REQUEST FOR INSPECTION (RFI)

PROJECT :
SERONGGA (KELUMPANG HILIR) COAL TERMINAL
KOTA BARU, KALIMANTAN SELATAN

Doc No. : WRK-QAS-RFI-SRG-090-


Date :
Submitted By : PT.WIKA REKAYASA KONTRUKSI
Attn. :
To : PT.DUA SAMUDRA PERKASA

Attn : GENDIS.P

Dear Sirs,

We would to have your presence for inspection according to the following schedule.
Please be informed that the following items are in order and are ready for inspection/witness.

Date & Time

Location

Inspection Item

Element

Sub Item / Reference Date / Time of Inspection

Comments :

Acceptable, you may proceed WITH/WITHOUT our attendance.

Please reschedule the witness/inspection date

Not acceptable, you shall rectify item and resubmit request for inspection

Others :

Name / Signature of PT.DSP : Date / Time :

Name / Signature of PT.WRK : Date / Time :

Name / Signature of Subcont / Vendor : Date / Time :


PROYEK PEKERJAAN GUDANG PUPUK KAPASITAS 15000 TON
BATULICIN, KALIMANTAN SELATAN

DATA SURVEY

Subject
Date
Location
Surveyor

ELEVATION DISTANCE
No. POINT BM BS FS HI REMARKS
BEFORE AFTER (mm)

Note :

PT. KODECO ARGOJAYA MANDIRI PT. WIJAYA KARYA REKAYASA KONSTRUKSI


APPROVED BY. APPROVED BY. REVIEWED BY. PREPARED BY.
Print Name

Signature

Date
PROYEK PEKERJAAN PENUTUP VOID CONCRETE JETTY 1500 DWT
BATULICIN, KALIMANTAN SELATAN

DATA SURVEY

Subject
Date
Location
Surveyor

ELEVATION DISTANCE
No. POINT BM BS FS HI REMARKS
BEFORE AFTER (mm)

Note :

PT. DUA SAMUDERA PERKASA PT. WIJAYA KARYA REKAYASA KONSTRUKSI


APPROVED BY. APPROVED BY. REVIEWED BY. PREPARED BY.
Print Name

Signature

Date
PROYEK PEMBANGUNAN COAL TERMINAL CAP 2 x
12 MTPY
BATULICIN, KALIMANTAN SELATAN

DOKUMENTASI PRE - POURING STG-QAS-ISP-045-056


INSPEKSI
Pre-
Pouring Concrete
Doc. No. : STG-QAS-ISD-01-008 Q 045

Subject Inspeksi Pre-Pouring Concrete Date


Service No. Bypass Hopper Line 1A F3 (fc28) Inspection No. STG-QAS-ISP-045-009
Location Line 1 Revision No.
Sub-Cont. Ref. Drawing No. WRK/C/DD/02

Accepted
NO INSPECTION ITEM Date Sign Remark
Yes No
1 Diameter & quantity of rebar

2 Diameter & distance of Stirrup

3 Ties at Rebar

4 Overlap Splaccing

5 Concrete Cover / Conrete decking


Installation of embedded all ( anchor bolts,
6 pipes, angle, insert plates etc )
7 Ikatan kawat bendrat

8 Material quality (shape & surface)

9 Dimension ( Widht, length, height)

10 Shoring & support

11 Tiltness of the vertical tolerance

12 Straightness of line of the formwork

13 Elevation (Top Cor)

14 Koordinat

15 Rectangularity of formwork

16 Form Oil Usage

17 Cleanliness

Note :

PT. WIKA REKAYASA KONSTRUKSI PT. DUA SAMUDERA PERKASA


PREPARED BY. CHEKED BY. APPROVED BY.

