J6 - NEW Luffing Boom

Download as pdf or txt
Download as pdf or txt
You are on page 1of 109

Objekt : Codelco-Chile, Gaby Plant Part : J6

Leach Pad Stacking, Ripios Reclaim


and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter :
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 1

Structural Calculation
for

New Luffing Boom


of

Mobile Stacking Bridge 160-ME-001

Engineers in charge

Structural engineering

Calculation Müller, W.
Leipzig, 16.06.2010

Mechanical engineering

Revision Date By Remarkes

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter :
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 2

0. General

1. Loads

2. Load combinations for overall structural calculation

4. Stress verification
4.0. Von Mises stresses for the complete steelwork
4.1. Boom lower chord
4.2. Boom upper chord
4.3. Boom horizontal cross beams
4.4. Boom vertical beams
4.5. Boom Bracing
4.6. Adapter horizontal beam for belt support
4.7. Adapter main wall beams
4.8. Adapter horizontal cross beams
4.9. Adapter bracings
4.10. FE-Detail for Mounting the Cylinder at Boom
4.11. FE-Detail for Mounting the Cylinder at Adapter
4.12. FE-Detail for Safety Rod
4.13. Mounting of Safety Rod
4.14. FE-Detail for Support of the Adapter
4.15. Verification of pins

5. Hydraulic cylinder data

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 1.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 3

J6 New Luffing Boom

0. General

The new luffing boom is designed in accordance with the following standards:

ISO 5049/1 Load assumption und superimposition of loads


Additional to the loads according to ISO 5049/1 imact loads due to falling
material into the receiving chute will be considered.

DIN 18800 The stress assessmet and the stability verifications (buckling of members)
Part 01+02

AISC Design of bolts (all bolts according to ASTM A325)


13 th edition

The load assumptions of ISO 5049/1 are basing on the method of Allowable Stress Design (ASD).

These allowable stresses are safeguarded against the yield strength with the folowing
safety factors:
LC I νLC I = 1,50
LC II νLC II = 1,33
LC III, IV, V νLC III-V = 1,20
LC VI νLC VI = 1,10

The DIN 18800 and the AISC 13th Edition are basing on Limit Resistance Force Design (LRFD)
with a material factor γM and a force factor γF.

The safety factor ν is identical with ν= γM*γF

Setting γM = 1,00

ν= γF

All superimposed loads will be amplified with the factor ν!


The comuted stresses, basing on the amplified loads, will be related with the yield stress σy!

The structural calculation is carried out as a Finite Element Analysis.


The complete steelwork is computed with the FE-program KRASTA, basing on stick elements.
Detail areas are computed with ANSYS basing on shell elements

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 1.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 4

J6 New Luffing Boom


1. Loads

Dead load DL
[kg] x [m] y [m] z [m]
steelwork new luffing boom 8.700 -12,800 0,000 -0,405
steelwork adapter 8.750 -4,330 0,000 0,686
safety rod 1.500 -8,470 0,000 2,156
walkway adapter 1.150 -3,030 0,400 -0,344
walkway new luffing boom 2.500 -13,600 0,000 -0,944
GPS support 2.500 -4,060 0,000 2,856
chute 2.000 -15,596 0,000 -0,044
liner plates 2.050 -15,875 0,000 -0,124
steelstructure 29.150 -9,376 0,016 0,335

pulley 2.300 -20,640 0,000 -1,570


bent pulley 900 -6,670 0,000 -0,590
belt adapter 690 -2,920 0,000 -1,160
belt boom 1.715 -13,620 0,000 -1,170
idler adapter 440 -3,410 0,000 -0,300
idler boom 5.738 -15,240 0,000 -1,200
belt cleaner 200 -15,600 0,000 -1,360
cable 265 -6,400 -1,400 0,100
Zylinder 3.200 -6,950 0,000 3,060
mechanic 15.448 -12,613 -0,024 -0,286

DL dead load 44.598 -10,498 0,002 0,210

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 1.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 5

Operating live load LLo

B [m] 1,600 α [°] 40


b [m] 1,39 β [°] 25
l3 [m] 0,545

S1 [m²] 0,1105
S2 [m²] 0,2359
Σ S [m²] S1 + S 2 = 0,3464

γ [t/m³] 1,60

Load per Meter for 100% nominal belt capacity


p [t/m] 0,554

Conveyor material
LLo 554 kg * 19,25 m = 10.665 kg

Live load LL

LL spillage 10% LLo 1.066 kg


incrustation chute 1.760 kg
2.826 kg

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 1.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 6

Upset live load LLu

Clogging chutes (Receiving chute)

LLu max. capacity of chute 9,3 m³


density 1,6 t/m³

weight 14.880 kg

centric and eccentric considered eccentricity: 60% - 40%

additional there is still considered the weight of incrustation

considered in incrustation: 1.760 kg

total weight of LLu 16.640 kg


163,2 kN

Impact Loads IL

Along the conveyor 10,0 % of conveyor material

10% LLo 1.066 kg


10,7 kN

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 1.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 7

Transfer points
At transfer points the vertical force due to falling material.
h= 2,5 m
belt speed 5,3 m/s
Pz IL = 14,40 kN

Pz = 1,0 * fn * v n * h
g

fn = 5,54 kN/m
vn = 5,30 m/s
h= 2,5 m
g= 10 m/s²

Pz = 14,68 kN
25,35 kN

Belt tension BT

Belt tension T = 160kN

rear pulley
T3
X= 320 kN
X Z= 0 kN

T3

Z
bend pulley
T3
X= -23,4 kN
X Z= -83,3 kN

T3

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 1.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 8

Wind Load WL

Standard UBC 97 Part 2


max. storm wind velocity v= 33,3 m/s
v= 120,0 km/h

Velocity pressure qs = v²/16/100


qs = 0,694 kN/m²

Design wind pressure P= Iw*Cq*Ce*fred*qs

Importance factor Iw = 1,0


Pressure coefficients Cq = 1,3 vertical projected area
up to 12,2m
Cq = 1,4 vertical projected area
higher 12,2m

Reducing factor in dependence of the altitude of site:

Altitude of site: 2700 m

Average barometric press. 0m 103,2 kPa


Average barometric press. 2700m 74,5 kPa

fred = 74,5/103,2 = 0,722


P=
Height Ce f red = Iw*Cq*Ce*fred*qs
[m] [ft] [kN/m²]
18,3 60 1,73 0,722 1,127
15,2 50 1,67 0,722 1,088
12,2 40 1,62 0,722 1,056
9,1 30 1,54 0,722 1,004
7,6 25 1,5 0,722 0,978
6,1 20 1,45 0,722 0,945
4,6 15 1,39 0,722 0,906
0,0 0 1,39 0,722 0,906
Exposure D

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 1.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 9

Wind force WL = P*A f

Af will be determined in accordance with the shape of the particular elements of


the stacking, reclaiming and disposal system!

The above mentioned wind loads are the maximum wind loads = design wind loads =
= wind out of service

The maximum service wind velocity v= 22,2 m/s


v= 80,0 km/h

Velocity pressure qs = v²/16/100


operational wind qs = 0,309 kN/m²

Ration between operational wind and maximum wind:

f= 0,444

Wind loads luffing boom:

h= 7,6 m above the ground

P= 0,978 kN/m²

Wind in y-direction (across the conveying direction)

Truss area:
h [m] l [m] W [kN]

Upper cord 0,250 30,1 7,35

Lower chord 0,250 40,8 9,97

Vertical member

or 0,200 21,0 4,1

Diagonal member 0,200 14,2 2,8

fixed part 0,300 59,6 17,48

Σ WLy [kN] 41,68

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 1.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 10

Belt area
h [m] l [m] W [kN]

Carrying belt 0,400 20,4 7,98

Return belt 0,225 21,1 4,64

Σ WLy [kN] 12,62

ΣΣ WLy [kN] 54,30

Single areas:

Receiving chute
Chute A= 8,50 m²
WLy = 8,31 kN

Return pulley
Dm 850 A= 0,57 m²
WLy = 0,55 kN

Zylinder A= 2,96 m²
WLy = 2,89 kN

Σ WLy = 63,16 kN

Seismic Load EL (Standard NCH 2369 - 2003)

Base shear Q0 = C*I*P

Importance factor I= 1,0

Seismic coeffizient C= 2,75*A 0/(g*R)*(T'/T*)n*(0,05/ξ)0,4

*) Maximum effective A0 = 0,3 *g Table 5.2


ground acceleration

Structural response R= 5,0 Table 5.6, Line 3.1


modification factor

Parameter relative to type T'= 0,35 s


of foundation ground n= 1,33 Table 5.4, Soil type II

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 1.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 11

Damping ratio ξ= 0,02 Techn. Specification


N°100-M-ET-13, Clause 4.9.6

Vibration fundament. period T*= 0,33 s appr. 3,0Hz

C= 0,257 > Cmax = 0,195


Table 5.7
0,26*0,75= 0,195

Horizontal seismic forces according to NCH 2369

ELh = Qo = 0,195 *P

Vertical seismic action Fv = +/- 2/3 (A 0/g)*I*P

ELv = Fv = 0,200 *P

P= DL + 0,7*(LL + LL o )
(See Design Criteria N° 000-C-CD-001, Clause 5.3.3)

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 2.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 12

2. Load combinations for overall structural calculation


Superimposition according to ISO 5049/1

160-ME-001 NEW luffing boom mobile stacking bridge


LC "H" LC "HZ" LC "HZS" LC "HZS" LC "HZS" LC "HZG"
Normal Normal oper. + Chute clogging+ Out of operation Earthquake Earthquake
operation operation. wind operation. wind + design wind
Safety factor ν 1,50 1,33 1,20 1,20 1,20 1,10

DL 1,0 1,0 1,0 1,0 1,0 1,0

LL Spillage+incrust. 1,0 1,0 1,0 1,0 1,0 1,0

LLo Operat. live load 1,0 1,0 1,0 1,0 1,0 1,0
100% belt capacity
IL Impact load 1,0 1,0 1,0 1,0 1,0

LLu Chute clogging 1,0 1,0

BT 1,0 1,0 1,0 1,0 1,0 1,0

TL 1,0 1,0 1,0 1,0 1,0

WL 0,44 0,44 1,0

EL 1,0 1,0
LC I LC II LC III LC IV LC V LC VI

DL dead load

LL live load = spillage = 10% of conveyor material + incrustation of chutes

LLo operating live load include conveyor material (100% belt cross section)

LLu clogged chutes with 100% chute volume

BT belt tension, maximum value from running mode

IL along the length of conveyor: 10% of conveyor material


impact load include: at transfer points: falling material

TL temperature load

WL design wind load 120km/h


Wind loads will be calculated in two orthogonal directions!
WL = +/- 1,0*WLy or +/- 1,0*WLx

EL earthquake load
Earthquake loads will be calculated as follows:
EL = +/- 1,0*Ehorizontal x or +/- 1,0*Ehorizontal y
+/- 1,0*Evertical +/- 1,0*Evertical

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 3.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 13

3. KRASTA Input
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 3.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 14

Dead Load DL

loads, load case: DL_dead_load

total of node loads : .0 , .0 , -214.10398 [kN]


total of beam conc. loads : .0 , .0 , .0 [kN]
total of distrib. loads : .0 , .0 , -235.94388 [kN]
total of all forces : .0 , .0 , -450.04786 [kN]
total of node moments : .0 , .0 , .0 [kNcm]
total of beam conc. moments: .0 , .0 , .0 [kNcm]
total of distrib. moments : .0 , .0 , .0 [kNcm]
total of all moments : .0 , .0 , .0 [kNcm]
reference point : .0 , .0 , .0 [cm]
resulting moments : 364.0188, -4.7254E+05, .0 [kNcm]
intersection point of resulting force
with x-y plane: -1049.97, -.81, .0 [cm]

