Ilovepdf Merged

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Appendix B

4 5

number
Room
wc Designation Remark
2 lift
wc 1 Waiting area
2 Purchasing manager area
3 Supply manager office expansion
3 1 4 Meeting room
7 6
8 9 5 Library
lift 6 Canteen
10
7 Teaching room
12
8 Raw materials store RRMPO №15

9 Finished materials store


18 11 20
10 Gowning ISO 5
lift
13 11 Dispensing area ISO 5
14 12 Washing bay ISO 5
19 21
13 Clear aisle for passage ISO 5
15
14 Sampling area
16 17 15 Gowning ISO 5
16 Utility
17 Store
18 Unloading bay
19 Incoming office
22 22 20 Loading bay
21 Outgoing office
22 Technical area/refuge

6В07201. PMT 19-033k.


Lit. Mass Scale
Meas. Sheet. N docum. Sign. Date
Map legend Develop. Berdibay N. 2023 General plan of Ground floor D 1:1000
Let. symbol Graphical Flow name Supervisor Yeleken G. 2023
Head of dep. Ustenova 2023 Sheet (1) Sheets (7)
Human flow
St. contr. Omyrzakov 2023
Material flow Tech. contr. Kurmanalieva 2023 KazNMU
Appendix G

EXHAUST AIR
FRESH AIR
SEMI HEPA FILTER

FAN AND MOTOR


RETURN AIR SECTION AIR F-9
PLENUM
F SUPPLY AIR F
PLENUM
SUPPLY AIR

G-4 F-6 H-13 HEPA FILTER


G-4 PREFILTER

COOLING COIL HEATING COIL


FINE FILTER MOISTURE ELIMINATOR
PRE FILTER

RETURN AIR

6В07201. PMT 19-033k.


Lit. Mass Scale
Meas. Sheet. N docum. Sign. Date
Develop. Berdibay N. 2023 Equipment scheme of Air D
Supervisor Yeleken G. 2023 Handling Unit
Head of dep. Ustenova 2023 Sheet (6) Sheets (7)
St. contr. Omyrzakov 2023
Tech. contr. Kurmanalieva 2023 KazNMU
Appendix H B4 B4 Designation
Name of medium piped
T7 T7 Letter Graphical
Т7 Т7 Vapour
FP 1
Т8 Т8 Condensate
D E C BG В4 В4 Recycled water (supply)
S PHE Er
Hb В5 В5 Recycled water (return)
Hb Hb Herb Artemisia absinthium
GD Bagasse
BG BG
FJ FJ Filtrated juice
Cr 1 DJ DJ Diffusion juice
B5 SS SS Sugar syrup
R SP FJ
SA SA Syrup Artemisia absinthum
CP CP CP
SV SV SV SV Desig-
SV SV Name Quan. Remark
nation
SV SV SV
B5 B5 D Dryer 1
S Sink 1
T8 T8 E Elevator 1
C Crusher 1
GD Guzenko's diffuser 1
PHE Plate Heat Exchange 1
B4 B4
R Receiver 1
Т7 Т7 CP 1-3 Centrifugal pump 3
Citric acid
FP2 FP 1-2 Filter-press 2
Granulated sugar Hot water
SS Cr 1-3 Collector 3
Er Evaporator 1
CrM1 CrM2 Wastes CP3 SP Screw pump 1
Dis CrM 1-2 Collector-measure 2
SA
MD Mixing device 1
Dis Dissolver 1
FM FM Filling machine 1
CP Condensate pipeline 3
SV Shut-off valve 10
SA
DJ Cr2 MD Cr3

6В07201. PMT 19-033k.


CP2 Lit. Mass Scale
B5 B5
Meas. Sheet. N docum. Sign. Date Apparatus scheme for the
Т8 Т8 Develop. Berdibay N. 2023 production of Artemisia D
Supervisor Yeleken G. 2023 absinthium
Head of dep. Ustenova 2023 Sheet (7) Sheets (7)
St. contr. Omyrzakov 2023
Tech. contr. Kurmanalieva 2023 KazNMU
Appendix F

PRODUCTION ROOM

6В07201. PMT 19-033k.


