Kahama Projct
Kahama Projct
Sunday7th,may,2023
Materials
Busckets 6@10,000=60,000
Monday8th,may2023
Printing 4folders =208,000
Materials
Blocks 1000 @1300=1300,000
cement 20bags@22500
Sand1trip@150,000
Thursday11th,may2023
Materials
Blocks 2000@1300=2,600,000
Sand 1trip@150,000
Cement 20bags@22500
[5/13, 10:29]
Materials
R6 for ringbeam 4rollers @160,000=640,000
Binding wire 1roller @75000
Marine board 15pcs@75,000=1,125,000
Mbao 2×4 50pcs @7000=350,000
Misumari 15kg@4500=67500
Cement 90pcs@22,500=2,025,000
Kokoto 3trips@ 350,000= 1050,000
mchanga 1trip@150,000
Nondo 65pcs @23,500= 1,527,500
TOTAL= 7,010,000/=
17th may
Cement 20@22500=450,000
[5/18, 09:48]
Materials
Reflector nzito 10@7,000 =70,000
Ndoo10@10,000=100,000
Jumla=170,000
[5/19, 08:28]
Materials For (settingout)
1.Mbao 150pcs(2×2) @6000=900,000
2.Misumari 10kg @4500=45000
3.kamba20@ 2000=40,000
4.chokaa 4bags@15,000=60,000
5.Markerpen4@ 1000=4000
6.Nyundo2 (5kg)@10,000=20,000
Jumla= 1,069,000
[5/19, 19:22]
Materials
Tofari 2000@1300=2,600,000
Cement 10@22500=225000
jumla=2,825,000
[5/20, 16:06]
sportlights 3pcs 100wats @110,000=
330,000
Wire (1.5)100m @2500=250,000
Tester1=5000
pliers1=10,000
Screwdriver= 5000.
Jumla= 600,000.
[5/22, 07:46]
Mawe trip5@80,000=400,000
[5/22, 07:50]
Cement 20@22500=450,000
[5/22, 10:27]
Materials
Mawe 5trips@80,000=400,000
cement 20@22500= 450,000
Nyundo15kg= 60,000
Jumla=910,000
[5/22, 19:17]
cement 10@22,500=225,000
[5/23, 07:27]
KAZI YA MAWE
Mateials
1:cement 45pcs@22500= 1,012,500
2:mchanga 3trips?@150,000=450,000
3:Mawe 10trips@80,000=800,000
Jumla =2,262,500
[5/23, 14:33]
KAZI YA KUMWAGA MKANDA
Materials
1:Nondo (12mm)113pcs@23,500= 2,655,500
2:cement 90pcs@22,500=2,025,000
3:Misumeno ya chuma2@17,000=34,000
4:R6..4rollers@ 160,000= 640,000
5:Kokoto 3trips@350,000=1,050,000
6:Nondo 15pcs (16mm)@45,000=675,000
Jumla= 7,079,500
[5/25, 14:20]
cementi 10@22,500=225,000
[5/29, 09:39]
Tofati 2000@1300= 2,600,000
cement 30@22500= 675,000
Mchanga 1trip=150,000
Jumla 3,425,000
[5/31, 11:52]
tofari 2000@1,300=2,600,000
[6/2, 12:28]
cement 20@22,500=450,000
[6/3, 09:30]
Materials
Nondo 10@23500= 235,000
cement40pcs@ 22500=900,000
R6(2rollers)@ 160,000= 320,000
Mbao(2×4)25@ 7000=175,000
Misumari10kg@4500=45,000
Mchanga2trips@150,000= 300,000
Kokoto2trips@ 350,000= 700,000
Jumla= 2,675,000
[6/5, 17:50]
Materials For (settingout)
1.Mbao 170pcs(2×2) @6000= 1,020,000
2.Misumari15kg@4500=67,500 3.Chokaa4bags@15000=60,000
Jumla= 1,147,500
[6/7, 08:10]
Materials ya geti
Bati 15@26,000=390,000
Mirunda4@17,000=68,000
Mbao(2*2)12pcs@6,000=72,000
Hinges 4” 12pcs@5000=60,000
Latch(4*4) 4pcs@5000=20,000
Misumari 4” 6kg@4,500=27,000
Misumari ya bati 4kg@10,000=40,000
Jumla=677,000
Jumla ya vyote=1,302,000
[6/7, 09:08]
SAFETY:
Safety boots 3@55,000=165,000
Gamboot 10@17,000=170000
Kofia 10@7,000=70000
Jumla:405,000
[6/7, 09:08]
Nondo(8mm)140pcs@10,500= 1,470,000
Marine(18mm)5pcs@75,000= 375,000
Jumla:1,845,000
[6/8, 08:34]
Marine(18mm)5pcs@75,000= 375,000
Mbao (2*2) za gym 20@6000= 120,000
Mbao(2*2) za mkanda18@ 6000=108,000
Jumla=603,000
[6/12, 08:40]
cement30@ 22,500= 675,000
[6/19, 07:41]
Materials
Mawe 1trip=80,000
Tofari 1000@1300= 1,300,000
Cement 30@22500= 675,000
Jumla= 2,055,000
[6/20, 08:22]
Mpira 50m=150,000
Jumla ya materials=46,376,000
TOTAL(materials,Labourcharges&bills) =74,674,800/=Millions