Values according to chapter 5.4 ∑ DL = 446,0 kN


Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 3.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 15

Operating Live Load LLo

Values according to chapter 5.4 ∑ LLo = 106,6 kN


Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 3.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 16

Live Load LL

Values according to chapter 5.4 ∑ LL = 28,3 kN


Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 3.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 17

Upset Live Load LLu

Values according to chapter 5.4 ∑ LLu = 148 kN


Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 3.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 18

Impact Load IL

Values according to chapter 5.4 ∑ IL = 25,35 kN


Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 3.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 19

Belt Tension BT

Values according to chapter 5.4 ∑ BTx = 296,6 kN


∑ BTz = 83,3 kN
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 3.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 20

Wind Load WLy

Values according to chapter 5.4 ∑ WLy = 63,2 kN


Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 3.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 21

Seismic Load Elv

loads, load case: ELv_

total of node loads : .0 , .0 , 66.1168 [kN]


total of beam conc. loads : .0 , .0 , .0 [kN]
total of distrib. loads : .0 , .0 , 63.6164 [kN]
total of all forces : .0 , .0 , 129.7332 [kN]
total of node moments : .0 , .0 , .0 [kNcm]
total of beam conc. moments: .0 , .0 , .0 [kNcm]
total of distrib. moments : .0 , .0 , .0 [kNcm]
total of all moments : .0 , .0 , .0 [kNcm]
reference point : .0 , .0 , .0 [cm]
resulting moments : -72.8038, 1.4905E+05, .0 [kNcm]
intersection point of resulting force
with x-y plane: -1148.93, -.56, .0 [cm]

Values according to chapter 5.4 ∑ ELv = 128,9 kN


Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 3.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 22

Seismic Load Elhx

loads, load case: ELhx_

total of node loads : 64.46388, .0 , .0 [kN]


total of beam conc. loads : .0 , .0 , .0 [kN]
total of distrib. loads : 62.02599, .0 , .0 [kN]
total of all forces : 126.48987, .0 , .0 [kN]
total of node moments : .0 , .0 , .0 [kNcm]
total of beam conc. moments: .0 , .0 , .0 [kNcm]
total of distrib. moments : .0 , .0 , .0 [kNcm]
total of all moments : .0 , .0 , .0 [kNcm]
reference point : .0 , .0 , .0 [cm]
resulting moments : .0 , -2780.1632, 70.9837 [kNcm]
intersection point of resulting force
with y-z plane: .0 , -.56, -21.98 [cm]

Values according to chapter 5.4 ∑ ELh = 125,7 kN


Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No . : MTF Order No: G 0197.10 Chapter : 3.
Client Project No: C-475
TAKRAF GmbH * Torgauer Str . 336 * 04347 Leipzig page : 23

Seismic Load Elhy

loads, load case: ELhy_

total of node loads : .0 , 64.46388, .0 [kN]


total of beam conc. loads : .0 , .0 , .0 [kN]
total of distrib. loads : .0 , 62.02599, .0 [kN]
total of all forces : .0 , 126.48987, .0 [kN]
total of node moments : .0 , .0 , .0 [kNcm]
total of beam conc. moments: .0 , .0 , .0 [kNcm]
total of distrib. moments : .0 , .0 , .0 [kNcm]
total of all moments : .0 , .0 , .0 [kNcm]
reference point : .0 , .0 , .0 [cm]
resulting moments : 2780.1632, .0 , -1.4533E+05 [kNcm]
intersection point of resulting force
with x-z plane: -1148.93, .0 , -21.98 [cm]

Values according to chapter 5.4 ∑ ELh = 125,7 kN


Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 24

4. Stress verification

4.0. Von Mises stresses for the complete steelwork

Hydraulic cylinder

Stresses according to LFRD-Method!


The above shown stresses will be compared with Fy.
Steel Grad ASTM A572 Grade 50 Fy = 34,5 kN/cm²
Steel Grad ASTM A500 Fy = 30,0 kN/cm²
(HSS shapes)

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 25

4. Stress verification

4.1. Boom lower chord

stresses
max σ = 27,7 kN/cm2 < σR,d = 34,5 kN/cm2

Stability (buckling of members)

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 26

cross section DT 200x200x18x10


material:A572 Gr.50 fy,k = 34,5 kN/cm²
z γM = 1,0

h= 20,0 cm th = 1,0 cm
b= 20,0 cm tb = 1,8 cm

2
A= 88,4 cm
4 4
y Iy = 6349 cm Iz = 2402 cm
y 3 3
th h Wy = 635 cm Wz = 240 cm
iy = 8,47 cm iz = 5,21 cm

iP = 9,95 cm
4
IT = 83,2 cm
tb z Iω = 198.870 cm
6
b

W pl,y = 722 cm3 W pl,z = 360 cm3


αy = 1,14 αz = 1,50

Npl,d = 3049,8 kN
Mpl,y,d = 249,2 kNm Mpl,z,d = 124,2 kNm

stresses/inner forces
max σ = 26,5 kN/cm2 < σR,d = 34,5 kN/cm2

stability σN,d = 14,0 kN/cm² σM,y,d = 2,9 kN/cm² σM,z,d = 16,0 kN/cm²
Perm. 712 Nd = 1237,6 kN My,d = 18,4 kNm Mz,d = 38,4 kNm
σ N,d , σ M,y,d , σ M,z,d are maximum single stresses and not associating!

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

Steg: b/t ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d - σM,y,d)/(σN,d + σM,y,d) = 0,66
σ1web = (σN,d + σM,y,d) = 16,9 kN/cm²
b/t = 18,20 ≤ 57,10

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 27

Flansch: b/t ≤ 19,7*(0,57-0,21*(ψ+0,07*ψ²)1/2*(240/(σ1*γM))1/2


ψflange = (σN,d + σM,y,d )/(σN,d + σM,y,d +σM,z,d) = 0,51
σ1flange = (σN,d + σM,y,d + σM,z,d) = 32,9 kN/cm²
b/t = 5,28 ≤ 11,66

buckling geometrie sky = 270 cm skz = 200 cm


torsional length x axis s0 = 200 cm

parameters
DIN 18800 Teil 2 Tab. 11 β m,y = 1,10 β m,z = 1,10
β M,y = 1,10 β M,z = 1,10

DIN 18800 Teil 2 Tab. 9 / 10 Trägerbeiwert n = 2 geschw. Träger


Faktor k n = 0,8
Momentenbeiwert ζ = 1,10

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 14,59 ηKi,z,d = 10,05

λκ,y = sκ,y / iy = 31,9 λκ,z = sκ,z / iz = 38,4

λκ,y = λκ,y / λa = 0,411 λκ,z = λκ,z / λa = 0,495

buckling curve y-Achse b z-Achse c


=> αy = 0,34 => αz = 0,49

parameters ky = 0,62 kz = 0,69


κy = 0,922 κz = 0,846
ay = -0,60 az = -0,39
ky = 1,27 kz = 1,19

Verification of lateral buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d Mpl,z,d

0,480 + 0,093 + 0,368 = 0,941 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 28

zp = 0,0 cm Lastangriffspunkt für


Querlasten
c² = 136,9 cm²

NKi,z = 12444 kN

NKi,z,d = 12444 kN

λK,z = 0,495
κz= 0,846
ay = -0,07 az = -0,39
ky = 1,00 kz = 1,19

MKi,y = 1601,4 kNm

λM = √ Mpl,y,d / MKi,y,d = 0,39

κM = 1,00

Verification of lateral torsional buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κz x Npl,d κM x Mpl,y,d Mpl,z,d

0,480 + 0,074 + 0,368 = 0,921 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 29

cross section DT 200x200x18x10


material:A572 Gr.50 fy,k = 34,5 kN/cm²
z γM = 1,0

h= 20,0 cm th = 1,0 cm
b= 20,0 cm tb = 1,8 cm

2
A= 88,4 cm
4 4
y Iy = 6349 cm Iz = 2402 cm
y 3 3
th h Wy = 635 cm Wz = 240 cm
iy = 8,47 cm iz = 5,21 cm

iP = 9,95 cm
4
IT = 83,2 cm
tb z Iω = 198.870 cm
6
b

W pl,y = 722 cm3 W pl,z = 360 cm3


αy = 1,14 αz = 1,50

Npl,d = 3049,8 kN
Mpl,y,d = 249,2 kNm Mpl,z,d = 124,2 kNm

stresses/inner forces
max σ = 25,0 kN/cm2 < σR,d = 34,5 kN/cm2

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 30

stability σN,d = 14,6 kN/cm² σM,y,d = 1,8 kN/cm² σM,z,d = 14,5 kN/cm²
Nd = 1290,6 kN My,d = 11,4 kNm Mz,d = 34,8 kNm
σ N,d , σ M,y,d , σ M,z,d are maximum single stresses and not associating!

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

Steg: b/t ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d)/(σN,d + σM,y,d) = 0,78
σ1web = (σN,d + σM,y,d) = 16,4 kN/cm²
b/t = 18,20 ≤ 53,27

Flansch: b/t ≤ 19,7*(0,57-0,21*(ψ+0,07*ψ²)1/2*(240/(σ1*γM))1/2


ψflange = (σN,d + σM,y,d )/(σN,d + σM,y,d +σM,z,d) = 0,53
σ1flange = (σN,d + σM,y,d + σM,z,d) = 30,9 kN/cm²
b/t = 5,28 ≤ 12,01

buckling geometrie sky = 250 cm skz = 140 cm


torsional length x axis s0 = 140 cm

parameters
DIN 18800 Teil 2 Tab. 11 β m,y = 1,10 β m,z = 1,10
β M,y = 1,10 β M,z = 1,10

DIN 18800 Teil 2 Tab. 9 / 10 Trägerbeiwert n = 2 geschw. Träger


Faktor k n = 0,8
Momentenbeiwert ζ = 1,10

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 16,31 ηKi,z,d = 19,68

λκ,y = sκ,y / iy = 29,5 λκ,z = sκ,z / iz = 26,9

λκ,y = λκ,y / λa = 0,381 λκ,z = λκ,z / λa = 0,347

buckling curve y-Achse b z-Achse c


=> αy = 0,34 => αz = 0,49

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 31

parameters ky = 0,60 kz = 0,60


κy = 0,934 κz = 0,925
ay = -0,55 az = -0,12
ky = 1,25 kz = 1,06

Verification of lateral buckling:

Nd + My,d x ky + Mz,d x kz < 1


κmin x Npl,d Mpl,y,d Mpl,z,d

0,457 + 0,057 + 0,296 = 0,811 < 1

zp = 0,0 cm Lastangriffspunkt für


Querlasten
c² = 109,3 cm²

NKi,z = 25395 kN

NKi,z,d = 25395 kN

λK,z = 0,347
κz= 0,925
ay = -0,09 az = -0,12
ky = 1,00 kz = 1,06

MKi,y = 2920,5 kNm

λM = √ Mpl,y,d / MKi,y,d = 0,29

κM = 1,00

Verification of lateral torsional buckling:

Nd + My,d x ky + Mz,d x kz < 1


κz x Npl,d κM x Mpl,y,d Mpl,z,d

0,457 + 0,046 + 0,296 = 0,800 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 32

cross section DT 200x200x18x10


material:A572 Gr.50 fy,k = 34,5 kN/cm²
z γM = 1,0

h= 20,0 cm th = 1,0 cm
b= 20,0 cm tb = 1,8 cm

2
A= 88,4 cm
4 4
y Iy = 6349 cm Iz = 2402 cm
y 3 3
th h Wy = 635 cm Wz = 240 cm
iy = 8,47 cm iz = 5,21 cm

iP = 9,95 cm
4
IT = 83,2 cm
tb z Iω = 198.870 cm
6
b

W pl,y = 722 cm3 W pl,z = 360 cm3


αy = 1,14 αz = 1,50

Npl,d = 3049,8 kN
Mpl,y,d = 249,2 kNm Mpl,z,d = 124,2 kNm

stresses/inner forces
max σ = 27,7 kN/cm2 < σR,d = 34,5 kN/cm2

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 33

stability σN,d = 13,6 kN/cm² σM,y,d = 9,5 kN/cm² σM,z,d = 5,5 kN/cm²
Nd = 1202,2 kN My,d = 60,3 kNm Mz,d = 13,2 kNm
σ N,d , σ M,y,d , σ M,z,d are maximum single stresses and not associating!

