0% found this document useful (0 votes)
18 views1 page

Pending Approvals

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Pending Approvals

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Dr. No. Drg. Title DOS Rev.

PRS-C- J125 Arch. Schedules for wet ball mill building 4/10/2024 R1
PRS-C- J116 Analysis and design of ECR building 4/6/2024 R3
PRS-C- J117 Foundation layout and details of ECR building 4/6/2024 R3
PRS-C- J118 Structural layout and details of ECR building 4/6/2024 R2
PRS-C- J105 Layout and details of gas duct from absorber to 4/8/2024 R1
chimney
PRS-C- J108 Analysis and design of gas duct, duct supports and 4/8/2024 R1
foundations from absorber to chimney

You might also like