Lit. Mass Scale
Meas. Sheet. N docum. Sign. Date
Develop. Berdibay N. 2023 Equipment scheme of Air D
Supervisor Yeleken G. 2023 Treatment
Head of dep. Ustenova 2023 Sheet (5) Sheets (7)
St. contr. Omyrzakov 2023
Tech. contr. Kurmanalieva 2023 KazNMU
Appendix D
1 3 4 5

number
Room
Designation Remark
lift
2 1 Female changing room
6
2 Male changing room
3 Quality control area
3 7 4 Qualified persons office
3
8 5 Quality assurance office
11
lift
6 Quality control office expansion
7 Gowning
8 Research and development lab ISO 8
21 9
9 Samples room ISO 8
10 Compression expansion ISO 5
lift
12
11 Dispensed material holding area ISO 5
21
12 Waste room
13 14
13 Washing bay ISO 5
14 Drying and storage ISO 5
21 15
15 Incoming office
16 16 Janitor
21 10 17 Uniform washing room D
17 18
18 Filter washing room D
19
19 Supervisor office
10
20 Works in progress/storage room D
22
21 Tincture preparing room C
20 22
22 22 Syrup preparing room C
23 Engineering workshop area
22 22 22
22
23

6В07201. PMT 19-033k.


Map legend Lit. Mass Scale
Let. symbol Graphical Flow name
Meas. Sheet. N docum. Sign. Date
Human flow Develop. Berdibay N. 2023 General plan of Second floor D 1:1000
Material flow Supervisor Yeleken G. 2023
Head of dep. Ustenova 2023 Sheet (3) Sheets (7)
St. contr. Omyrzakov 2023
Tech. contr. Kurmanalieva 2023 KazNMU
Appendix E
Equipment
marking symbols Deciphering of the equipment

FLOW RATE CONTROLLER

FAN

FILTER

HEATING COIL

WEATHER LOUVRE

Cooling coil with droplet


separator

PREFILTER

TERMINAL FILTER

HUMIDIFIER

AIR HANDLING UNIT

6В07201. PMT 19-033k.


Lit. Mass Scale
Meas. Sheet. N docum. Sign. Date
Develop. Berdibay N. 2023 General plan of Air Flows on D 1:1000
Supervisor Yeleken G. 2023 second floor
Head of dep. Ustenova 2023 Sheet (4) Sheets (7)
St. contr. Omyrzakov 2023
Tech. contr. Kurmanalieva 2023 KazNMU
Appendix С 1 3 4 5 6

number
Room
wc wc
Designation Remark
wc
lift
2 wc wc
1 Female changing room
wc 7
2 Male changing room
3 Meeting area
8 9 10
4 Validation office
14
5 Validation office
lift
6 Human resources office
7 Analyst's office
12
8 Expansion office
9 Kitchen
23 23 lift 10 Gowning ISO 5
15
11
11 Chemistry lab ISO 8
12 Microbiology lab ISO 8
16 17
13 Stability chamber ISO 8
14 Lock and key storage
18
15 Utility
19 16 Washing bay ISO 5
17 Drying and storage ISO 5
20 21 22
13
18 Incoming office
19 Engineering workshop
20 Waste room
23 23 23 23 23 23 23 Janitor room
21
22 Supervisor room
23 Bottling area D

6В07201. PMT 19-033k.


Lit. Mass Scale
Meas. Sheet. N docum. Sign. Date
Map legend D
Let. symbol Graphical Flow name Develop. Berdibay N. 2023 General plan of First floor 1:1000
Supervisor Yeleken G. 2023
Human flow Head of dep. Ustenova 2023 Sheet (2) Sheets (7)
Material flow St. contr. Omyrzakov 2023
Tech. contr. Kurmanalieva 2023 KazNMU

You might also like