Print Name

Signature

Date
INSPEKSI
Pre-
Pouring Concrete
Doc. No. : STG-QAS-ISD-01-008 Q 045

Subject Inspeksi Pre-Pouring Concrete Date 07 Agustus 2022


Service No. Dump Hopper Line 1 A (fc28) Inspection No. STG-QAS-ISP-045-010
Location Line 1 Revision No.
Sub-Cont. Ref. Drawing No. WRK/C/DD/02

Accepted
NO INSPECTION ITEM Date Sign Remark
Yes No
1 Diameter & quantity of rebar

2 Diameter & distance of Stirrup

3 Ties at Rebar

4 Overlap Splaccing

5 Concrete Cover / Conrete decking


Installation of embedded all ( anchor bolts,
6 pipes, angle, insert plates etc )
7 Ikatan kawat bendrat

8 Material quality (shape & surface)

9 Dimension ( Widht, length, height)

10 Shoring & support

11 Tiltness of the vertical tolerance

12 Straightness of line of the formwork

13 Elevation (Top Cor)

14 Koordinat

15 Rectangularity of formwork

16 Form Oil Usage

17 Cleanliness

Note :

PT. WIKA REKAYASA KONSTRUKSI PT. DUA SAMUDERA PERKASA


PREPARED BY. CHEKED BY. APPROVED BY.

Print Name

Signature

Date
INSPEKSI
Pre-
Pouring Concrete
Doc. No. : STG-QAS-ISD-01-008 Q 045

Subject Inspeksi Pre-Pouring Concrete Date 11 Agustus 2022


Service No. Bypass Hopper Line 1A F5 (fc28) Inspection No. STG-QAS-ISP-045-011
Location Line 1 Revision No.
Sub-Cont. Ref. Drawing No. WRK/C/DD/02

Accepted
NO INSPECTION ITEM Date Sign Remark
Yes No
1 Diameter & quantity of rebar

2 Diameter & distance of Stirrup

3 Ties at Rebar

4 Overlap Splaccing

5 Concrete Cover / Conrete decking


Installation of embedded all ( anchor bolts,
6 pipes, angle, insert plates etc )
7 Ikatan kawat bendrat

8 Material quality (shape & surface)

9 Dimension ( Widht, length, height)

10 Shoring & support

11 Tiltness of the vertical tolerance

12 Straightness of line of the formwork

13 Elevation (Top Cor)

14 Koordinat

15 Rectangularity of formwork

16 Form Oil Usage

17 Cleanliness

Note :

PT. WIKA REKAYASA KONSTRUKSI PT. DUA SAMUDERA PERKASA


PREPARED BY. CHEKED BY. APPROVED BY.

Print Name

Signature

Date
INSPEKSI
Pre-
Pouring Concrete
Doc. No. : STG-QAS-ISD-01-008 Q 045

Subject Inspeksi Pre-Pouring Concrete Date 11 Agustus 2022


Service No. Pile Cap Radial Staker Line 1A (fc28) Inspection No. STG-QAS-ISP-045-012
Location Line 1 Revision No.
Sub-Cont. Ref. Drawing No. WRK/C/DD/02

Accepted
NO INSPECTION ITEM Date Sign Remark
Yes No
1 Diameter & quantity of rebar

2 Diameter & distance of Stirrup

3 Ties at Rebar

4 Overlap Splaccing

5 Concrete Cover / Conrete decking


Installation of embedded all ( anchor bolts,
6 pipes, angle, insert plates etc )
7 Ikatan kawat bendrat

8 Material quality (shape & surface)

9 Dimension ( Widht, length, height)

10 Shoring & support

11 Tiltness of the vertical tolerance

12 Straightness of line of the formwork

13 Elevation (Top Cor)

14 Koordinat

15 Rectangularity of formwork

16 Form Oil Usage

17 Cleanliness

Note :

PT. WIKA REKAYASA KONSTRUKSI PT. DUA SAMUDERA PERKASA


PREPARED BY. CHEKED BY. APPROVED BY.

Print Name

Signature

Date
INSPEKSI
Pre-
Pouring Concrete
Doc. No. : STG-QAS-ISD-01-008 Q 045

Subject Inspeksi Pre-Pouring Concrete Date 15 Agustus 2022


Service No. Pile Cap BC05 Line 1A/Transfer Tower (fc28) Inspection No. STG-QAS-ISP-045-013
Location Line 1 Revision No.
Sub-Cont. Ref. Drawing No. WRK/C/DD/02

Accepted
NO INSPECTION ITEM Date Sign Remark
Yes No
1 Diameter & quantity of rebar

2 Diameter & distance of Stirrup

3 Ties at Rebar

4 Overlap Splaccing

5 Concrete Cover / Conrete decking


Installation of embedded all ( anchor bolts,
6 pipes, angle, insert plates etc )
7 Ikatan kawat bendrat

8 Material quality (shape & surface)

9 Dimension ( Widht, length, height)

10 Shoring & support

11 Tiltness of the vertical tolerance

12 Straightness of line of the formwork

13 Elevation (Top Cor)

14 Koordinat

15 Rectangularity of formwork

16 Form Oil Usage

17 Cleanliness

Note :

PT. WIKA REKAYASA KONSTRUKSI PT. DUA SAMUDERA PERKASA


PREPARED BY. CHEKED BY. APPROVED BY.

