Et 211

Uploaded by

Mohamed Rashid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

g Nuovo Pignone No.

STD-ET-211
COMMISSIONING page 1 of 2
FIRENZE FORM date

MV ELECTRICAL MOTORS

Motor Item:.....................................................................................................................................................

Service:...........................................................................................................................................................
INSTRUMENTS FOR TEST

- Voltage generator for voltage applied test


- 500 - 5000 V megger

Motor insulation M ohm R S T -. ground = NOTES

Polarization
Time R - ( S T ground )= S - (R T ground )= T - ( R S ground )=
1 min.
10 min.
IP =

Load test
Nom. volt. V = Pickup time sec.= Curr.Abs.. A. =

Pickup curr. A = Speed RPM = Direct. of rot.=

Bearings
Bearing 1 - Lubrication Temp. °C =

Bearing 2 - Lubrication Temp. °C =

Instruments
Thermometers
Thermoresistances

2.3 Initial plant situation


Power supply panel energized
Functional tests of control logic
Control cables tested and connected
Power supply cables tested and connected

STD-ET-211 Page 1 of 2
MV ELECTRICAL MOTORS

Ground connection tested and tightened


Motor connected as per project

Coupling uncoupled (where possible).


Mechanical checks
Danger warning bills hanged
3.1 Preliminary checks
Electrical energizing in safety
Heaters (if any)
Insulation resistance of motor
Power supply compartment
Thermic relay calibration
Free rotation of motor by hand
3.2 Functional test
Direction of rotation
3.3 No load test See mechanical Standard

3.4 Load test See mechanical Standard

4.0 Final setup

Contractor Nuovo Pignone: Final Client:

....................................................... .......................................................... .........................................................

STD-ET-211 Page 2 of 2