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

Steg: b/t ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d)/(σN,d + σM,y,d) = 0,18
σ1web = (σN,d + σM,y,d) = 23,1 kN/cm²
b/t = 18,20 ≤ 67,82

Flansch: b/t ≤ 19,7*(0,57-0,21*(ψ+0,07*ψ²)1/2*(240/(σ1*γM))1/2


ψflange = (σN,d + σM,y,d )/(σN,d + σM,y,d +σM,z,d) = 0,81
σ1flange = (σN,d + σM,y,d + σM,z,d) = 28,6 kN/cm²
b/t = 5,28 ≤ 12,05

buckling geometrie sky = 300 cm skz = 150 cm


torsional length x axis s0 = 150 cm

parameters
DIN 18800 Teil 2 Tab. 11 β m,y = 1,10 β m,z = 1,10
β M,y = 1,10 β M,z = 1,10

DIN 18800 Teil 2 Tab. 9 / 10 Trägerbeiwert n = 2 geschw. Träger


Faktor k n = 0,8
Momentenbeiwert ζ = 1,10

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 12,16 ηKi,z,d = 18,40

λκ,y = sκ,y / iy = 35,4 λκ,z = sκ,z / iz = 28,8

λκ,y = λκ,y / λa = 0,457 λκ,z = λκ,z / λa = 0,371

buckling curve y-Achse b z-Achse c


=> αy = 0,34 => αz = 0,49

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 34

parameters ky = 0,65 kz = 0,61


κy = 0,903 κz = 0,912
ay = -0,68 az = -0,17
ky = 1,30 kz = 1,07

Verification of lateral buckling:

Nd + My,d x ky + Mz,d x kz < 1


κmin x Npl,d Mpl,y,d Mpl,z,d

0,437 + 0,314 + 0,114 = 0,865 < 1

zp = 0,0 cm Lastangriffspunkt für


Querlasten
c² = 113,2 cm²

NKi,z = 22122 kN

NKi,z,d = 22122 kN

λK,z = 0,371
κz= 0,912
ay = -0,09 az = -0,17
ky = 1,00 kz = 1,07

MKi,y = 2589,3 kNm

λM = √ Mpl,y,d / MKi,y,d = 0,31

κM = 1,00

Verification of lateral torsional buckling:

Nd + My,d x ky + Mz,d x kz < 1


κz x Npl,d κM x Mpl,y,d Mpl,z,d

0,432 + 0,242 + 0,114 = 0,788 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 35

cross section DT 200x200x18x10


material:A572 Gr.50 fy,k = 34,5 kN/cm²
z γM = 1,0

h= 20,0 cm th = 1,0 cm
b= 20,0 cm tb = 1,8 cm

2
A= 88,4 cm
4 4
y Iy = 6349 cm Iz = 2402 cm
y 3 3
th h Wy = 635 cm Wz = 240 cm
iy = 8,47 cm iz = 5,21 cm

iP = 9,95 cm
4
IT = 83,2 cm
tb z Iω = 198.870 cm
6
b

W pl,y = 722 cm3 W pl,z = 360 cm3


αy = 1,14 αz = 1,50

Npl,d = 3049,8 kN
Mpl,y,d = 249,2 kNm Mpl,z,d = 124,2 kNm

stresses/inner forces
max σ = 24,2 kN/cm2 < σR,d = 34,5 kN/cm2

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 36

stability σN,d = 6,5 kN/cm² σM,y,d = 15,6 kN/cm² σM,z,d = 3,0 kN/cm²
Nd = 574,6 kN My,d = 99,0 kNm Mz,d = 7,2 kNm
σ N,d , σ M,y,d , σ M,z,d are maximum single stresses and not associating!

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

Steg: b/t ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d)/(σN,d + σM,y,d) = -0,41
σ1web = (σN,d + σM,y,d) = 22,1 kN/cm²
b/t = 18,20 ≤ 98,07

Flansch: b/t ≤ 19,7*(0,57-0,21*(ψ+0,07*ψ²)1/2*(240/(σ1*γM))1/2


ψflange = (σN,d + σM,y,d )/(σN,d + σM,y,d +σM,z,d) = 0,88
σ1flange = (σN,d + σM,y,d + σM,z,d) = 25,1 kN/cm²
b/t = 5,28 ≤ 12,77

buckling geometrie sky = 180 cm skz = 180 cm


torsional length x axis s0 = 180 cm

parameters
DIN 18800 Teil 2 Tab. 11 β m,y = 1,10 β m,z = 1,10
β M,y = 1,10 β M,z = 1,10

DIN 18800 Teil 2 Tab. 9 / 10 Trägerbeiwert n = 2 geschw. Träger


Faktor k n = 0,8
Momentenbeiwert ζ = 1,10

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 70,69 ηKi,z,d = 26,74

λκ,y = sκ,y / iy = 21,2 λκ,z = sκ,z / iz = 34,5

λκ,y = λκ,y / λa = 0,274 λκ,z = λκ,z / λa = 0,446

buckling curve y-Achse b z-Achse c


=> αy = 0,34 => αz = 0,49

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 37

parameters ky = 0,55 kz = 0,66


κy = 0,974 κz = 0,873
ay = -0,36 az = -0,30
ky = 1,07 kz = 1,07

Verification of lateral buckling:

Nd + My,d x ky + Mz,d x kz < 1


κmin x Npl,d Mpl,y,d Mpl,z,d

0,216 + 0,425 + 0,062 = 0,702 < 1

zp = 0,0 cm Lastangriffspunkt für


Querlasten
c² = 126,6 cm²

NKi,z = 15362 kN

NKi,z,d = 15362 kN

λK,z = 0,446
κz= 0,873
ay = -0,08 az = -0,30
ky = 1,00 kz = 1,07

MKi,y = 1901,4 kNm

λM = √ Mpl,y,d / MKi,y,d = 0,36

κM = 1,00

Verification of lateral torsional buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κz x Npl,d κM x Mpl,y,d Mpl,z,d

0,216 + 0,397 + 0,062 = 0,675 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 38

4. Stress verification

4.2. Boom upper chord

stresses
max σ = 31,8 kN/cm2 < σR,d = 34,5 kN/cm2

Stability (buckling of members)

cross section DT 200x200x14x8


material:A572 Gr.50 fy,k = 34,5 kN/cm²
z γM = 1,0

h= 20,0 cm th = 0,8 cm
b= 20,0 cm tb = 1,4 cm

2
y A= 69,76 cm
y 4 4
Iy = 5192 cm Iz = 1867 cm
th h 3 3
Wy = 519 cm Wz = 187 cm
iy = 8,63 cm iz = 5,17 cm

iP = 10,06 cm
tb z 4
b IT = 39,5 cm
6
Iω = 161.517 cm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 39

W pl,y = 580 cm3 W pl,z = 280 cm3


αy = 1,12 αz = 1,50

Npl,d = 2406,7 kN
Mpl,y,d = 200,1 kNm Mpl,z,d = 96,6 kNm

stability σN,d = 1,0 kN/cm² σM,y,d = 17,2 kN/cm² σM,z,d = 18,5 kN/cm²
Nd = 69,8 kN My,d = 89,3 kNm Mz,d = 34,5 kNm
σ N,d , σ M,y,d , σ M,z,d are maximum single stresses and not associating!

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

Steg: b/t ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d - σM,y,d)/(σN,d + σM,y,d) = -0,89
σ1web = (σN,d + σM,y,d) = 18,2 kN/cm²
b/t = 23,25 ≤ 143,14

Flansch: b/t ≤ 19,7*(0,57-0,21*(ψ+0,07*ψ²)1/2*(240/(σ1*γM))1/2


ψflange = (σN,d + σM,y,d )/(σN,d + σM,y,d +σM,z,d) = 0,50
σ1flange = (σN,d + σM,y,d + σM,z,d) = 36,7 kN/cm²
b/t = 6,86 ≤ 11,07

buckling geometrie sky = 300 cm skz = 300 cm


torsional length x axis s0 = 300 cm

parameters
DIN 18800 Teil 2 Tab. 11 β m,y = 1,10 β m,z = 1,10
β M,y = 1,10 β M,z = 1,10

DIN 18800 Teil 2 Tab. 9 / 10 Trägerbeiwert n = 2 geschw. Träger


Faktor k n = 0,8
Momentenbeiwert ζ = 1,10

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 40

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 171,39 ηKi,z,d = 61,65

λκ,y = sκ,y / iy = 34,8 λκ,z = sκ,z / iz = 58,0

λκ,y = λκ,y / λa = 0,449 λκ,z = λκ,z / λa = 0,748

buckling curve y-Achse b z-Achse c


=> αy = 0,34 => αz = 0,49

parameters ky = 0,64 kz = 0,91


κy = 0,906 κz = 0,695
ay = -0,69 az = -0,85
ky = 1,02 kz = 1,04

Verification of lateral buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d Mpl,z,d

0,042 + 0,456 + 0,370 = 0,868 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 41

zp = 0,0 cm Lastangriffspunkt für


Querlasten
c² = 160,8 cm²

NKi,z = 4301 kN

NKi,z,d = 4301 kN

λK,z = 0,748
κz= 0,695
ay = -0,03 az = -0,85
ky = 1,00 kz = 1,04

MKi,y = 599,8 kNm

λM = √ Mpl,y,d / MKi,y,d = 0,58

κM = 0,91

Verification of lateral torsional buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κz x Npl,d κM x Mpl,y,d Mpl,z,d

0,042 + 0,493 + 0,370 = 0,905 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 42

4. Stress verification

4.3. Boom horizontal cross beams

stresses:
max σ = 18,6 kN/cm2 < σR,d = 34,5 kN/cm2

Stability (buckling of members)

cross section DT 200x100x10x5


material:A572 Gr.50 fy,k = 34,5 kN/cm²
z γM = 1,0

h= 20,0 cm th = 0,5 cm
b= 10,0 cm tb = 1,0 cm

2
A= 29 cm
4 4
y y Iy = 2050 cm Iz = 167 cm
3 3
th h Wy = 205 cm Wz = 33 cm
iy = 8,41 cm iz = 2,40 cm

iP = 8,74 cm
4
IT = 7,4 cm
tb z 6
b Iω = 15.060 cm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 43

W pl,y = 231 cm3 W pl,z = 50 cm3


αy = 1,12 αz = 1,50

Npl,d = 1000,5 kN
Mpl,y,d = 79,5 kNm Mpl,z,d = 17,3 kNm

stability σN,d = 0,1 kN/cm² σM,y,d = 12,3 kN/cm² σM,z,d = 12,4 kN/cm²
Nd = 2,9 kN My,d = 25,2 kNm Mz,d = 4,1 kNm
σ N,d , σ M,y,d , σ M,z,d are maximum single stresses and not associating!