Print Name

Signature

Date
INSPEKSI Pre-
Pouring Concrete
Doc. No. : STG-QAS-ISD-01-008 Q 045

Subject Inspeksi Pre-Pouring Concrete Date 01 Agustus 2022


Service No. Primary Crusher 1A Inspection No. STG-QAS-ISP-045-008
Location Line 1 Revision No.
Sub-Cont. Ref. Drawing No. WRK/C/DD/02

Accepted
NO INSPECTION ITEM Date Sign Remark
Yes No
1 Diameter & quantity of rebar

2 Diameter & distance of Stirrup

3 Ties at Rebar

4 Overlap Splaccing

5 Concrete Cover / Conrete decking


Installation of embedded all ( anchor bolts,
6 pipes, angle, insert plates etc )
7 Ikatan kawat bendrat

8 Material quality (shape & surface)

9 Dimension ( Widht, length, height)

10 Shoring & support

11 Tiltness of the vertical tolerance

12 Straightness of line of the formwork

13 Elevation (Top Cor)

14 Koordinat

15 Rectangularity of formwork

16 Form Oil Usage

17 Cleanliness

Note :

PT. WIKA REKAYASA KONSTRUKSI PT. DUA SAMUDERA PERKASA


PREPARED BY. CHEKED BY. APPROVED BY.

Print Name

Signature

Date
INSPEKSI Pre-
Pouring Concrete
Doc. No. : STG-QAS-ISD-01-008 Q 045

Subject Inspeksi Pre-Pouring Concrete Date 01 Agustus 2022


Service No. Primary Crusher 1A Inspection No. STG-QAS-ISP-045-008
Location Line 1 Revision No.
Sub-Cont. Ref. Drawing No. WRK/C/DD/02

Accepted
NO INSPECTION ITEM Date Sign Remark
Yes No
1 Diameter & quantity of rebar

2 Diameter & distance of Stirrup

3 Ties at Rebar

4 Overlap Splaccing

5 Concrete Cover / Conrete decking


Installation of embedded all ( anchor bolts,
6 pipes, angle, insert plates etc )
7 Ikatan kawat bendrat

8 Material quality (shape & surface)

9 Dimension ( Widht, length, height)

10 Shoring & support

11 Tiltness of the vertical tolerance

12 Straightness of line of the formwork

13 Elevation (Top Cor)

14 Koordinat

15 Rectangularity of formwork

16 Form Oil Usage

17 Cleanliness

Note :

PT. WIKA REKAYASA KONSTRUKSI PT. DUA SAMUDERA PERKASA


PREPARED BY. CHEKED BY. APPROVED BY.

Print Name

Signature

Date
INSPEKSI Pre-
Pouring Concrete
Doc. No. : STG-QAS-ISD-01-008 Q 045

Subject Inspeksi Pre-Pouring Concrete Date 01 Agustus 2022


Service No. Primary Crusher 1A Inspection No. STG-QAS-ISP-045-008
Location Line 1 Revision No.
Sub-Cont. Ref. Drawing No. WRK/C/DD/02

Accepted
NO INSPECTION ITEM Date Sign Remark
Yes No
1 Diameter & quantity of rebar

2 Diameter & distance of Stirrup

3 Ties at Rebar

4 Overlap Splaccing

5 Concrete Cover / Conrete decking


Installation of embedded all ( anchor bolts,
6 pipes, angle, insert plates etc )
7 Ikatan kawat bendrat

8 Material quality (shape & surface)

9 Dimension ( Widht, length, height)

10 Shoring & support

11 Tiltness of the vertical tolerance

12 Straightness of line of the formwork

13 Elevation (Top Cor)

14 Koordinat

15 Rectangularity of formwork

16 Form Oil Usage

17 Cleanliness

Note :

PT. WIKA REKAYASA KONSTRUKSI PT. DUA SAMUDERA PERKASA


PREPARED BY. CHEKED BY. APPROVED BY.

