0% found this document useful (0 votes)
58 views2 pages

MT 253 2

Uploaded by

Mohamed Rashid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views2 pages

MT 253 2

Uploaded by

Mohamed Rashid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

g Nuovo Pignone No.

STD-MT-253-2
COMMISSIONIG page 1 of 2
FIRENZE FORM date

VERTICAL CENTRIFUGAL PUMPS

Pump Item:..........................................................................................................................................
Service:................................................................................................................................................

POS. No. ACTIVITY CHECK DATE NOTES

2.2 Instruments used in testing

1 Clump tester
2 Temporary thermometers

2.3 Initial situation verification


1 End of erection documents
2 Areas and equipments clean
3 Power cables insulation
4 Signalling and control cables tested
5 Electrical motor verified
6 Group aligned (if applicable)
7 Ground connections tested and
tightened
8 Power supply panel energized
3.1 Commissioning activities
1 Load test
2 Functional test

3.2 Final setup

Contractor: Nuovo Pignone: Final Client:

......................................................... ......................................................... .......................................................

STD-MT-253-2 Page 1 of 2
CENTRIFUGAL PUMPS TEST

Pump Item:...........................................Service: .....................................................................................

TEMPERATURES PRESSURES FLOW ELECTRICAL MOTOR


Time
1 2 3 4 5 Amb. suction delivery V A Speed Insulat.
before
-------- --------
starting

00,10

00,20

00,30

00,45

01,00

01,15

01,30

01,45

02,00

After stop

VIBRATION Notes:
Hor. Axial Vertical
Pos. Ampl. Ampl. Ampl.
Veloc. Veloc. Veloc.
1
2
3
4
5

Date: ............................ Test start time: .......................... Test time stop .........................
Contractor: Nuovo Pignone Final Client:

...................................................... ......................................................... .....................................................

STD-MT-253-2 Page 2 of 2