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

Steg: b/t ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d - σM,y,d)/(σN,d + σM,y,d) = -0,98
σ1web = (σN,d + σM,y,d) = 12,4 kN/cm²
b/t = 38,00 ≤ 182,63

Flansch: b/t ≤ 19,7*(0,57-0,21*(ψ+0,07*ψ²)1/2*(240/(σ1*γM))1/2


ψflange = (σN,d + σM,y,d )/(σN,d + σM,y,d +σM,z,d) = 0,50
σ1flange = (σN,d + σM,y,d + σM,z,d) = 24,8 kN/cm²
b/t = 4,75 ≤ 13,46

buckling geometrie sky = 290 cm skz = 290 cm


torsional length x axis s0 = 290 cm

parameters
DIN 18800 Teil 2 Tab. 11 β m,y = 1,10 β m,z = 1,10
β M,y = 1,10 β M,z = 1,10

DIN 18800 Teil 2 Tab. 9 / 10 Trägerbeiwert n = 2 geschw. Träger


Faktor k n = 0,8
Momentenbeiwert ζ = 1,10

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 44

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 1741,84 ηKi,z,d = 141,80

λκ,y = sκ,y / iy = 34,5 λκ,z = sκ,z / iz = 120,9

λκ,y = λκ,y / λa = 0,445 λκ,z = λκ,z / λa = 1,560

buckling curve y-Achse b z-Achse c


=> αy = 0,34 => αz = 0,49

parameters ky = 0,64 kz = 2,05


κy = 0,908 κz = 0,296
ay = -0,68 az = -2,31
ky = 1,00 kz = 1,02

Verification of lateral buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d Mpl,z,d

0,010 + 0,318 + 0,245 = 0,573 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 45

zp = 0,0 cm Lastangriffspunkt für


Querlasten
c² = 236,0 cm²

NKi,z = 411 kN

NKi,z,d = 411 kN

λK,z = 1,560
κz= 0,296
ay = 0,11 az = -2,31
ky = 1,00 kz = 1,02

MKi,y = 69,5 kNm

λM = √ Mpl,y,d / MKi,y,d = 1,07

κM = 0,60

Verification of lateral torsional buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κz x Npl,d κM x Mpl,y,d Mpl,z,d

0,010 + 0,524 + 0,245 = 0,779 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 46

stresses/inner forces
max σ = 14,1 kN/cm2 < σR,d = 34,5 kN/cm2

Stability (buckling of members)

cross section box 187x200x6


material:A572 Gr.50 fy,k = 34,5 kN/cm²
γM = 1,0
z
h= 18,7 cm th = 0,6 cm

b= 20,0 cm tb = 0,6 cm
y
2
A= 45 cm
h
y Iy = 2502 cm4 Iz = 2776 cm4
Wy = 268 cm3 Wz = 277,6 cm3
iy = 7,46 cm iz = 7,85 cm

t z
b W pl,y = 310 cm3 W pl,z = 323 cm3
f= 1,16 f= 1,16

Npl,d = 1552,5 kN
Mpl,y,d = 107,0 kNm Mpl,z,d = 111,4 kNm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 47

stresses/inner forces
σN,d = 1,4 kN/cm² σM,y,d = 6,0 kN/cm² σM,z,d = 11,7 kN/cm²
Nd = 63,0 kN My,d = 16,1 kNm Mz,d = 32,5 kNm

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

web z-z: h / th ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d + σM,z,d)/(σN,d + σM,y,d + σM,z,d)= 0,37
σ1web = (σN,d + σM,y,d + σM,z,d) = 19,1 kN/cm²
h / th = 30,17 ≤ 65,16

web y-y: b / tb ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d + σM,y,d - σM,z,d)/(σN,d + σM,y,d + σM,z,d)= -0,23
σ1web = (σN,d + σM,y,d + σM,z,d) = 19,1 kN/cm²
b / tb = 32,33 ≤ 94,72

buckling geometrie sky = 290 cm skz = 290 cm


β m,y = 1,10 β m,z = 1,00

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 97,87 ηKi,z,d = 108,59

λκ,y = sκ,y / iy = 38,9 λκ,z = sκ,z / iz = 36,9

λκ,y = λκ,y / λa = 0,50 λκ,z = λκ,z / λa = 0,48

buckling curve
y-Achse b z-Achse b
=> α = 0,34 => α = 0,34

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 48

Beiwerte: ky = 0,68 kz = 0,66


κy = 0,88 κz = 0,89
ay = -0,745 az = -0,789
ky = 1,034 kz = 1,036

Verification of lateral buckling:

Nd My,d x ky My,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d κ x Mpl,z,d

0,046 + 0,155 + 0,302 = 0,503 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 49

stresses/
max σ = 32,9 kN/cm2 < σR,d = 34,5 kN/cm2

cross section Box 400x400x24 calculated


material:A572 Gr.50 fy,k = 34,5 kN/cm²
γM = 1,0
z

h= 40,0 cm th = 2,4 cm
b= 40,0 cm tb = 2,4 cm
y
2
A= 360,96 cm
h
y Iy = 85398 cm4 Iz = 85398 cm4
Wy = 4270 cm3 Wz = 4270 cm3
iy = 15,38 cm iz = 15,38 cm

t z
b W pl,y = 5096 cm3 W pl,z = 5096 cm3
f= 1,19 f= 1,19

Npl,d = 12453,1 kN
Mpl,y,d = 1758,1 kNm Mpl,z,d = 1758,1 kNm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 50

stresses/inner forces
σN,d = 0,1 kN/cm² σM,y,d = 10,8 kN/cm² σM,z,d = 22,0 kN/cm²
Nd = 36,1 kN My,d = 461,2 kNm Mz,d = 939,4 kNm

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

web z-z: h / th ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d + σM,z,d)/(σN,d + σM,y,d + σM,z,d)= 0,34
σ1web = (σN,d + σM,y,d + σM,z,d) = 32,9 kN/cm²
h / th = 15,67 ≤ 50,62

web y-y: b / tb ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d + σM,y,d - σM,z,d)/(σN,d + σM,y,d + σM,z,d)= -0,34
σ1web = (σN,d + σM,y,d + σM,z,d) = 32,9 kN/cm²
b / tb = 15,67 ≤ 76,93

buckling geometrie sky = 290 cm skz = 290 cm


β m,y = 1,10 β m,z = 1,00

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 5830,60 ηKi,z,d = 5830,60

λκ,y = sκ,y / iy = 18,9 λκ,z = sκ,z / iz = 18,9

λκ,y = λκ,y / λa = 0,24 λκ,z = λκ,z / λa = 0,24

buckling curve
y-Achse c z-Achse c
=> α = 0,49 => α = 0,49

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 51

Beiwerte: ky = 0,54 kz = 0,54


κy = 0,98 κz = 0,98
ay = -0,244 az = -0,293
ky = 1,001 kz = 1,001

Verification of lateral buckling:

Nd My,d x ky My,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d κ x Mpl,z,d

0,003 + 0,262 + 0,535 = 0,800 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 52

4. Stress verification

4.4. Boom vertical beams

stresses/
max σ = 29,0 kN/cm2 < σR,d = 34,5 kN/cm2

cross section DT 200x200x14x8


material:A572 Gr.50 fy,k = 34,5 kN/cm²
z γM = 1,0

h= 20,0 cm th = 0,8 cm
b= 20,0 cm tb = 1,4 cm

2
A= 69,76 cm
4 4
y Iy = 5192 cm Iz = 1867 cm
y 3 3
th h Wy = 519 cm Wz = 187 cm
iy = 8,63 cm iz = 5,17 cm

iP = 10,06 cm
4
IT = 39,5 cm
tb z Iω = 161.517 cm
6
b

W pl,y = 580 cm3 W pl,z = 280 cm3


αy = 1,12 αz = 1,50

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 53

Npl,d = 2406,7 kN
Mpl,y,d = 200,1 kNm Mpl,z,d = 96,6 kNm

stability σN,d = 2,0 kN/cm² σM,y,d = 18,0 kN/cm² σM,z,d = 9,0 kN/cm²
Nd = 139,5 kN My,d = 93,5 kNm Mz,d = 16,8 kNm

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

Steg: b/t ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d - σM,y,d)/(σN,d + σM,y,d) = -0,80
σ1web = (σN,d + σM,y,d) = 20,0 kN/cm²
b/t = 23,25 ≤ 129,74

Flansch: b/t ≤ 19,7*(0,57-0,21*(ψ+0,07*ψ²)1/2*(240/(σ1*γM))1/2


ψflange = (σN,d + σM,y,d )/(σN,d + σM,y,d +σM,z,d) = 0,69
σ1flange = (σN,d + σM,y,d + σM,z,d) = 29,0 kN/cm²
b/t = 6,86 ≤ 12,13

buckling geometrie sky = 300 cm skz = 300 cm


torsional length x axis s0 = 300 cm

parameters
DIN 18800 Teil 2 Tab. 11 β m,y = 1,10 β m,z = 1,10
β M,y = 1,10 β M,z = 1,10

DIN 18800 Teil 2 Tab. 9 / 10 Trägerbeiwert n = 2 geschw. Träger


Faktor k n = 0,8
Momentenbeiwert ζ = 1,10

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 85,70 ηKi,z,d = 30,82

λκ,y = sκ,y / iy = 34,8 λκ,z = sκ,z / iz = 58,0

λκ,y = λκ,y / λa = 0,449 λκ,z = λκ,z / λa = 0,748

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 54

buckling curve y-Achse b z-Achse c


=> αy = 0,34 => αz = 0,49

parameters ky = 0,64 kz = 0,91


κy = 0,906 κz = 0,695
ay = -0,69 az = -0,85
ky = 1,04 kz = 1,07

Verification of lateral buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d Mpl,z,d

0,083 + 0,488 + 0,186 = 0,757 < 1

zp = 0,0 cm Lastangriffspunkt für


Querlasten
c² = 160,8 cm²

NKi,z = 4301 kN

NKi,z,d = 4301 kN

λK,z = 0,748
κz= 0,695
ay = -0,03 az = -0,85
ky = 1,00 kz = 1,07

MKi,y = 599,8 kNm

λM = √ Mpl,y,d / MKi,y,d = 0,58

κM = 0,91

Verification of lateral torsional buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κz x Npl,d κM x Mpl,y,d Mpl,z,d

0,083 + 0,516 + 0,186 = 0,786 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 55

stresses/inner forces
max σ = 27,9 kN/cm2 < σR,d = 34,5 kN/cm2

cross section DT 200x200x8x6


material:A572 Gr.50 fy,k = 34,5 kN/cm²
z γM = 1,0

h= 20,0 cm th = 0,6 cm
b= 20,0 cm tb = 0,8 cm

2
A= 43,04 cm
4 4
y Iy = 3262 cm Iz = 1067 cm
y 3 3
th h Wy = 326 cm Wz = 107 cm
iy = 8,71 cm iz = 4,98 cm

iP = 10,03 cm
4
IT = 8,2 cm
tb z Iω = 98.336 cm
6
b

W pl,y = 358 cm3 W pl,z = 160 cm3


αy = 1,10 αz = 1,50

Npl,d = 1484,9 kN
Mpl,y,d = 123,5 kNm Mpl,z,d = 55,2 kNm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 56

stability σN,d = 1,0 kN/cm² σM,y,d = 23,6 kN/cm² σM,z,d = 3,3 kN/cm²
Nd = 43,0 kN My,d = 77,0 kNm Mz,d = 3,5 kNm