Print Name

Signature

Date
INSPEKSI Pre-
Pouring Concrete
Doc. No. : STG-QAS-ISD-01-008 Q 045

Subject Inspeksi Pre-Pouring Concrete Date 01 Agustus 2022


Service No. Primary Crusher 1A Inspection No. STG-QAS-ISP-045-008
Location Line 1 Revision No.
Sub-Cont. Ref. Drawing No. WRK/C/DD/02

Accepted
NO INSPECTION ITEM Date Sign Remark
Yes No
1 Diameter & quantity of rebar

2 Diameter & distance of Stirrup

3 Ties at Rebar

4 Overlap Splaccing

5 Concrete Cover / Conrete decking


Installation of embedded all ( anchor bolts,
6 pipes, angle, insert plates etc )
7 Ikatan kawat bendrat

8 Material quality (shape & surface)

9 Dimension ( Widht, length, height)

10 Shoring & support

11 Tiltness of the vertical tolerance

12 Straightness of line of the formwork

13 Elevation (Top Cor)

14 Koordinat

15 Rectangularity of formwork

16 Form Oil Usage

17 Cleanliness

Note :

PT. WIKA REKAYASA KONSTRUKSI PT. DUA SAMUDERA PERKASA


PREPARED BY. CHEKED BY. APPROVED BY.

Print Name

Signature

Date
INSPEKSI Pre-
Pouring Concrete
Doc. No. : STG-QAS-ISD-01-008 Q 045

Subject Inspeksi Pre-Pouring Concrete Date 01 Agustus 2022


Service No. Primary Crusher 1A Inspection No. STG-QAS-ISP-045-008
Location Line 1 Revision No.
Sub-Cont. Ref. Drawing No. WRK/C/DD/02

Accepted
NO INSPECTION ITEM Date Sign Remark
Yes No
1 Diameter & quantity of rebar

2 Diameter & distance of Stirrup

3 Ties at Rebar

4 Overlap Splaccing

5 Concrete Cover / Conrete decking


Installation of embedded all ( anchor bolts,
6 pipes, angle, insert plates etc )
7 Ikatan kawat bendrat

8 Material quality (shape & surface)

9 Dimension ( Widht, length, height)

10 Shoring & support

11 Tiltness of the vertical tolerance

12 Straightness of line of the formwork

13 Elevation (Top Cor)

14 Koordinat

15 Rectangularity of formwork

16 Form Oil Usage

17 Cleanliness

Note :

PT. WIKA REKAYASA KONSTRUKSI PT. DUA SAMUDERA PERKASA


PREPARED BY. CHEKED BY. APPROVED BY.

Print Name

Signature

Date
INSPEKSI Pre-
Pouring Concrete
Doc. No. : STG-QAS-ISD-01-008 Q 045

Subject Inspeksi Pre-Pouring Concrete Date 01 Agustus 2022


Service No. Primary Crusher 1A Inspection No. STG-QAS-ISP-045-008
Location Line 1 Revision No.
Sub-Cont. Ref. Drawing No. WRK/C/DD/02

Accepted
NO INSPECTION ITEM Date Sign Remark
Yes No
1 Diameter & quantity of rebar

2 Diameter & distance of Stirrup

3 Ties at Rebar

4 Overlap Splaccing

5 Concrete Cover / Conrete decking


Installation of embedded all ( anchor bolts,
6 pipes, angle, insert plates etc )
7 Ikatan kawat bendrat

8 Material quality (shape & surface)

9 Dimension ( Widht, length, height)

10 Shoring & support

11 Tiltness of the vertical tolerance

12 Straightness of line of the formwork

13 Elevation (Top Cor)

14 Koordinat

15 Rectangularity of formwork

16 Form Oil Usage

17 Cleanliness

Note :

PT. WIKA REKAYASA KONSTRUKSI PT. DUA SAMUDERA PERKASA


PREPARED BY. CHEKED BY. APPROVED BY.

Print Name

Signature

Date

You might also like