Using Pipe Bending Machine
Using Pipe Bending Machine
Using Pipe Bending Machine
DOCUMENT
E/P-UPBM IMPLEMENTED 01/2019 REVISION 01 CONTRACT NO. CDC/3336/19
REFERENCE.
CONSEQUENCE PROBABILITY
H
S
E This Risk Assessment is intended to identify hazards and assess risks
A
Z
V
E PERSONAL
INJURIES
HEALTH ENVIRONMENT
EMPLOYEES
EXPOSED
CORPORATE
IMAGE (MEDIA
ASSETS/ REVENUE
RANDS
Practically
Impossible
Not Likely to
occur
Could Occur
Know n to
occur
Common or
Frequent
associated with the construction work.
R
A COVERAGE) previously Occurrence
I
R
T
D
Y
A B C D E Document Approval
No Injury No effect No effect None No impact No damage 0 1 2 3 4
COMPILED
0
APPROVED BY
F-aid/ M TC case Over-exposure
Slight effect, contained
spill
Negligible
1% - 19%
Slight impact
Slight damage
(<R15 000)
1 2 3 4 5 BY
1
Disabling/ Loss Time Revearsable health M inor Effect, Resgtricted Localised damage
2 3 4 5 6
DATE DATE
Limited impact
Injury condition temporary nature 20% - 39% (<R15 000 - R0,15 M il)
2
Reportable(LTI)
Occupational Disease Localised effect, Significant Localised damage
P ermanent Disability Considderable impact 3 4 5 6 7
Section 25 limited damage 40% - 59% (R0,15 M il - R0.3 M il)
3 Section 24
DOCUMENT
E/P-UPBM IMPLEMENTED 01/2019 REVISION 01 CONTRACT NO. CDC/3336/19
REFERENCE.
Use trained, competent employees only Results in injuries to persons and / or property damage Enforce the use of trained, competent employees only Supervisor
3 D 4 7
Wear appropriate Personal Protective Results in injuries to persons and / or property damage Ensure the correct use of Personal Protective Equipment Supervisor
Equipment, assess which of the following are
4 D 3 6
required in conjunction with the site
conditions and task on hand
Failure to do pre-use inspection Using of faulty equipment resulting in injuries and or
D 3 6
Enforce pre-use inspections against approved check list Supervisor
5 property damage
Failure to use competent trained operators Results in injuries to persons and or property damage
D 4 7
Enforce the use of trained competent operators only Supervisor
6
Set up bender on good, sound level surface Failure will cause bender to fall over causing injuries to Ensure set-up on sound level surface Supervisor
7 persons and / or property damage C 2 4
Insert pipe into bender and ensure: Enough Incorrect handling of pipe can cause injuries to persons Enforce correct handling of pipe Supervisor
8 persons to handle pipe and / or property damage C 3 5
Pipe not skew in machine
After inserting the pipe, employees must more Moving pipe can knock persons over, resulting in injuries Ensure to clear employees from feeder side Supervisor
9 away from bender and pipe (at least one meter) C 3 5
No employees to hold on to pipe on feeder Injuries to employees when hands are pulled into rollers
C 3 5
Ensure nobody is holding onto pipe on feeder side Supervisor
10 side upon start-up of bender
RISK
USING A PIPE BENDING MACHINE CONTRACT NAME
ASSESSMENT
DOCUMENT
E/P-UPBM IMPLEMENTED 01/2019 REVISION 01 CONTRACT NO. CDC/3336/19
REFERENCE.
DOCUMENT
E/P-UPBM IMPLEMENTED 01/2019 REVISION 01 CONTRACT NO. CDC/3336/19
REFERENCE.