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

Steg: b/t ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d - σM,y,d)/(σN,d + σM,y,d) = -0,92
σ1web = (σN,d + σM,y,d) = 24,6 kN/cm²
b/t = 32,00 ≤ 125,10

Flansch: b/t ≤ 19,7*(0,57-0,21*(ψ+0,07*ψ²)1/2*(240/(σ1*γM))1/2


ψflange = (σN,d + σM,y,d )/(σN,d + σM,y,d +σM,z,d) = 0,88
σ1flange = (σN,d + σM,y,d + σM,z,d) = 27,9 kN/cm²
b/t = 12,13 ≤ 12,15

buckling geometrie sky = 300 cm skz = 300 cm


torsional length x axis s0 = 300 cm

parameters
DIN 18800 Teil 2 Tab. 11 β m,y = 1,10 β m,z = 1,10
β M,y = 1,10 β M,z = 1,10

DIN 18800 Teil 2 Tab. 9 / 10 Trägerbeiwert n = 2 geschw. Träger


Faktor k n = 0,8
Momentenbeiwert ζ = 1,10

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 174,55 ηKi,z,d = 57,09

λκ,y = sκ,y / iy = 34,5 λκ,z = sκ,z / iz = 60,3

λκ,y = λκ,y / λa = 0,445 λκ,z = λκ,z / λa = 0,777

buckling curve y-Achse b z-Achse c


=> αy = 0,34 => αz = 0,49

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 57

parameters ky = 0,64 kz = 0,94


κy = 0,908 κz = 0,676
ay = -0,70 az = -0,90
ky = 1,02 kz = 1,04

Verification of lateral buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d Mpl,z,d

0,043 + 0,637 + 0,066 = 0,746 < 1

zp = 0,0 cm Lastangriffspunkt für


Querlasten
c² = 119,0 cm²

NKi,z = 2457 kN

NKi,z,d = 2457 kN

λK,z = 0,777
κz= 0,676
ay = -0,02 az = -0,90
ky = 1,00 kz = 1,04

MKi,y = 294,8 kNm

λM = √ Mpl,y,d / MKi,y,d = 0,65

κM = 0,87

Verification of lateral torsional buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κz x Npl,d κM x Mpl,y,d Mpl,z,d

0,043 + 0,716 + 0,066 = 0,825 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 58

4. Stress verification

4.5. Boom Bracing

stresses/inner forces
max σ = 9,4 kN/cm2 < σR,d = 30,0 kN/cm2

cross section HSS 3,5"x3,5"x3/16"


material:A500 Gr.50 fy,k = 30,0 kN/cm²
γM = 1,0
z
b h= 8,89 cm th = 0,47 cm
b= 8,89 cm tb = 0,47 cm

2
A= 15,40 cm
Iy = 178 cm4 Iz = 178 cm4
h y
t
Wy = 40 cm3 Wz = 40,0 cm3
iy = 3,40 cm iz = 3,40 cm

W pl,y = 48 cm3 W pl,z = 48 cm3


f= 1,20 f= 1,20

Npl,d = 462,0 kN
Mpl,y,d = 14,4 kNm Mpl,z,d = 14,4 kNm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 59

stresses/inner forces
σN,d = 9,2 kN/cm² σM,y,d = 0,0 kN/cm² σM,z,d = 0,0 kN/cm²
Nd = 141,7 kN My,d = 0,0 kNm Mz,d = 0,0 kNm

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

web z-z: h / th ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d + σM,z,d)/(σN,d + σM,y,d + σM,z,d)= 1,00
σ1web = (σN,d + σM,y,d + σM,z,d) = 9,2 kN/cm²
h / th = 17,91 ≤ 61,02

web y-y: b / tb ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d + σM,y,d - σM,z,d)/(σN,d + σM,y,d + σM,z,d)= 1,00
σ1web = (σN,d + σM,y,d + σM,z,d) = 9,2 kN/cm²
b / tb = 17,91 ≤ 61,02

buckling geometrie sky = 355 cm skz = 355 cm


β m,y = 1,10 bm,z = 1,00

slenderness ratio λa = π√ E / fy,k = 83,1

ηKi,y,d = 2,07 ηKi,z,d = 2,07

λκ,y = sκ,y / iy = 104,4 λκ,z = sκ,z / iz = 104,4

λκ,y = λκ,y / λa = 1,26 λκ,z = λκ,z / λa = 1,26

buckling curve
y-Achse b z-Achse b
=> α = 0,34 => α = 0,34

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 60

parameters ky = 1,47 kz = 1,47


κy = 0,45 κz = 0,45
ay = -2,063 az = -2,314
ky = 1,500 kz = 1,500

Verification of lateral buckling:

Nd + My,d x ky + My,d x kz < 1


κmin x Npl,d Mpl,y,d κ x Mpl,z,d

0,684 + 0,000 + 0,000 = 0,684 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 61

stresses
max σ = 23,1 kN/cm2 < σR,d = 30,0 kN/cm2

cross section HSS 5"x5"x3/16"


material:A500 Gr.50 fy,k = 30,0 kN/cm²
γM = 1,0
z
b
h= 12,70 cm t= 0,48 cm
b= 12,70 cm tb = 0,48 cm

2
A= 22,7 cm
4 4
h y Iy = 559 cm Iz = 559 cm
3 3
t Wy = 88 cm Wz = 88 cm
iy = 4,96 cm iz = 4,96 cm

W pl,y = 103 cm3 W pl,z = 103 cm3


αy = 1,17 αz = 1,17

Npl,d = 681,0 kN
Mpl,y,d = 30,9 kNm Mpl,z,d = 30,9 kNm

Tension only member, no further check required.

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 62

4. Stress verification

4.6. Adapter horizontal beam for belt support

stresses/inner forces
max σ = 19,6 kN/cm2 < σR,d = 34,5 kN/cm2

cross section DT 214x200x14x8


material:A572 Gr.50 fy,k = 34,5 kN/cm²
z γM = 1,0

h= 21,4 cm th = 0,8 cm
b= 20,0 cm tb = 1,4 cm

2
A= 70,88 cm
4 4
y Iy = 6038 cm Iz = 1868 cm
y 3 3
th h Wy = 564 cm Wz = 187 cm
iy = 9,23 cm iz = 5,13 cm

iP = 10,56 cm
4
IT = 39,8 cm
tb z Iω = 186.752 cm
6
b

W pl,y = 629 cm3 W pl,z = 280 cm3


αy = 1,11 αz = 1,50

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 63

Npl,d = 2445,4 kN
Mpl,y,d = 217,1 kNm Mpl,z,d = 96,6 kNm

stability σN,d = 1,5 kN/cm² σM,y,d = 8,1 kN/cm² σM,z,d = 3,3 kN/cm²
Nd = 106,3 kN My,d = 45,7 kNm Mz,d = 6,2 kNm
Maximum compression stresses!

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

Steg: b/t ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d - σM,y,d)/(σN,d + σM,y,d) = -0,69
σ1web = (σN,d + σM,y,d) = 9,6 kN/cm²
b/t = 25,00 ≤ 175,40

Flansch: b/t ≤ 19,7*(0,57-0,21*(ψ+0,07*ψ²)1/2*(240/(σ1*γM))1/2


ψflange = (σN,d + σM,y,d )/(σN,d + σM,y,d +σM,z,d) = 0,74
σ1flange = (σN,d + σM,y,d + σM,z,d) = 12,9 kN/cm²
b/t = 6,86 ≤ 18,08

buckling geometrie sky = 275 cm skz = 275 cm


torsional length x axis s0 = 275 cm

parameters
DIN 18800 Teil 2 Tab. 11 β m,y = 1,10 β m,z = 1,10
β M,y = 1,10 β M,z = 1,10

DIN 18800 Teil 2 Tab. 9 / 10 Trägerbeiwert n = 2 geschw. Träger


Faktor k n = 0,8
Momentenbeiwert ζ = 1,10

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 155,65 ηKi,z,d = 48,14

λκ,y = sκ,y / iy = 29,8 λκ,z = sκ,z / iz = 53,6

λκ,y = λκ,y / λa = 0,384 λκ,z = λκ,z / λa = 0,691

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 64

buckling curve y-Achse b z-Achse c


=> αy = 0,34 => αz = 0,49

parameters ky = 0,61 kz = 0,86


κy = 0,932 κz = 0,730
ay = -0,58 az = -0,74
ky = 1,03 kz = 1,04

Verification of lateral buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d Mpl,z,d

0,060 + 0,216 + 0,067 = 0,342 < 1

zp = 0,0 cm Lastangriffspunkt für


Querlasten
c² = 162,8 cm²

NKi,z = 5118 kN

NKi,z,d = 5118 kN

λK,z = 0,691
κz= 0,730
ay = -0,04 az = -0,74
ky = 1,00 kz = 1,04

MKi,y = 718,3 kNm

λM = √ Mpl,y,d / MKi,y,d = 0,55

κM = 0,92

Verification of lateral torsional buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κz x Npl,d κM x Mpl,y,d Mpl,z,d

0,060 + 0,229 + 0,067 = 0,356 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 65

4. Stress verification

4.7. Adapter main wall beams

stresses
max σ = 26,5 kN/cm2 < σR,d = 34,5 kN/cm2

cross section DT 272x300x16x8


material:A572 Gr.50 fy,k = 34,5 kN/cm²
z γM = 1,0

h= 27,2 cm th = 0,8 cm
b= 30,0 cm tb = 1,6 cm

2
A= 115,2 cm
4 4
y Iy = 16671 cm Iz = 7201 cm
y 3 3
th h Wy = 1226 cm Wz = 480 cm
iy = 12,03 cm iz = 7,91 cm

iP = 14,40 cm
4
IT = 86,0 cm
tb z Iω = 1.179.827 cm
6
b

W pl,y = 1344 cm3 W pl,z = 720 cm3


αy = 1,10 αz = 1,50

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 66

Npl,d = 3974,4 kN
Mpl,y,d = 463,7 kNm Mpl,z,d = 248,4 kNm

stability σN,d = 20,7 kN/cm² σM,y,d = 3,5 kN/cm² σM,z,d = 2,5 kN/cm²
Nd = 2384,6 kN My,d = 42,9 kNm Mz,d = 12,0 kNm

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

Steg: b/t ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d - σM,y,d)/(σN,d + σM,y,d) = 0,71
σ1web = (σN,d + σM,y,d) = 24,2 kN/cm²
b/t = 32,00 ≤ 46,00

Flansch: b/t ≤ 19,7*(0,57-0,21*(ψ+0,07*ψ²)1/2*(240/(σ1*γM))1/2


ψflange = (σN,d + σM,y,d )/(σN,d + σM,y,d +σM,z,d) = 0,91
σ1flange = (σN,d + σM,y,d + σM,z,d) = 26,7 kN/cm²
b/t = 9,13 ≤ 12,35

buckling geometrie sky = 340 cm skz = 170 cm


torsional length x axis s0 = 170 cm

parameters
DIN 18800 Teil 2 Tab. 11 β m,y = 1,10 β m,z = 1,10
β M,y = 1,10 β M,z = 1,10

