Tech Specs
Tech Specs
Tech Specs
The following terms may be encountered in this specification document and shall be
interpreted as follows:
Hz - Hertz
kW (MW) - kilowatt (megawatt)
VA, (kVA, MVA) - volt-ampere (kilovolt-ampere, megavolt-ampere)
A (kA) - Ampere (kiloAmpere)
V (kV) - Volt (kiloVolt)
AC - Alternating Current
DC - Direct Current
IN - Nominal current
UN - Nominal voltage
Ah - Ampere-Hours
Min/(Max.) - Minimum (Maximum)
µ (prefix) micro -
n (prefix) nano -
rms - Root Mean Square
p.u. - per unit
p/p - peak to peak
F - Farad
°C - degrees centigrade
K - kelvin
J - Joules
N - Newton
Ω (kΩ, TΩ) - Ohms (kilo-ohms, Tera-ohms)
Nm - Newton meter
Pa, - Pascal, Newton per square meter
Bar - 1 bar 0.1MPa
IEC - International Electro-technical Commission
IP - Ingress Protection
EMC - Electromagnetic Compatibility
RTU - Remote Terminal Unit
TCP/IP - Transmission Communication Protocol/ Internet Protocol
LAN - Local Area Network
IED - Intelligent Electronic Device
LED - Light Emitting Diode
Page 16 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
2.3.1 SCOPE
The scope covers the design, manufacture, supply and delivery of twenty (20) pre-wired
protection and control panels. The supply requirements for the protection and control panels
are as follows:
The electrical system in which the protection and control relays installed on the above
mention panels will be used in is:
• Three phase 3 wire AC overhead-line and underground system at 400kV, 330kV, 220kV,
132kV, 110kV, 88kV, 66kV 33kV and 11kV.
• Three phase-4 wire AC Low voltage of 390V
• Secondary system is at 110V and 1A AC nominal values.
• Control system at 110V DC.
• AC system operated at 50 Hz, with approximately sinusoidal waveform with the frequency
variation not exceeding 2.5% from 50Hz. Designs should allow for these variations.
• The highest system voltage not normally exceeding the nominal system voltage by more
than 10%. The nominal system voltages are 400kV, 330kV, 132kV, 110kV, 88kV, 66kV,
33kV and 11kV.
Page 17 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
The altitudes of the plants shall be taken as 1500 meters above mean sea level typical air
pressure 860 mbar.
The protection and control relays should be capable of being used under the following
environmental conditions.
• Ambient temperatures:
(i) Maximum: 50 °C
• Altitude:
Humidity:
Relative Humidity of 80%.
• Dust:
Particular attention should be paid in the design of all equipment to ensure that there
is no damage to insulation through the ingress of dust, insects, and vermin and
relevant IP standards should be followed.
IEC 60255, IEC 61850 and IEC 60529, standards. In the case of conflict between the
above stated standards and this specification, the ruling of this specification shall prevail.
Page 18 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
The pre-wired protection and control panels shall be used on the transmission and sub-
transmission circuits on the ZETDC power network. The installed protection and control
relays should provide maximum protection for ZETDC power circuits.
2.4.1 All equipment specified in this specification shall be new, free from defects, of finest
quality, and produced by manufacturers engaged in the manufacture of these
products.
2.4.2 All the hardware and software supplied must be of most recent technology and be in
the supplier’s product line. Equipment must be fully supported by the product
supplier at time of delivery and must remain on the manufacturer’s list of supported
products for at least 5 years from date of delivery.
2.4.3 Relays shall be fully numerical microprocessor based complying with IEC 60255.
They shall have approved characteristics and be flush mounted draw out type in dust
proof cases. The relay operating time should not exceed 30ms. All relays shall have
self-supervision and self-monitoring facilities.
2.4.4 All protection functions in the relays to be supplied shall be freely configurable.
2.4.5 At least five years of proven field experience for the protection relay types is required.
2.4.6 The protection and control relays shall be of robust type, insensitive to changes of
temperature, vibration, dustproof etc.
2.4.8 Output contacts shall make firmly without bounce and the whole of the relay
mechanisms shall be unaffected by vibration or external magnetic fields.
2.4.9 All of the installed protection and control relays must be engineered for IEC 61850
integration.
2.4.10 MATERIAL
The protection and control panels alongside the installed accessories shall be of superior
quality. The material shall be of latest design and conform to the best engineering practices
adopted in the field.
2.4.11 PACKING
The packing should be able to withstand rough handling during transit of material at various
destinations. Each pre-wired protection and control panel shall be packed appropriately to
prevent damage.
Page 19 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Dielectric tests.
EMC tests.
Mechanical tests.
2.4.13 TRAINING
Training on the supplied relays shall be provided to the Engineers through transfer of
technical knowledge in English.
Training shall include classroom training, instruction and explanation or onsite
demonstrations concerning the commissioning, operation and maintenance of the
protection and control relays supplied.
5.6.3 The training shall be performed by qualified English speaking personnel.
5.6.4 The training program and the competencies of the trainer(s) shall be subject
to approval by ZETDC.
5.6.5 The training courses shall be designed to:
Enable Engineers to configure and calculate settings for the protection relays/IEDs.
Enable Engineers and Technicians to use the application software to interrogate the
IEDs.
Enable Engineers and Technicians to carry out commissioning and routine testing of
the IEDs.
