How To Develop A Baseline Schedule in Construction

Uploaded by

Edinen Udofia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

HOW TO DEVELOP A BASELINE

SCHEDULE IN CONSTRUCTION
PROJECTS
A Step-by-Step Approach to Effective Project Scheduling

© Pragmatic Project Consilium


WHY?

 A baseline schedule is a key project


management tool that defines the
project's timeline. This presentation
outlines the steps to develop a reliable
baseline schedule for construction
projects.

© Pragmatic Project Consilium


1. DEFINE THE PROJECT SCOPE

 Start by identifying all project


deliverables and objectives. Ensure
clarity on the scope to accurately plan
and schedule tasks.

© Pragmatic Project Consilium


2. BREAK  Use the Work Breakdown Structure (WBS) to
decompose the project into manageable
DOWN WORK tasks. The WBS ensures that all tasks are
WITH WBS accounted for in the schedule.

© Pragmatic Project Consilium


3.  Determine the logical sequence of activities. Use
SEQUENCE techniques like the Critical Path Method (CPM)
to identify the order and dependencies of tasks.
ACTIVITIES

© Pragmatic Project Consilium


4. ESTIMATE DURATIONS

 Estimate the duration of each activity.


Take into account resources,
environmental conditions, and
potential risks that might impact the
timeline.

© Pragmatic Project Consilium


5. ASSIGN  Assign the necessary resources to each task, including
labor, equipment, and materials. Ensure resource
RESOURCES availability aligns with the project schedule.

© Pragmatic Project Consilium


6. DEVELOP THE SCHEDULE

 Using scheduling software, develop the


project timeline by integrating all
tasks, durations, and resources. Ensure
the schedule aligns with project
milestones and deadlines.

© Pragmatic Project Consilium


 Review the schedule to identify potential
7. REVIEW AND bottlenecks or conflicts. Optimize the
timeline by adjusting task sequences,
OPTIMIZE resources, and durations to meet the project
goals.

© Pragmatic Project Consilium


8. FINALIZE AND APPROVE THE
BASELINE
 Once optimized, finalize the baseline
schedule. Get approval from key
stakeholders, ensuring the schedule
aligns with contract requirements and
project expectations.

© Pragmatic Project Consilium


FOR CLAIMS ADVISORY
SERVICES

Contact : www.pragmaticpc.com
[email protected]
[email protected]

© Pragmatic Project Consilium