DIN 18800 Teil 2 Tab. 9 / 10 Trägerbeiwert n = 2 geschw. Träger


Faktor k n = 0,8
Momentenbeiwert ζ = 1,10

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 12,53 ηKi,z,d = 21,66

λκ,y = sκ,y / iy = 28,3 λκ,z = sκ,z / iz = 21,5

λκ,y = λκ,y / λa = 0,365 λκ,z = λκ,z / λa = 0,277

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 67

buckling curve y-Achse b z-Achse c


=> αy = 0,34 => αz = 0,49

parameters ky = 0,59 kz = 0,56


κy = 0,940 κz = 0,961
ay = -0,56 az = 0,00
ky = 1,36 kz = 1,00

Verification of lateral buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d Mpl,z,d

0,638 + 0,126 + 0,048 = 0,812 < 1

zp = 0,0 cm Lastangriffspunkt für


Querlasten
c² = 177,3 cm²

NKi,z = 51644 kN

NKi,z,d = 51644 kN

λK,z = 0,277
κz= 0,961
ay = -0,10 az = 0,00
ky = 1,00 kz = 1,00

MKi,y = 7564,3 kNm

λM = √ Mpl,y,d / MKi,y,d = 0,25

κM = 1,00

Verification of lateral torsional buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κz x Npl,d κM x Mpl,y,d Mpl,z,d

0,625 + 0,093 + 0,048 = 0,765 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 68

stresses
max σ = 22,5 kN/cm2 < σR,d = 34,5 kN/cm2

cross section DT 300x300x20x8


material:A572 Gr.50 fy,k = 34,5 kN/cm²
z γM = 1,0

h= 30,0 cm th = 0,8 cm
b= 30,0 cm tb = 2,0 cm

2
A= 140,8 cm
4 4
y Iy = 24732 cm Iz = 9001 cm
y 3 3
th h Wy = 1649 cm Wz = 600 cm
iy = 13,25 cm iz = 8,00 cm

iP = 15,48 cm
4
IT = 164,4 cm
tb z Iω = 1.764.234 cm
6
b

W pl,y = 1815 cm3 W pl,z = 900 cm3


αy = 1,10 αz = 1,50

Npl,d = 4857,6 kN
Mpl,y,d = 626,2 kNm Mpl,z,d = 310,5 kNm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 69

stability σN,d = 7,4 kN/cm² σM,y,d = 10,0 kN/cm² σM,z,d = 5,2 kN/cm²
Nd = 1041,9 kN My,d = 164,9 kNm Mz,d = 31,2 kNm

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

Steg: b/t ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d)/(σN,d + σM,y,d) = -0,15
σ1web = (σN,d + σM,y,d) = 17,4 kN/cm²
b/t = 35,00 ≤ 95,31

Flansch: b/t ≤ 19,7*(0,57-0,21*(ψ+0,07*ψ²)1/2*(240/(σ1*γM))1/2


ψflange = (σN,d + σM,y,d )/(σN,d + σM,y,d +σM,z,d) = 0,77
σ1flange = (σN,d + σM,y,d + σM,z,d) = 22,6 kN/cm²
b/t = 7,30 ≤ 13,62

buckling geometrie sky = 342 cm skz = 2*342 = 684 cm


torsional length x axis s0 = 342 cm

parameters
DIN 18800 Teil 2 Tab. 11 β m,y = 0,66 β m,z = 0,66
β M,y = 1,80 β M,z = 1,80

DIN 18800 Teil 2 Tab. 9 / 10 Trägerbeiwert n = 2 geschw. Träger


Faktor k n = 0,8
Momentenbeiwert ζ = 1,77

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 42,06 ηKi,z,d = 3,83

λκ,y = sκ,y / iy = 25,8 λκ,z = sκ,z / iz = 85,5

λκ,y = λκ,y / λa = 0,333 λκ,z = λκ,z / λa = 1,104

buckling curve y-Achse b z-Achse c


=> αy = 0,34 => αz = 0,49

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 70

parameters ky = 0,58 kz = 1,33


κy = 0,952 κz = 0,482
ay = -0,03 az = 0,06
ky = 1,01 kz = 0,97

Verification of lateral buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d Mpl,z,d

0,445 + 0,265 + 0,098 = 0,808 < 1

zp = 0,0 cm Lastangriffspunkt für


Querlasten
c² = 279,3 cm²

NKi,z = 15950 kN

NKi,z,d = 15950 kN

λK,z = 0,552
κz= 0,482
ay = 0,00 az = 0,06
ky = 1,00 kz = 0,97

MKi,y = 4718,5 kNm

λM = √ Mpl,y,d / MKi,y,d = 0,36

κM = 1,00

Verification of lateral torsional buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κz x Npl,d κM x Mpl,y,d Mpl,z,d

0,445 + 0,263 + 0,098 = 0,806 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 71

stresses
max σ = 24,5 kN/cm2 < σR,d = 34,5 kN/cm2

cross section DT 300x300x16x8


material:A572 Gr.50 fy,k = 34,5 kN/cm²
z γM = 1,0

h= 30,0 cm th = 0,8 cm
b= 30,0 cm tb = 1,6 cm

2
A= 117,44 cm
4 4
y Iy = 20661 cm Iz = 7201 cm
y 3 3
th h Wy = 1377 cm Wz = 480 cm
iy = 13,26 cm iz = 7,83 cm

iP = 15,40 cm
4
IT = 86,5 cm
tb z Iω = 1.452.052 cm
6
b

W pl,y = 1507 cm3 W pl,z = 720 cm3


αy = 1,09 αz = 1,50

Npl,d = 4051,7 kN
Mpl,y,d = 519,9 kNm Mpl,z,d = 248,4 kNm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 72

stability σN,d = 0,2 kN/cm² σM,y,d = 13,8 kN/cm² σM,z,d = 6,5 kN/cm²
Nd = 23,5 kN My,d = 190,1 kNm Mz,d = 31,2 kNm
σ N,d , σ M,y,d , σ M,z,d are maximum single stresses and not associating!

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

Steg: b/t ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d)/(σN,d + σM,y,d) = -0,97
σ1web = (σN,d + σM,y,d) = 14,0 kN/cm²
b/t = 35,50 ≤ 170,72

Flansch: b/t ≤ 19,7*(0,57-0,21*(ψ+0,07*ψ²)1/2*(240/(σ1*γM))1/2


ψflange = (σN,d + σM,y,d )/(σN,d + σM,y,d +σM,z,d) = 0,68
σ1flange = (σN,d + σM,y,d + σM,z,d) = 20,5 kN/cm²
b/t = 9,13 ≤ 14,44

buckling geometrie sky = 340 cm skz = 340 cm


torsional length x axis s0 = 340 cm

parameters
DIN 18800 Teil 2 Tab. 11 β m,y = 1,10 β m,z = 1,10
β M,y = 1,10 β M,z = 1,10

DIN 18800 Teil 2 Tab. 9 / 10 Trägerbeiwert n = 2 geschw. Träger


Faktor k n = 0,8
Momentenbeiwert ζ = 1,10

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 1577,14 ηKi,z,d = 549,69

λκ,y = sκ,y / iy = 25,6 λκ,z = sκ,z / iz = 43,4

λκ,y = λκ,y / λa = 0,331 λκ,z = λκ,z / λa = 0,560

buckling curve y-Achse b z-Achse c


=> αy = 0,34 => αz = 0,49

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 73

parameters ky = 0,58 kz = 0,75


κy = 0,953 κz = 0,809
ay = -0,50 az = -0,51
ky = 1,00 kz = 1,00

Verification of lateral buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d Mpl,z,d

0,007 + 0,367 + 0,126 = 0,500 < 1

zp = 0,0 cm Lastangriffspunkt für


Querlasten
c² = 255,8 cm²

NKi,z = 12911 kN

NKi,z,d = 12911 kN

λK,z = 0,560
κz= 0,809
ay = -0,06 az = -0,51
ky = 1,00 kz = 1,00

MKi,y = 2271,4 kNm

λM = √ Mpl,y,d / MKi,y,d = 0,48

κM = 0,95

Verification of lateral torsional buckling:

Nd My,d x ky Mz,d x kz
+ + < 1
κz x Npl,d κM x Mpl,y,d Mpl,z,d

0,007 + 0,387 + 0,126 = 0,520 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 74

4. Stress verification

4.8. Adapter horizontal cross beams

stresses/inner forces
max σ = 14,3 kN/cm2 < σR,d = 34,5 kN/cm2

cross section Box 200x200x8 calculated


material:A572 Gr.50 fy,k = 34,5 kN/cm²
γM = 1,0
z

h= 20,0 cm th = 0,8 cm
b= 20,0 cm tb = 0,8 cm
y
2
A= 61,44 cm
h
y Iy = 3781 cm4 Iz = 3781 cm4
Wy = 378 cm3 Wz = 378 cm3
iy = 7,85 cm iz = 7,85 cm

t z
b W pl,y = 443 cm3 W pl,z = 443 cm3
f= 1,17 f= 1,17

Npl,d = 2119,7 kN
Mpl,y,d = 152,8 kNm Mpl,z,d = 152,8 kNm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 75

stresses/inner forces
σN,d = 1,4 kN/cm² σM,y,d = 6,0 kN/cm² σM,z,d = 11,7 kN/cm²
Nd = 86,0 kN My,d = 22,7 kNm Mz,d = 44,2 kNm
σ N,d , σ M,y,d , σ M,z,d are maximum single stresses and not associating!

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

web z-z: h / th ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d + σM,z,d)/(σN,d + σM,y,d + σM,z,d)= 0,37
σ1web = (σN,d + σM,y,d + σM,z,d) = 19,1 kN/cm²
h / th = 24,00 ≤ 65,16

web y-y: b / tb ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d + σM,y,d - σM,z,d)/(σN,d + σM,y,d + σM,z,d)= -0,23
σ1web = (σN,d + σM,y,d + σM,z,d) = 19,1 kN/cm²
b / tb = 24,00 ≤ 94,72

buckling geometrie sky = 290 cm skz = 290 cm


β m,y = 1,10 β m,z = 1,00

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 108,34 ηKi,z,d = 108,34

λκ,y = sκ,y / iy = 37,0 λκ,z = sκ,z / iz = 37,0

λκ,y = λκ,y / λa = 0,48 λκ,z = λκ,z / λa = 0,48

buckling curve
y-Achse b z-Achse b
=> α = 0,34 => α = 0,34

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 76

Beiwerte: ky = 0,66 kz = 0,66


κy = 0,89 κz = 0,89
ay = -0,687 az = -0,782
ky = 1,031 kz = 1,035

Verification of lateral buckling:

Nd My,d x ky My,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d κ x Mpl,z,d

0,045 + 0,153 + 0,300 = 0,498 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 77

stresses/inner forces
max σ = 27,3 kN/cm2 < σR,d = 34,5 kN/cm2

cross section Box 548x424x24 calculated


material:A572 Gr.50 fy,k = 34,5 kN/cm²
γM = 1,0

z
h= 42,4 cm th = 2,4 cm
b= 54,8 cm tb = 2,4 cm
y
2
A= 443,52 cm
h
Iy = 126605 cm4 Iz = 189802 cm4
y
Wy = 5972 cm3 Wz = 6927 cm3
iy = 16,90 cm iz = 20,69 cm
z
t W pl,y = 6957 cm3 W pl,z = 8332 cm3
b
f= 1,16 f= 1,20

Npl,d = 15301,4 kN
Mpl,y,d = 2400,2 kNm Mpl,z,d = 2874,5 kNm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 78

stresses/inner forces
σN,d = 2,1 kN/cm² σM,y,d = 10,0 kN/cm² σM,z,d = 16,3 kN/cm²
Nd = 931,4 kN My,d = 597,2 kNm Mz,d = 1129,1 kNm
σ N,d , σ M,y,d , σ M,z,d are maximum single stresses and not associating!

