv) Skirting.

P.T.O.
17501 -2- *17501*
MARKS

B) Attempt any one of the following : 6


a) State the rules of deductions as per IS 1200 for
i) Plastering
ii) Masonry work in super structure.
b) Explain the following terms :
i) Provisional sum
ii) Prime cost
iii) Day work.

2. Attempt any two of the following : 16

a) Describe the procedure for preparing approximate estimate of a water supply


project.

b) Prepare approximate estimate from following data for a school building :


i) Number of classroom – 12
ii) Area of each classroom – 50 m2
iii) Area of other facilities – 150 m2
Similar school building having same specification and having built up area of
750 m2 was constructed at Rs. 71,25,000.

c) The formation level of a road at starting point is 470.00 m. The road surface
shall be falling gradient line of 1 to 60. Formation width of the road is 12 m,
side slope 1 : 2 in embankment and 1 : 1.5 in cutting :

Assume there is no cross slope to the ground.

C h a i n a g e i n m 0 3 0 6 0 9 0 1 2 0 1 5 0

R . C . o f G . L . i n m 4 6 6 . 5 0 4 6 7 . 2 0 4 6 8 . 1 0 4 6 8 . 2 0 4 6 9 . 7 0 4 6 9 . 0 0

Calculate the quantity of earth work for road using mean sectional area method.
*17501* -3- 17501
MARKS

3. Attempt any four of the following : 16

a) State the desired accuracy in taking measurement of work as per IS 1200.

b) State necessity of rate analysis.

c) Define :

i) Task work

ii) Lead and lift.

d) Give market rates for following materials :

i) Sand

ii) 12 mm steel

iii) Oil paint

iv) Cement bag.

e) Enlist any eight softwares available for civil engineering estimate.

4. A) Workout quantities of following any three items of work from Fig. No. 1 : 12

a) Excavation for foundation.

b) Brickwork in super structure in C.M. (1 : 6).

c) Internal plastering.

d) R.C.C. for slab (1 : 2 : 4).


17501 -4- *17501*

MARKS

Fig. No. 1
Q. No. 4A
*17501* -5- 17501
MARKS

B) Attempt any one of the following : 6

a) A R.C.C. beam 300 mm wide and 450 mm deep and length 5000 mm is
reinforced with 4 number of 12 mm 
bar placed in one row, out of 4,
2 bars are straight and 2 bars are bent up respectively. In addition to this,
2 anchor bars of 10 mm diameter are provided at top. 6 mm 
stirrups are
provided at 150 mm C/C. The overall cover provided to the beam is
25 mm. Calculate the total quantity of steel and also prepare bar bending
schedule.

b) Calculate the quantity of cement, sand and course aggregate for 80 m3


cement concrete having proportion (1 : 1.5 : 3).

5. Attempt any two of the following : 16

a) Prepare rate analysis for R.C.C. (1 : 2 : 4).

b) Prepare rate analysis for brickwork in super structure in c.m. (1 : 6) proportion.

c) Workout the quantity of following items for septic tank having internal size
1.8 m × 4.2 m and height 1.6 m. The top of slab of septic tank is 20 cm above G.L.

i) Earth work in excavation.

ii) P.C.C. (1 : 3 : 6) – (15 cm thick).

iii) B. B. Masonry in c.m. (1 : 6) proportion (300 mm thick).

iv) R. C. C. slab (1 : 2 : 4) on septic tank 12 cm thick.


17501 -6- *17501*

MARKS

6. Attempt any four of the following : 16

a) Draw standard format of measurement sheet and abstract sheet.

b) Describe long wall and short wall method for calculating quantities of items
of work.

c) Calculate the quantity of excavation and enter in standard measurement


sheet with brief description of item of work for community well as shown in
Fig. No. 2.

d) Calculate the quantity of brickwork and enter in standard measurement sheet


with brief description of item of work for community well as shown in Fig. No. 2.

e) Calculate the quantity of standard flooring and enter in standard measurement


sheet with brief description of item of work for community well as shown in
Fig. No. 2.
*17501* -7- 17501
MARKS

Section of Community Well


Fig No. 2 Q. No. 6
(Fig. Not to Scale)