Kahama Projct

Uploaded by

Baraka Kalinga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views5 pages

Kahama Projct

Uploaded by

Baraka Kalinga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

KAHAMA PROJCT.

(As of 7th,May to 6th,July2023)

Sunday7th,may,2023
Materials
Busckets 6@10,000=60,000

Monday8th,may2023
Printing 4folders =208,000
Materials
Blocks 1000 @1300=1300,000
cement 20bags@22500
Sand1trip@150,000

Thursday11th,may2023
Materials
Blocks 2000@1300=2,600,000
Sand 1trip@150,000
Cement 20bags@22500

[5/13, 10:29]
Materials
R6 for ringbeam 4rollers @160,000=640,000
Binding wire 1roller @75000
Marine board 15pcs@75,000=1,125,000
Mbao 2×4 50pcs @7000=350,000
Misumari 15kg@4500=67500
Cement 90pcs@22,500=2,025,000
Kokoto 3trips@ 350,000= 1050,000
mchanga 1trip@150,000
Nondo 65pcs @23,500= 1,527,500
TOTAL= 7,010,000/=

17th may
Cement 20@22500=450,000

[5/18, 09:48]
Materials
Reflector nzito 10@7,000 =70,000
Ndoo10@10,000=100,000
Jumla=170,000

[5/19, 08:28]
Materials For (settingout)
1.Mbao 150pcs(2×2) @6000=900,000
2.Misumari 10kg @4500=45000
3.kamba20@ 2000=40,000
4.chokaa 4bags@15,000=60,000
5.Markerpen4@ 1000=4000
6.Nyundo2 (5kg)@10,000=20,000
Jumla= 1,069,000

[5/19, 10:24] cement 10 =225,000

[5/19, 19:22]
Materials
Tofari 2000@1300=2,600,000
Cement 10@22500=225000
jumla=2,825,000

[5/20, 16:06]
sportlights 3pcs 100wats @110,000=
330,000
Wire (1.5)100m @2500=250,000
Tester1=5000
pliers1=10,000
Screwdriver= 5000.
Jumla= 600,000.

[5/22, 07:46]
Mawe trip5@80,000=400,000

[5/22, 07:50]
Cement 20@22500=450,000

[5/22, 10:27]
Materials
Mawe 5trips@80,000=400,000
cement 20@22500= 450,000
Nyundo15kg= 60,000
Jumla=910,000

[5/22, 19:17]
cement 10@22,500=225,000

[5/23, 07:27]
KAZI YA MAWE
Mateials
1:cement 45pcs@22500= 1,012,500
2:mchanga 3trips?@150,000=450,000
3:Mawe 10trips@80,000=800,000
Jumla =2,262,500

[5/23, 14:33]
KAZI YA KUMWAGA MKANDA
Materials
1:Nondo (12mm)113pcs@23,500= 2,655,500
2:cement 90pcs@22,500=2,025,000
3:Misumeno ya chuma2@17,000=34,000
4:R6..4rollers@ 160,000= 640,000
5:Kokoto 3trips@350,000=1,050,000
6:Nondo 15pcs (16mm)@45,000=675,000
Jumla= 7,079,500

[5/25, 14:20]
cementi 10@22,500=225,000
[5/29, 09:39]
Tofati 2000@1300= 2,600,000
cement 30@22500= 675,000
Mchanga 1trip=150,000
Jumla 3,425,000

[5/31, 11:52]
tofari 2000@1,300=2,600,000

[6/2, 12:28]
cement 20@22,500=450,000

[6/3, 09:30]
Materials
Nondo 10@23500= 235,000
cement40pcs@ 22500=900,000
R6(2rollers)@ 160,000= 320,000
Mbao(2×4)25@ 7000=175,000
Misumari10kg@4500=45,000
Mchanga2trips@150,000= 300,000
Kokoto2trips@ 350,000= 700,000
Jumla= 2,675,000

[6/5, 17:50]
Materials For (settingout)
1.Mbao 170pcs(2×2) @6000= 1,020,000
2.Misumari15kg@4500=67,500 3.Chokaa4bags@15000=60,000
Jumla= 1,147,500

[6/7, 08:10]
Materials ya geti
Bati 15@26,000=390,000
Mirunda4@17,000=68,000
Mbao(2*2)12pcs@6,000=72,000
Hinges 4” 12pcs@5000=60,000
Latch(4*4) 4pcs@5000=20,000
Misumari 4” 6kg@4,500=27,000
Misumari ya bati 4kg@10,000=40,000
Jumla=677,000

Hesabu ya kuziba ukuta


Bati 15@26,000=390,000
Mbao (2*2) 8pcs@6,000=48,000
Mirunda 6@17000=102,000
Misumari 4”10kg@4,500=45,000
Misumari ya bati 4kg@10,000=40,000
Jumla=625,000

Jumla ya vyote=1,302,000

[6/7, 09:08]
SAFETY:
Safety boots 3@55,000=165,000
Gamboot 10@17,000=170000
Kofia 10@7,000=70000
Jumla:405,000

[6/7, 09:08]
Nondo(8mm)140pcs@10,500= 1,470,000
Marine(18mm)5pcs@75,000= 375,000
Jumla:1,845,000

[6/8, 08:34]
Marine(18mm)5pcs@75,000= 375,000
Mbao (2*2) za gym 20@6000= 120,000
Mbao(2*2) za mkanda18@ 6000=108,000
Jumla=603,000
[6/12, 08:40]
cement30@ 22,500= 675,000

[6/19, 07:41]
Materials
Mawe 1trip=80,000
Tofari 1000@1300= 1,300,000
Cement 30@22500= 675,000
Jumla= 2,055,000

[6/20, 08:22]
Mpira 50m=150,000

Jumla ya materials=46,376,000

Labour charges and bills


kuondoa matuta 650,000
kukata mini na kuondoa visiki 1,040,000
setting ya msingi 650,000
kuchimba msingi wa fence yote 2,470,000
clearance 390,000
kujenga msingiwa fence 6,097,000
Ukuta wa fence 7,605,000
Kumwaga nguzo(fence) 520,000
Kumwaga beam ya juu (fence)1,560,000
Setting out ya majengo 2,210,000
Excavation ya majengo 3,250,000
Resizing depth ya majengo 1,755,000
Electricity bills 101,800
Jumla ya labour charges &bills28,298,800

TOTAL(materials,Labourcharges&bills) =74,674,800/=Millions