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

web z-z: h / th ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d + σM,z,d)/(σN,d + σM,y,d + σM,z,d)= 0,30
σ1web = (σN,d + σM,y,d + σM,z,d) = 28,4 kN/cm²
h / th = 16,67 ≤ 56,30

web y-y: b / tb ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d + σM,y,d - σM,z,d)/(σN,d + σM,y,d + σM,z,d)= -0,15
σ1web = (σN,d + σM,y,d + σM,z,d) = 28,4 kN/cm²
b / tb = 21,83 ≤ 74,55

buckling geometrie sky = 290 cm skz = 290 cm


β m,y = 1,10 β m,z = 1,00

slenderness ratio λa = π√ E / fy,k = 77,5

ηKi,y,d = 335,00 ηKi,z,d = 502,22

λκ,y = sκ,y / iy = 17,2 λκ,z = sκ,z / iz = 14,0

λκ,y = λκ,y / λa = 0,22 λκ,z = λκ,z / λa = 0,18

buckling curve
y-Achse c z-Achse c
=> α = 0,49 => α = 0,49

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 79

Beiwerte: ky = 0,53 kz = 0,51


κy = 0,99 κz = 1,00
ay = -0,234 az = -0,159
ky = 1,014 kz = 1,010

Verification of lateral buckling:

Nd My,d x ky My,d x kz
+ + < 1
κmin x Npl,d Mpl,y,d κ x Mpl,z,d

0,062 + 0,252 + 0,397 = 0,711 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 80

4. Stress verification

4.9. Adapter bracings

stresses
max σ = 14,1 kN/cm2 < σR,d = 30,0 kN/cm2
Tensile stresses!

cross section HSS 3,5"x3,5"x3/16"


material:A500 Gr.50 fy,k = 30,0 kN/cm²
γM = 1,0
z
b h= 8,89 cm th = 0,47 cm
b= 8,89 cm tb = 0,47 cm

2
A= 15,40 cm

y Iy = 178 cm4 Iz = 178 cm4


h
t
Wy = 40 cm3 Wz = 40,0 cm3
iy = 3,40 cm iz = 3,40 cm

W pl,y = 48 cm3 W pl,z = 48 cm3


f= 1,20 f= 1,20

Npl,d = 462,0 kN
Mpl,y,d = 14,4 kNm Mpl,z,d = 14,4 kNm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 81

stresses/inner forces
σN,d = 6,0 kN/cm² σM,y,d = 0,0 kN/cm² σM,z,d = 0,0 kN/cm²
Nd = 92,4 kN My,d = 0,0 kNm Mz,d = 0,0 kNm

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

web z-z: h / th ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d + σM,z,d)/(σN,d + σM,y,d + σM,z,d)= 1,00
σ1web = (σN,d + σM,y,d + σM,z,d) = 6,0 kN/cm²
h / th = 17,91 ≤ 75,55

web y-y: b / tb ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d + σM,y,d - σM,z,d)/(σN,d + σM,y,d + σM,z,d)= 1,00
σ1web = (σN,d + σM,y,d + σM,z,d) = 6,0 kN/cm²
b / tb = 17,91 ≤ 75,55

buckling geometrie sky = 320 cm skz = 320 cm


β m,y = 1,10 bm,z = 1,00

slenderness ratio λa = π√ E / fy,k = 83,1

ηKi,y,d = 3,90 ηKi,z,d = 3,90

λκ,y = sκ,y / iy = 94,1 λκ,z = sκ,z / iz = 94,1

λκ,y = λκ,y / λa = 1,13 λκ,z = λκ,z / λa = 1,13

buckling curve
y-Achse b z-Achse b
=> α = 0,34 => α = 0,34

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 82

parameters ky = 1,30 kz = 1,30


κy = 0,52 κz = 0,52
ay = -1,840 az = -2,066
ky = 1,500 kz = 1,500

Verification of lateral buckling:

Nd + My,d x ky + My,d x kz < 1


κmin x Npl,d Mpl,y,d κ x Mpl,z,d

0,388 + 0,000 + 0,000 = 0,388 < 1

stresses
max σ = 12,4 kN/cm2 < σR,d = 30,0 kN/cm2

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 83

cross section HSS 3,5"x3,5"x3/16"


material:A500 Gr.50 fy,k = 30,0 kN/cm²
γM = 1,0
z
b h= 8,89 cm th = 0,47 cm
b= 8,89 cm tb = 0,47 cm

2
A= 15,40 cm

y Iy = 178 cm4 Iz = 178 cm4


h
t
Wy = 40 cm3 Wz = 40,0 cm3
iy = 3,40 cm iz = 3,40 cm

W pl,y = 48 cm3 W pl,z = 48 cm3


f= 1,20 f= 1,20

Npl,d = 462,0 kN
Mpl,y,d = 14,4 kNm Mpl,z,d = 14,4 kNm

stresses/inner forces
σN,d = 12,3 kN/cm² σM,y,d = 2,0 kN/cm² σM,z,d = 1,5 kN/cm²
Nd = 189,4 kN My,d = 0,8 kNm Mz,d = 0,6 kNm
σ N,d , σ M,y,d , σ M,z,d are maximum single stresses and not associating!

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

web z-z: h / th ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d + σM,z,d)/(σN,d + σM,y,d + σM,z,d)= 0,75
σ1web = (σN,d + σM,y,d + σM,z,d) = 15,8 kN/cm²
h / th = 17,91 ≤ 55,54

web y-y: b / tb ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d + σM,y,d - σM,z,d)/(σN,d + σM,y,d + σM,z,d)= 0,81
σ1web = (σN,d + σM,y,d + σM,z,d) = 15,8 kN/cm²
b / tb = 17,91 ≤ 53,18

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 84

buckling geometrie sky = 290 cm skz = 290 cm


β m,y = 1,10 bm,z = 1,00

slenderness ratio λa = π√ E / fy,k = 83,1

ηKi,y,d = 2,32 ηKi,z,d = 2,32

λκ,y = sκ,y / iy = 85,3 λκ,z = sκ,z / iz = 85,3

λκ,y = λκ,y / λa = 1,03 λκ,z = λκ,z / λa = 1,03

buckling curve
y-Achse b z-Achse b
=> α = 0,34 => α = 0,34

parameters ky = 1,17 kz = 1,17


κy = 0,58 κz = 0,58
ay = -1,649 az = -1,854
ky = 1,500 kz = 1,500

Verification of lateral buckling:

Nd + My,d x ky + My,d x kz < 1


κmin x Npl,d Mpl,y,d κ x Mpl,z,d

0,706 + 0,083 + 0,063 = 0,852 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 85

stresses
max σ = 8,5 kN/cm2 < σR,d = 30,0 kN/cm2

cross section HSS 3,5"x3,5"x3/16"


material:A500 Gr.50 fy,k = 30,0 kN/cm²
γM = 1,0
z
b h= 12,70 cm th = 0,48 cm
b= 12,70 cm tb = 0,48 cm

2
A= 22,7 cm

y Iy = 559 cm4 Iz = 559 cm4


h
t
Wy = 88 cm3 Wz = 88,0 cm3
iy = 4,96 cm iz = 4,96 cm

W pl,y = 103 cm3 W pl,z = 103 cm3


f= 1,17 f= 1,17

Npl,d = 681,0 kN
Mpl,y,d = 30,9 kNm Mpl,z,d = 30,9 kNm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 86

stresses/inner forces
σN,d = 8,5 kN/cm² σM,y,d = 0,0 kN/cm² σM,z,d = 0,0 kN/cm²
Nd = 193,0 kN My,d = 0,0 kNm Mz,d = 0,0 kNm

check b/t Method Elastic - Elastic DIN 18800 Part 1, Table 12

web z-z: h / th ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


1/2 1/2
≤ 27,1*(7,81 - 6,29*ψ + 9,78*ψ²) *(240/(σ1*γM)) 0 > ψ > -1
ψweb = (σN,d - σM,y,d + σM,z,d)/(σN,d + σM,y,d + σM,z,d)= 1,00
σ1web = (σN,d + σM,y,d + σM,z,d) = 8,5 kN/cm²
h / th = 25,46 ≤ 63,48

web y-y: b / tb ≤ 27,1*(1 - 0,278*ψ - 0,025*ψ²)*(8,2/(ψ+1,05))1/2*(240/(σ1*γM))1/2 1>ψ>0


27,1*(7,81 - 6,29*ψ + 9,78*ψ²)1/2*(240/(σ1*γM))1/2 0 > ψ > -1
ψweb = (σN,d + σM,y,d - σM,z,d)/(σN,d + σM,y,d + σM,z,d)= 1,00
σ1web = (σN,d + σM,y,d + σM,z,d) = 8,5 kN/cm²
b / tb = 25,46 ≤ 63,48

buckling geometrie sky = 175 cm skz = 175 cm


β m,y = 1,10 bm,z = 1,00

slenderness ratio λa = π√ E / fy,k = 83,1

ηKi,y,d = 19,61 ηKi,z,d = 19,61

λκ,y = sκ,y / iy = 35,3 λκ,z = sκ,z / iz = 35,3

λκ,y = λκ,y / λa = 0,42 λκ,z = λκ,z / λa = 0,42

buckling curve
y-Achse b z-Achse b
=> α = 0,34 => α = 0,34

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 87

parameters ky = 0,63 kz = 0,63


κy = 0,92 κz = 0,92
ay = -0,594 az = -0,679
ky = 1,184 kz = 1,210

Verification of lateral buckling:

Nd + My,d x ky + My,d x kz < 1


κmin x Npl,d Mpl,y,d κ x Mpl,z,d

0,309 + 0,000 + 0,000 = 0,309 < 1

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 88

4. Stress verification

4.10. FE-Detail for Mounting the Cylinder at Boom

material: A572 Gr.50

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 89

Fx = 758 kN
Fy = 485 kN

t = 24 mm

t = 40 mm

FE-Modell with plate thickness and forces

Equivalent stress σeqv [N/mm 2]


Proof of stress according to DIN 18800 part 1:
max σeqv = 302 N/mm 2 < σR,d = 345 N/mm 2

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 90

4.11. FE-Detail for Mounting the Cylinder at Adapter

F = 900 kN

350

N
460

560

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 91

Maximum tension force on one bolt

Rd = 5*N*56+4*46/56*N*46 = 431*N

Sd = 900*35 = 31500 kNcm

N = ft = 31500/431 = 73 kN

High-strength bolts - ASTM A 325 Diameter 1"

yield stress fy,b,k = 62 kN/cm 2

Ft = 236 kN AISC 13th Editon

ft/Ft = 0,31 < 1,0

Proof of shear force:

No of shear planes n= 1,0

total shear force V = 900 kN

number of bolts: 24

shear force on one bolt Vg = fv = 37,5 kN

Fv = 125 kN AISC 13th Editon


Threads in shear plane

fv/Fv = 0,30 < 1,0

Combined tension and shaer

F'nt = 306,8 -94,4 = 212,4 < 236,0

Proof of bearing stresses:

tPL = 40 mm
d= 25,4 mm

fP = fv/A = 3,7 kN/cm²

FP = 80,6 kN/cm² AISC 13th Editon


ASTM A572 Grade 50

fp/Fp = 0,05 < 1,0

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 92

4. Stress verification

4.12. FE-Detail for Safety Rod

material: A572 Gr.50

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 93

Fx = 450kN
t = 25 mm

t = 40 mm

Equivalent stress σeqv [N/mm 2]


