0% found this document useful (0 votes)
18 views1 page

Eergo

Uploaded by

kaeldirecto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Eergo

Uploaded by

kaeldirecto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

The work shift at the ABC Company runs from 7:30 a.m. to 4:15 p.m.

with a 45 min break for lunch from 11:30 to 12:15 p.m. that does not
count as part of the work shift (workers are not paid for this time). The
company provides two 12-min rest breaks during working hours (paid
time), one in the morning and one in the afternoon. The company also
allows 25 min per day for personal needs (paid time). In addition, a
work sampling study has shown that on average, unavoidable delays in
the plant result in 20 min lost time per worker per day (paid time).
Determine the PFD allowance factor for the following two management
policies on allowances: (a) the two 12-min breaks are both scheduled
breaks that all workers take at the same time and (b) the two 12-min
breaks are included in the allowance factor so that workers can take
their breaks whenever they please.