Enable Engineers and Technicians to interrogate the IEDs from the Human User
Interface.
Training documentation;
Documentation shall be provided covering each course to a level of detail so that the
text is self-explanatory and sufficient as future reference.
Prior to the start of a course, each trainee shall receive at least one (1) set of
documentation covering that course.
ZETDC shall be given adequate notice prior to the training, at least one week
notice prior to date of commencement of the training
Page 20 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
The winning bidder shall design, manufacture, supply and deliver 20 fully
dressed protection and control panels as guided by this specification. The 20 panels
shall include:
10 x Main 1 Protection and control Panels with Main 1 protection relay,
10 x Main 2 Protection and control Panels with Main 2 protection relay and a Bay
Control Unit.
Main 1 and Main 2 relays shall be of different makes/manufacturers.
The supplier shall provide engineering tools including but not limited to, application
software, 2 laptops and accessories for installation, commissioning and maintenance
of the relays
The supplier shall provide all the engineering manuals for installation, commissioning
and maintenance.
The supplier shall make provision for FAT of the protection and control system for
two ZETDC engineers.
The Protection Relays shall be engineered for IEC 61850 communication.
Design the protection drawings as guided by ZETDC. The protection philosophy and
system parameters required shall be provided by ZETDC. All protection and control
drawings shall be produced in AutoCAD format
Training shall be provided to at least 15 Engineers upon delivery.
Page 21 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Please complete this schedule by stating the actual tendered specification and sign as
indicated.
Important Note: The panel is to be supplied with at least the following equipment
installed:
Page 22 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Reference
document
Tendered Remarks page (e.g.
ZETDC Found on
Item Description Unit
Requirement page 3,
section 3.1 of
brochure/data
sheet/manual/
drawing etc.)
ENCLOSURE
3. OVERAL DIMENSIONS -
Length 800mm
4. Width 800mm
Height - 2200mm
5.
ACCESS
Rear Access
6.
Hind Access door,
Relays mounted on
fixed front panel
and flush mounted.
7.
Shall be fitted with
glazed front door to
cover the front
panel.
Doors shall be
provided with
8.
integral handles for
locking
It shall be possible
9. to securely fix the
Page 23 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Page 27 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Page 28 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Please complete this schedule by stating the actual tendered specification and sign as
indicated.
Reference
document
Tendered Remarks page (e.g.
ZETDC Found on
Item Description Unit
Requirement page 3,
section 3.1 of
brochure/data
sheet/manual/
drawing etc.)
1. Relay Type - Numeric
3. Frequency Hz 50
4. Rotation - ABC
ENVIRONMENTAL
CONDITIONS
5. Operating ˚C -5 to +55
temperature range
Degree of protection - At least IP 30
6. by enclosure when
panel-mounted
Page 29 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Page 30 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
GENERAL
Voltage transformer
supervision
Definite Time And At least three, four-
Inverse Time step overcurrent
Overcurrent elements per group
Protection (functions shall be included to
30. -
50/51) provide phase,
negative-sequence
and residual
protection.
Definite time and At least three, four-
31. Inverse Time Earth step ground fault
Page 32 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
CONTROL
FUNCTIONS
Control and Apparatus control
Interlocks for a complete
transformer bay
with at least five (5)
switches. Ready to
36.
use interlocking
modules for
different switchgear
arrangements
Based on Select-
37. Before-Operate
Principle
Selection and
38. reservation function
Page 33 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Page 34 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Page 35 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Page 36 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Please complete this schedule by stating the actual tendered specification and sign as
indicated.
Corresponding
reference page
ZETDC in spec sheet
Item Description Unit Tendered (e.g. found on
Requirement Remarks page 3,
section 3.2
paragraph/line
etc.)
1. Relay Type - Numeric
3. Frequency Hz 50
4. Rotation - ABC
ENVIRONMENTAL
CONDITIONS
Operating ˚C -5 to +55
5. temperature range
Degree of - At least IP 30
6. protection by
Page 37 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
AC INPUT
CURRENTS
Nominal current, A 1A, 3phase,
8.
Continuous A ≥3x
9. withstand
Short time A ≥ 10 x for 1s
10. withstand
AC INPUT
VOLTAGES
Nominal Voltage, 110VAC phase to
11. V phase
Continuous ≥1.5 x
12. withstand V
Short time ≥2x for 1s
13. withstand V
TRIP OUTPUTS
Page 38 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Page 40 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Page 41 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
CONTROL
FUNCTIONS
Control and Apparatus control
Interlocks for a complete
feeder bay with 5
switches.
41. Ready to use
interlocking
modules for
different switchgear
arrangements
Page 42 of 49
STANDARD BIDDING DOCUMENT FOR THE DESIGN, MANUFACTURE, SUPPLY AND
DELIVERY 0F 20 PRE-WIRED 330KV PROTECTION CONTROL PANELS
Based on Select-
42. Before-Operate
Principle
Selection and
reservation function
43. to prevent
simultaneous
operation
Selection and
44. supervision of
operator place
Command
45. supervision
Blocking and
46. deblocking of
operation
Blocking and
deblocking of
47.
updating of position
indications
Overriding of
48. interlocking
functions
Overriding of
49. synchro check
Pole discordance
50. supervision
Pole discordance
51. supervision
Synchronising or
52. synchro-check
facility
Trip circuit Trip circuit
Supervision supervision for two
53.
(2) coils.
Page 43 of 49