Proof of stress according to DIN 18800 part 1:
max σeqv = 160 N/mm 2 < σR,d = 345 N/mm 2

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 94

4.13. Mounting of Safety Rod

Fx = 758 kN
Fy = 485 kN

t = 40 mm

FE-Modell with plate thickness and forces

Equivalent stress σeqv [N/mm 2]

Proof of stress according to DIN 18800 part 1:

max σeqv = 282 N/mm 2 < σR,d = 345 N/mm 2

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 95

Lower pins safety rod

Geometry and loads

L1
D= 120,0 mm

FF
W= 169646 mm³

L= 95,0 mm

D t1 = 40 mm
D

t2 = 40 mm

F/2
F/2 s= L-t1/2-t2/2
B2
t1 s= 55 mm
B1
t2

LL2

Fax [kN] Faz [kN] R [kN] requ. safety


900 0 900 1,25 Safety according to DIN 18800, Part 1, Formula (67)

Steel grade σy σU
Pin 42CrMo4V 550,0 800,0 [N/mm²]

Reduced yield strength σ' = σy/ν


τ' = σ'/1,732
Pin
σ' 440,0 [N/mm²]
τ' 254,0 [N/mm²]

Shearing τm = 4*Q/(P*D²)
Q = F/2
max τ = 1,5*τm
Pin
τm 39,8 [N/mm²]
max τ 59,7 [N/mm²]
Utilization [%] 23

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 96

Bolt bending σ= Mb/W

Pin
Mb *) 38250000 [Nmm] *) Mb = F/8 (t2 + 4s + 2t1)
σ 225,5 [N/mm²] See DIN 18800, Part 1, Picture 27
Utilization [%] 51

Von Mises Stresses σv = [σ/σ']² + [τm/τ']²


Pin
σv 0,287 [N/mm²]

Bearing stresses
t1 t2
40 40 [mm]
σlt1 94 188 [N/mm²]
σlt1 345 345 [N/mm²] σy of steel grade ASTM A572, Grade 50
Utilization [%] 27 54

Upper pins safety rod

Geometry and loads

L
L1
D= 120 mm

F/2 F/2
W= 169646 mm³
F/2 F/2
L1= 400 mm

L2= 190 mm
DD

t1 = 40 mm

t2 = 40 mm
F/2 Bt21 F/2

B2
t1 L2
L2
LL1
3

Fax [kN] Faz [kN] R [kN] requ. safety


900 0 900 1,25 Safety according to DIN 18800, Part 1, Formula (67)

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 97

Steel grade σy σU
Pin 42CrMo4V 550,0 800,0 [N/mm²]

Reduced yield strength σ' = σy/ν


τ' = σ'/1,732
Pin
σ' 440,0 [N/mm²]
τ' 254,0 [N/mm²]

Shearing τm = 4*Q/(P*D²)
Q = F/2
max τ = 1,5*τm
Pin
τm 39,8 [N/mm²]
max τ 59,7 [N/mm²]
Utilization [%] 23

Bolt bending σ= Mb/W

Pin
Mb 47250000 [Nmm] Mb = F/2*(L1-L2)/2
σ 278,5 [N/mm²]
Utilization [%] 63

Von Mises Stresses σv = [σ/σ']² + [τm/τ']²


Pin
σv 0,425 [N/mm²]

Bearing stresses
t1 t2
40 40 [mm]
σlt1 94 94 [N/mm²]
σlt1 345 345 [N/mm²] σy of steel grade ASTM A572, Grade 50
Utilization [%] 27 27

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 98

4. Stress verification

4.14. FE-Detail for Support of the Adapter

material: A572 Gr.50

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 99

Lower support point

t = 40 mm Fx = -2400kN

t = 80 mm

Equivalent stress σeqv [N/mm 2]


Proof for bearing pressure according to DIN 18800 part 1:
d= 120 mm t= 80 mm
with σL = F/(d*t) and F= 2380 kN
σL = 247 N/mm 2
< σR,d = 517,5 N/mm 2 = 1,5*fy,k

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 100

Contact pressure according to Hertz assuming 1 mm gap between the diameter of bolt and hole:

r1 60,0 mm
r2 -60,5 mm
1/r 0,000138 1/mm
F 2400000 N with
E 210000 N/mm^2 max σ = √ FE/(2πrl(1-ν2))
r 7260 mm
l 80 mm
ν 0,3

max σ 389,6 N/mm^2 < σR,d ≈ 1200 N/mm 2 = 3,5*fy,k


a 49,0 mm

The calculated equivalent stress is smaller than both stress criteria.


max σeqv = 351 N/mm 2 < σR,d = 517,5 N/mm 2 = 1,5*fy,k

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 101

Upper support point

t = 40 mm Fx = 2100 kN

t = 80 mm

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 102

Equivalent stress σeqv [N/mm 2]

Proof of stress according to DIN 18800 part 1:

max σeqv = 294 N/mm 2 < σR,d = 345 N/mm 2

Proof for bearing pressure according to DIN 18800 part 1:


d= 120 mm t= 80 mm

with σL = F/(d*t) and F= 2380 kN


σL = 247 N/mm 2
< σR,d = 517,5 N/mm 2 = 1,5*fy,k

Contact pressure according to Hertz assuming 1 mm gap between the diameter of bolt and hole:

r1 60,0 mm
r2 -60,5 mm
1/r 0,000138 1/mm
F 2100000 N with
E 210000 N/mm^2 max σ = √ FE/(2πrl(1-ν2))
r 7260 mm
l 80 mm
ν 0,3

max σ 364,4 N/mm^2 < σR,d ≈ 1200 N/mm 2 = 3,5*fy,k


a 45,9 mm

The calculated equivalent stress is smaller than both stress criteria.


max σeqv = 294 N/mm 2 < σR,d = 517,5 N/mm 2 = 1,5*fy,k

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 103

4. Stress verification

4.15. Verification of pins (DIN 18800)

B)
A)

C)

A) Pins between luffing boom and adapter

Geometry and loads

L1
D= 120,0 mm

FF
W= 169646 mm³

L= 72,5 mm

D t1 = 25 mm
D

t2 = 80 mm

F/2
F/2 s= L-t1/2-t2/2
B2
t1 s= 20 mm
B1
t2

LL2

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 104

Fax [kN] Faz [kN] R [kN] requ. safety


1200 80 1203 1,25 Safety according to DIN 18800, Part 1, Formula (67)

Steel grade σy σU
Pin 42CrMo4V 550,0 800,0 [N/mm²]

Reduced yield strength σ' = σy/ν


τ' = σ'/1,732
Pin
σ' 440,0 [N/mm²]
τ' 254,0 [N/mm²]

Shearing τm = 4*Q/(P*D²)
Q = F/2
max τ = 1,5*τm
Pin
τm 53,2 [N/mm²]
max τ 79,8 [N/mm²]
Utilization [%] 31

Bolt bending σ= Mb/W

Pin
Mb *) 31500000 [Nmm] *) Mb = F/8 (t2 + 4s + 2t1)
σ 185,7 [N/mm²] See DIN 18800, Part 1, Picture 27
Utilization [%] 42

Von Mises Stresses σv = [σ/σ']² + [τm/τ']²


Pin
σv 0,471 [N/mm²]

Bearing stresses
t1 t2
25 80 [mm]
σlt1 200 125 [N/mm²]
σlt1 345 345 [N/mm²] σy of steel grade ASTM A572, Grade 50
Utilization [%] 58 36

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 105

B) Pins between adapter and stacking bridge, upper hinge

Geometry and loads

L1
D= 120,0 mm

FF
W= 169646 mm³

L= 72,5 mm

D t1 = 40 mm
D

t2 = 80 mm

F/2
F/2 s= L-t1/2-t2/2
B2
t1 s= 12,5 mm
B1
t2

LL2

Fax [kN] Faz [kN] R [kN] requ. safety


2050 350 2080 1,25 Safety according to DIN 18800, Part 1, Formula (67)

Steel grade σy σU
Pin 42CrMo4V 550,0 800,0 [N/mm²]

Reduced yield strength σ' = σy/ν


τ' = σ'/1,732
Pin
σ' 440,0 [N/mm²]
τ' 254,0 [N/mm²]

Shearing τm = 4*Q/(P*D²)
Q = F/2
max τ = 1,5*τm =
Pin
τm 91,9 [N/mm²]
max τ 137,9 [N/mm²]
Utilization [%] 54

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 106

Bolt bending σ= Mb/W

Pin
Mb *) 53812500 [Nmm] *) Mb = F/8 (t2 + 4s + 2t1)
σ 317,2 [N/mm²] See DIN 18800, Part 1, Picture 27
Utilization [%] 72

Von Mises Stresses σv = [σ/σ']² + [τm/τ']²


Pin
σv 0,807 [N/mm²]

Bearing stresses
t1 t2
40 80 [mm]
σlt1 217 217 [N/mm²]
σlt1 345 345 [N/mm²] σy of steel grade ASTM A572, Grade 50
Utilization [%] 63 63

C) Pins between adapter and stacking bridge, lower hinge

Geometry and loads

L1
D= 120,0 mm

FF
W= 169646 mm³

L= 72,5 mm

D t1 = 40 mm
D

t2 = 80 mm

F/2
F/2 s= L-t1/2-t2/2
B2
t1 s= 12,5 mm
B1
t2

LL2

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 4.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 107

Fax [kN] Faz [kN] R [kN] requ. safety


2250 1100 2504 1,25 Safety according to DIN 18800, Part 1, Formula (67)

Steel grade σy σU
Pin 42CrMo4V 550,0 800,0 [N/mm²]

Reduced yield strength σ' = σy/ν


τ' = σ'/1,732
Pin
σ' 440,0 [N/mm²]
τ' 254,0 [N/mm²]

Shearing τm = 4*Q/(P*D²)
Q = F/2
max τ = 1,5*τm =
Pin
τm 110,7
max τ 166,1 [N/mm²]
Utilization [%] 65

Bolt bending σ= Mb/W

Pin
Mb *) 59062500 [Nmm] *) Mb = F/8 (t2 + 4s + 2t1)
σ 348,2 [N/mm²] See DIN 18800, Part 1, Picture 27
Utilization [%] 79

Von Mises Stresses σv = [σ/σ']² + [τm/τ']²


Pin
σv 0,903 [N/mm²]

Bearing stresses
t1 t2
40 80 [mm]
σlt1 261 261 [N/mm²]
σlt1 345 345 [N/mm²] σy of steel grade ASTM A572, Grade 50
Utilization [%] 76 76

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 5.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 108

5. Hydraulic cylinder

Zylinder Forces: LC I Normal operation 910 kN

LC II Normal operation 910 kN


+ oper. wind y
LC III Chute clogging 1300 kN
+ oper. wind y
LC IV Out of operation 850 kN
+ design wind y
LC V Earthquake 1150 kN

LC VI Earthquake 1600 kN
incl. chute clogging

Cylinder data:

Ring area 704 cm²


Working pressure 250 bar
Test pressure 375 bar

max tensile force (250bar)

N= 1760 kN > 1600 kN

Rev.:
Objekt : Codelco-Chile, Gaby Plant Part : J6
Leach Pad Stacking, Ripios Reclaim
and Ripios Disposal Systems
Order No.: MTF Order No: G 0197.10 Chapter : 5.
Client Project No: C-475
TAKRAF GmbH, Torgauer Str. 336 * 04347 Leipzig Seite 109

Rev.: